HousePrecheckCheck an address

55 Gateway BlvdToronto · zoning, lot size and permit records

≈ 187.4 × 207.7 m24,490 m²on Grenoble Drcorner, also on Gateway Blvd

Not a home

Gateway Public School

The City's school locations place Gateway Public School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • 1 development application open within 300 m, up to 2 storeysNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
N50 m
≈ 187.4 m frontage≈ 207.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (14% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (10% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (24% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit18 113533Closed

    In conjunction with a school on the premises, proposal to erect and display one illuminated ground sign, displaying static copy and readograph copy. The proposed sign contains two sign faces, oriented back-to-back, each sign face measuring 1.34 metres vertically by 2.48 metres horizontally at a height of 3.32 metres above grade. The readograph portion is 0.76 metres vertically by 2.48 metres horizontally.Already approved by variance # 17-265007.**GATEWAY PUBLIC SCHOOL**

    Feb 15, 2018 · 55 GATEWAY BLVD
  • Zoning review17 265007 ZSVClosed
    Nov 20, 2017 · 55 GATEWAY BLVD
  • Building permit14 168056Closed

    To install 3 rooftop photovoltaic arrays on the existing elementary school.

    Aug 7, 2014 · 55 GATEWAY BLVD
  • Zoning review14 188474 ZPRClosed
    Jul 10, 2014 · 55 GATEWAY BLVD
  • Building permit13 274905Closed

    Installation of backflow preventer

    Dec 12, 2013 · 55 GATEWAY BLVD
  • Building permit13 248603Closed

    Proposal for one-storey three-classroom FDK addition to the south-west of existing elementary school (Gateway Public ); interior alterations to classrooms 106, 107 and 108 on the ground floor. Sprinklers charged on this permit.

    Nov 27, 2013 · 55 GATEWAY BLVD
  • Zoning review13 218288 ZPRClosed
    Aug 9, 2013 · 55 GATEWAY BLVD
  • Building permit12 207501Closed

    New portable classroom for Gateway Public School.

    Sep 24, 2012 · 55 GATEWAY BLVD
Show 3 older records
  • Building permit06 193085Closed - Dormant

    Relocation of a portable from another school to this school.

    Mar 26, 2007 · 55 GATEWAY BLVD
  • Building permit01 142576Closed

    RE-ROOFING THE ROOF OF THE SCHOOL

    Jun 19, 2001 · 55 GATEWAY BLVD
  • Building permit01 129272Closed - Dormant

    TO INSTALL PARTITION AND DOORS IN THE FOYER ON THE MAIN FLOOR.

    Apr 26, 2001 · 55 GATEWAY BLVD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
24,490 m²
Frontage
187.4 mestimated, irregular lot
Depth
207.7 mestimated, irregular lot
Street
Grenoble Dr
Corner lot
Yes, also on Gateway Blvd207.7 m along it
Public lane
None
House footprint
6,561 m²roof up to 13.6 m
Back yard
79.5 mhouse to rear lot line
Side yards
10.5 m and 38.1 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct an addition to the existing restaurant and seek a reduction in the number of parking spaces as a result of the construction of a new dual lane drive-thru.

      747 DON MILLS RD · Nov 9, 2023 · 386 m away
    • Minor varianceApproved

      To construct a vestibule on the first floor of the existing office building.

      703 DON MILLS RD · Jun 28, 2018 · 352 m away
    • Minor varianceApproved

      To construct a new canopy and legalize the existing non-compliant lot area, as represented below.

      747 DON MILLS RD · Feb 6, 2013 · 386 m away
    • Minor varianceApproved

      This is an application to permit the construction of two buildings (restaurant and retail uses) on the above noted site.The existing building would be demolished.

      751 DON MILLS RD · Jun 23, 2010 · 491 m away
    • Minor varianceApproved

      This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the conversion of two elementary classrooms within the school into daycare rooms.

      175 GRENOBLE DR · Mar 2, 2006 · 118 m away

    Latest activity nearby

    • Building permit

      REV 01: Smoke Alarm and Smoke Detection Requirements on Fire Damage RestorationProposal for Fire Damage Repairs - fire separation, finishes are to be reinstated to match pre-loss conditions.

      10 SUNNY GLENWAY · Oct 19, 2026 · 184 m away
    • Development application

      Site Plan Control Application proposes a 2-storey (12m) Fire Hall on behalf of the City of Toronto (Toronto Fire Services).

      165 GRENOBLE DR · Sep 3, 2026 · 296 m away · City file
    • Building permit

      Proposed interior alterations to convert the existing office suite to a Massage Therapy Clinic.

      10 GATEWAY BLVD · Jul 30, 2026 · 259 m away
    • Building permit

      Proposal for interior alterations in vestibule 101, 108, door replacement and site improvement works

      175 GRENOBLE DR · Jul 10, 2026 · 118 m away
    • Building permit

      The work is comprised of garage repairs, including expansion joint repairs and slab edge and concrete repairs. No changes to the existing architecture are to be made.

      715 DON MILLS RD · May 22, 2026 · 253 m away
    • Building permit

      Proposal for interior alterations to existing medical office.

      10 GATEWAY BLVD · Apr 29, 2026 · 259 m away
    • Building permit

      Proposal to replace existing fire pump

      735 DON MILLS RD · Aug 1, 2025 · 280 m away
    • Building permit

      Proposal to replace existing fire pump

      725 DON MILLS RD · Aug 1, 2025 · 201 m away
    • Building permit

      Proposal for installation of new drywall to an existing ceiling.

      10 SUNNY GLENWAY · Jul 11, 2025 · 184 m away
    • Building permit

      REV 01: Nursing station and clinical storage layouts revised.renovation of existing exam and nursing station to update office and exam room spaces

      10 GATEWAY BLVD · Apr 2, 2025 · 259 m away

    Neighbourhood: Flemingdon Park

    About the area around the lot, not the lot itself.

    Nearest station
    Aga Khan Park & Museum Station19 min walk
    Nearest TTC stop
    Gateway Blvd South Side at Sunny Glenway East Side1 min walk
    Nearest cycling route
    Gateway BlvdBike Lane - Buffered, 1 min walk
    Nearest traffic count
    12,857 vehicles in 14 hGateway Blvd / Grenoble Dr (South), 60 m away, Apr 23, 2025
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
    Parks
    Flemingdon Park2 min walk
    Gateway Greenbelt3 min walk
    E.T. Seton Park4 min walk

    Schools within 1 km

    • GATEWAY PUBLIC SCHOOL English Public 1 min walk
    • ST JOHN XXIII CATHOLIC ELEMENTARY SCHOOL English Separate 2 min walk
    • VALLEY PARK MDL SCHOOL English Public 7 min walk
    • GRENOBLE PUBLIC SCHOOL English Public 7 min walk
    • MARC GARNEAU COLLEGIATE INSTITUTE English Public 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureFlemingdon ParkMedian neighbourhood
    Median household income (2020)$70,000$84,500
    Households that own their home43%54%
    Population (2021)22,53016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleFlemingdon ParkCity median
    Assault596636.3
    Robbery3869.5
    Shootings11.410.5
    Auto theft235.4192.6
    Theft over $5,00026.646.1
    Break and enter60.7172.8
    Theft from vehicles201.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.