Building permit open since 2020
Needs a closer lookStill open in the City's records: 20 168660 (Installation of temporary construction water service with back flow preventer and water..., 2020, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)3 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 26 269899 ZON 00 IR (Zoning, 2026); 26 148327 PRS 00 IR (Property Standards, 2026); 26 135276 ZON 00 IR (Zoning, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations3 Committee of Adjustment files on this lot
Good to know2 approved. B0046/23TEY (To obtain consent to sever a lot (with a 50-storey residential building currently under..., 2023); SYS 5330269 (To obtain severanes to allow for:i) 76 of the 100 freehold rental replacment apartment..., 2023); A1013/21TEY (To alter an approved 48-storey residential apartment building with a total of 641 resid..., 2021).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)17 development applications open within 300 m
Good to know17 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 76 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
23 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 269899 ZON 00 IRClosed
Zoning
Nov 15, 2026 · 55 CHARLES ST E - By-law investigation26 148327 PRS 00 IRClosed
Property Standards
Apr 22, 2026 · 55 CHARLES ST E - By-law investigation26 135276 ZON 00 IRClosed
Zoning
Mar 26, 2026 · 55 CHARLES ST E - Zoning review24 139006 LPRClosedApr 22, 2024 · 55 CHARLES ST E
- Consent (lot split)B0046/23TEYApproved
To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.
Nov 29, 2023 · 55 CHARLES ST E - Consent (lot split)SYS 5330269Pending
To obtain severanes to allow for:i) 76 of the 100 freehold rental replacment apartment units located on levels 3-7 of the building to be conveyed to one of the former owners of the subject propertyii) 24 of the 100 freehold rental replacement apartment units also located on levels 3-7 of the building to be conveyed to another former owner of the subject propertyiii) shared ownership by the two former owners of commom areas located on levels 3-7 of the building, made up of hallways, storage and mechanical rooms, amenity areas and a laundry room, along with 25 parking spaces and four locker rooms located on level P4 of the buiding, and a bicycle storage room located on level P1 of the buiding.There are no associated minor variance applications.
Sep 5, 2023 · 55 CHARLES ST E - Zoning review23 168267 ZAPClosedJun 30, 2023 · 55 CHARLES ST E
- Development application22 237123 STE 13 CDClosed
Draft Plan of Standard Condominium to create 565 residential units in a 50-storey residential building.
Dec 7, 2022 · 55 CHARLES ST E · City file
Show 15 older records
- Building permit19 198018Closed
Revision 02 - Revision to Building Permit no. 19 198018 to add 2-storeys and 24 units to original permit. REVISION - as per the cover letterHVAC - Proposal to construct a new 50-storey apartment building containing 541 condominium apartments, 100 rental-replacement apartments, interior and exterior amenity spaces, underground parking, service/utility rooms, loading facilities, and elevators.
Nov 21, 2022 · 55 CHARLES ST E - Minor varianceA1013/21TEYApproved
To alter an approved 48-storey residential apartment building with a total of 641 residential units (including 100 rental replacement units as approved under Site Specific By-law Nos. 1183-2019 and 1184-2019) by permitting an additional 2-storeys and 24 residential units. Overall, this will equate to a 50-storey residential apartment building with a total of 665 residential units.
Dec 1, 2021 · 55 CHARLES ST E - Zoning review21 167913 PSPClosedJun 21, 2021 · 55 CHARLES ST E
- Development application21 167913 STE 13 SAClosed
Site Plan amendment application to add 2-storeys and 24 new residential units to the under construction mixed-use building containing 665 dwelling units. The proposed residential gross floor area is 46,135.00 square metres.
Jun 9, 2021 · 55 CHARLES ST E · City file - Zoning review21 147434 ZPRClosedApr 28, 2021 · 55 CHARLES ST E
- Building permit20 204380Approved
AS-STANDPIPE CONNECTIONS IN STAIRWELLS(Scissor Stairs)Proposal to construct a new 50-storey apartment building containing 541 condominium apartments, 100 rental-replacement apartments, interior and exterior amenity spaces, underground parking, service/utility rooms, loading facilities, and elevators.
Oct 8, 2020 · 55 CHARLES ST E - Building permit20 168660Permit Issued
Installation of temporary construction water service with back flow preventer and water meter. Watrer service to be used for tie-back drilling, dewatering jetting, dust control, filling water tanks, etc.
Aug 19, 2020 · 55 CHARLES ST E - Building permit19 247787Closed
Demolition of existing 3-storey apartment building containing 24 rental units. New replacement building (including replacement of rental units) has been approved, and Building Permit issued. Related applications include: 18 144553 STE 27 OZ; 18 144572 STE 27 RH; 18 150053 STE 27 SA; and Building Permit no. 19 198018.
