HousePrecheckCheck an address

55 Delisle AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x759)39.0 × 60.4 m2,255 m²on Delisle Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 15 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
39.0 m frontage60.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 118392Closed

    Installation of new maglock and associated devices at two existing exit staircase doors in the 11th floor of the building

    Feb 28, 2024 · 55 DELISLE AVE
  • Building permit19 104895Closed

    Proposal to instal additional fire sprinkler heads in lobby.

    Feb 14, 2019 · 55 DELISLE AVE
  • Building permit18 120094Closed

    Proposal for hydro vault repairs to main Toronto Hydro Standards in existing Condo Building

    Apr 24, 2018 · 55 DELISLE AVE
  • Building permit12 181765Closed

    Proposal to install 1 backflow prevention device in an existing residential condo.

    Jun 22, 2012 · 55 DELISLE AVE
  • Zoning review12 129669 ZSVCancelled
    Feb 29, 2012 · 55 DELISLE AVE
  • Building permit12 112512Closed

    To erect and display one illuminated, static copy wall sign on the northerly elevation first storey wall, in conjunction with a commercial company.

    Feb 27, 2012 · 55 DELISLE AVE
  • Building permit07 284111Closed

    Mag lock permit for condo building - 4 maglocks floor 4 and 8

    Dec 21, 2007 · 55 DELISLE AVE
  • Building permit04 120292Closed

    Sprinkler application in connection with BP#03-112923

    Apr 15, 2004 · 55 DELISLE AVE
Show 5 older records
  • Building permit03 194347Closed

    Underground drains; in connection with BP#03-112923 BLD

    Dec 4, 2003 · 55 DELISLE AVE
  • Building permit03 112923Closednew building

    to construct a new 12-storey residential building and 2 levels of underground parking 68 units. Phase II See permit #00-333019 for Phase I

    Nov 21, 2003 · 55 DELISLE AVE
  • Zoning review03 173710 PLOClosed
    Sep 11, 2003 · 55 DELISLE AVE
  • Building permit02 133735Closed

    Construct temporary sales pavilion.

    May 7, 2002 · 55 DELISLE AVE
  • Building permit02 133732Cancellednew building

    Construct temporary sales office pavilion.

    May 7, 2002 · 55 DELISLE AVE

Check before you build

  • Site-specific exception 900.2.10(759)

    Needs a closer look

    5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(759)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 2 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 262 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 263 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(2) 267 of former City of Toronto By-law 438-86

  5. Older by-law G

    On 55 Delisle Ave., City of Toronto by-law 184-99

5 parts for other addresses
  • E On 15 Delisle Ave., former City of Toronto by-laws 182-72 and 765-85
  • F On 33 Delisle Ave., the even numbered addresses of 48-50 St. Clair Ave. W., former City of Toronto by-law 541-93
  • H On the lands municipally known as 70 Delisle Ave., Section 12 (2) 18 of former City of Toronto By-law 438-86
  • I On 70 Delisle Ave., former City of Toronto by-law 419-67
  • J On 112 St. Clair Ave. W., former City of Toronto by-law 379-67.
By-law 569-2013, Chapter 900

Lot facts

Area
2,255 m²
Frontage
39 m
Depth
60.4 m
Street
Delisle Ave
Corner lot
No
Public lane
None
Max height
16 m
Max lot coverage
—
  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x759) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 11 City trees in front of this lot. The City's street tree inventory lists 11 trees at this address: maple, norway (65 cm), maple, freeman autumn blaze (22 cm), maple, sugar (18 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%26 of 29 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
21

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit additional uses within the existing two-storey non-residential detached building.

    8 LAWTON BLVD · Sep 9, 2026 · 313 m away
  • Minor varianceApproved

    To alter the existing three-storey detached dwelling by reconstructing the rear first floor deck (balcony) with stairs, and to construct a rear at-grade stone patio.

    48 HEATH ST E · Jul 15, 2026 · 450 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a front two-storey addition (above existing garage located at the basement level), and to replace the existing rear deck with a new covered deck and stairs (including new stairs for the basement walkout).

    23 LONSDALE RD · Jun 10, 2026 · 373 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing side (east and west) third storey additions, a rear two-storey addition (including a basement extension) with a rear covered ground level deck and stairs, a rear basement walkout, and a rear third storey rooftop deck.

    63 WALMSLEY BLVD · Jan 28, 2026 · 481 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition. Also, to reconstruct a portion of the front lower level for the use of an integral one-car garage.

    64 BALMORAL AVE · Dec 9, 2025 · 324 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    30 ST CLAIR AVE W · Oct 28, 2027 · 140 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    40 ST CLAIR AVE W · Oct 28, 2027 · 107 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    1 DELISLE AVE · Aug 10, 2027 · 199 m away
  • Building permit

    Proposed localized concrete repairs for an underground parking garage

    45 ST CLAIR AVE W · Nov 24, 2026 · 158 m away
  • Minor variancePending

    Accepted

    103 HEATH ST W · Nov 20, 2026 · 234 m away
  • Building permit

    Proposal to install 1 maglocks in existing office space - UNIT 400

    1 ST CLAIR AVE E · Nov 13, 2026 · 284 m away
  • Building permit

    Proposal for maglock installation.

    2 ST CLAIR AVE W · Nov 10, 2026 · 195 m away
  • Zoning review

    Not Started

    1 HEATH ST E · Nov 9, 2026 · 275 m away
  • Building permit

    Interior alteration to convert an existing Group D office occupancy to a Group D nail salon (beautyparlour/personal service use). Building, Plumbing and HVAC included.

    55 ST CLAIR AVE W · Nov 9, 2026 · 114 m away
  • Building permit

    Proposal for interior alterations including new furniture layout, new finishes, and new partitions for meeting rooms.

    95 ST CLAIR AVE W · Nov 3, 2026 · 194 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
St. Clair Station4 min walk
Nearest TTC stop
St Clair Ave West at Deer Park Cres East Side2 min walk
Nearest cycling route
Yonge StCycle Track, 4 min walk
Nearest traffic count
15,303 vehicles in 14 hSt Clair Ave W / Deer Park Cres, 130 m away, Oct 18, 2025
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
Yorkminster Park Baptist Church Park5 min walk
Amsterdam Square5 min walk
Lawton Parkette5 min walk

Schools within 1 km

  • THE LINDEN SCHOOL Private 7 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 7 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 8 min walk
  • BROWN JR PUBLIC SCHOOL English Public 8 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 8 min walk
  • UPPER CANADA COLLEGE SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.