Apr 3, 2020 · 61 CHARLES ST E - Building permit19 247780Closed
Demolition of existing 9-storey apartment building containing 76 rental units. New replacement building (including replacement of rental units) has been approved, and Building Permit issued. Related applications include: 18 144553 STE 27 OZ; 18 144572 STE 27 RH; 18 150053 STE 27 SA; and Building Permit no. 19 198018.
Apr 3, 2020 · 55 CHARLES ST E - Zoning review18 150053 PSPClosedMay 3, 2018 · 55 CHARLES ST E
- Development application18 150053 STE 27 SAClosed
Site Plan approval application for a 48-storey residential building consisting of a 7-storey podium base building (24.75 metres) and a 41-storey tower element above. The building will be 160.5 metres tall, including the mechanical penthouse, and has a total gross floor area of 46135 square metres. A total of 545 condominium units and 100 rental replacement units are proposed in the building. A total of 156 parking spaces and 666 bicycle parking spaces are proposed. Associated Zoning By-law Amendment application: 18 144553 STE 27 OZ
Apr 27, 2018 · 55 CHARLES ST E · City file - Zoning review18 144553 PRZClosedApr 23, 2018 · 55 CHARLES ST E
- Development application18 144553 STE 27 OZClosed
The application for a Zoning By-law Amendment, Rental Housing Demolition & Conversion, and Site Plan Control proposes a 48-storey residential building consisting of a 7-storey podium base building (24.75 metres) and a 41-storey tower element above. The building will be 160.5 metres tall, including the mechanical penthouse, and has a total gross floor area of 46135 square metres. A total of 665condominium units and 100 rental replacement units are proposed in the building. A total of 156 parking spaces and 666 bicycle parking spaces are proposed.
Apr 16, 2018 · 55 CHARLES ST E · City file - Building permit05 135545Closed
Repair existing balconies & replace railings on all 8 floors 28 new balconies 225m of new ralings
May 31, 2005 · 55 CHARLES ST E - Building permit03 166589Closed
Make interior alterations to the basement level to provide access from the elevator. Existing and proposed: Apartment Building
Sep 16, 2003 · 55 CHARLES ST E
Check before you build
Site-specific exception 900.11.10(196)
Needs a closer look18 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On 55-61 Charles Street East, if the requirements of Section 5 and Schedule A of By-law 1184-2019 are complied with, an apartment building may be constructed, used or enlarged in compliance with Sections
- Rule B
to (R) below; (B) Despite regulations 40.5.1.10(3) and 40.10.40.40(1), the permitted maximum gross floor area of the apartment building is 45,000 square metres
- Rule C
For the purpose of this exception, an apartment building may include a public parking use and any portion of the building below ground used for such purpose is excluded from the calculation of gross floor area
- Rule D
Despite regulations 40.5.40.10(1) and (2), the height of a building or structure is the vertical distance between the Canadian Geodetic Datum elevation of 114.7 metres and the highest point of the building or structure
- Rule E
Despite regulations 40.5.40.10(4) and (5), and 40.10.40.10(1), the permitted maximum height of any building or structure , including any mechanical penthouse containing equipment and structures used for the functional operation of the building described in 40.5.40.10(4), is the height in metres specified by the number following the HT symbol as shown on Diagram 3 of By-law 1184-2019
- Rule F
Despite regulations 40.5.40.10(4) to (7) and (E) above, the following elements of a building may project above the permitted maximum height in Diagram 3 of By-law 1184-2019; (i) equipment used for the functional operation of the building including electrical, utility, mechanical and ventilation equipment, enclosed stairwells, roof access, maintenance equipment storage, elevator shafts, chimneys, and vents may project above the height limits to a maximum of 2.0 metres; (ii) architectural features, parapets, and elements and structures associated with a green roof may project above the height limits to a maximum of 1.0 metre; (iii) building maintenance units and window washing equipment may project above the height limits to a maximum of 6.5 metres; (iv) planters, landscape features, guard rails, and divider screens on a balcony and/or terrace may project above the height limits to a maximum of 2.5 metres; and (v) trellises, pergolas, and unenclosed structures providing safety or wind protection to rooftop amenity space may project above the height limits to a maximum of 3.0 metres
- Rule G
Despite regulation 40.10.40.10(7), the permitted maximum number of storeys in a building is 48
- Rule H
For the purposes of regulation (G) above and regulation (K), the following portions of a building are not a storey : (i) a partial mezzanine level located above the first floor and below the second floor of a building , limited in use to areas used for the functional operation of the building and access thereto, or the second level of dwelling units which contain two levels; and (ii) an upper and lower mechanical penthouse level located above the 48th storey , the lower level of which may include amenity space
- Rule I
The provision of dwelling units is subject to the following: (i) a minimum of 25 percent of the total number of dwelling units , excluding any rental replacement dwelling units , must have two or more bedrooms; (ii) a minimum of 10 percent of the total number of dwelling units , excluding any rental replacement dwelling units , must have three or more bedrooms; (iii) any dwelling units with three or more bedrooms provided to satisfy (ii) above are not included in the provision required by (i) above; and (iv) for the purpose of this regulation (I), the phrase "rental replacement dwelling unit " means one of the 100 rental dwelling units erected on the lands, as referenced in Schedule A of By-law 1184-2019 and secured by an agreement pursuant to Section 37 of the Planning Act
- Rule J
Despite regulations 40.5.40.70 and 40.10.40.70(1), the required minimum building setbacks for a building or structure are shown on Diagram 3 of By-law 1184-2019
- Rule K
Despite regulation 40.10.40.60 and regulation (J) above, the following may encroach into the required minimum building setbacks on Diagram 3 of By-law 1184-2019; (i) canopies and awnings may encroach up to a maximum of 3.0 metres; (ii) cornices, architectural elements, pilasters and eaves, window sills and light fixtures may encroach up to a maximum of 0.5 metres; (iii) stairs, stair enclosures, doors, wheelchair ramps, screens, site servicing features and underground garage ramps and associated structures stairs may encroach any building setback ; and (iv) balconies and terraces located at and above the 9th storey may encroach up to a maximum of 1.5 metres only within the balcony projection areas shown on Diagram 3 of By-law 1184-2019
- Rule L
Despite regulation 40.10.40.50(1), amenity space must be provided at a minimum rate of: (i) 2.14 square metres of indoor amenity space per dwelling unit ; and (ii) 1.17 square metres of outdoor amenity space per dwelling unit
- Rule M
Despite regulation 200.5.10.1 and Table 200.5.10.1, parking spaces must be provided and maintained in accordance with the following: (i) a minimum of 0.2 parking spaces per dwelling unit must be provided for the use of residents of the apartment building ; (ii) a minimum of 0.035 parking spaces per dwelling unit must be provided for visitors and public use, of which a minimum of 7 parking spaces must be provided for the exclusive use of visitors of the apartment building and the remainder may be used for the purpose of public parking ; and (iii) a minimum of 2 parking spaces must be provided for car share vehicles; For the purposes of this exception, "car share" means the practice where a number of people share the use of one or more cars that are owned by a profit or non-profit car sharing organization and where the organization may require that use of cars to be reserved in advance, charge fees based on time and/or kilometres driven, and set membership requirements of the car sharing organization, including the payment of a membership fee which may or may not be refundable, and "car share parking space " means a parking space exclusively reserved and used for car share purposes where the vehicle is accessible to at least the occupants of the building
- Rule N
Despite regulation 200.5.1.10(2)(A)(iv), a maximum of 30 parking spaces may be obstructed on one side in accordance with 200.5.1.10(2)(D) without a requirement to increase the minimum width by 0.3 metres
- Rule O
Regulations 200.15.1.5(1) and 200.15.1(4) with respect to the location of accessible parking spaces do not apply
- Rule P
Despite regulation 230.5.1.10(4), if a stacked bicycle parking space is provided, the minimum width for each bicycle parking space is 0.45 metres
- Rule Q
Prevailing Sections 12(2) 80 and 12(2) 132 of former City of Toronto By-law 438-86 do not apply
- Rule R
Article 600.10.10 Building Setback Overlay District "A", does not apply.
- Older by-law A
Section 12(2) 80 of former City of Toronto By-law 438-86.
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,203 m²
- Frontage
- 45.1 m
- Depth
- 50.2 m
- Street
- Charles St E
- Corner lot
- No
- Public lane
- Macy Dubois Lane, 96.2 m along it
- Max height
- 30 m
- Max lot coverage
- —
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 2.0 (c1.0; r2.0) SS1 (x196) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: maple, norway (44 cm), maple, norway (40 cm), maple, norway emerald queen (35 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 96%23 of 24 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 39
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 336 m away - Minor varianceApproved
To permit the replacement of 4 new mechanical units.
1 MOUNT PLEASANT RD · Apr 9, 2025 · 364 m away - Minor varianceApproved
To convert the existing two-and-one-half-storey townhouse into a mixed-use building.
11 GLOUCESTER ST · Nov 27, 2024 · 272 m away - Minor varianceApproved
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
593 YONGE ST · Nov 27, 2024 · 319 m away - Minor varianceApproved
To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.
680 YONGE ST · Nov 20, 2024 · 254 m away
Latest activity nearby
- Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 190 m away - Building permit
Proposed interior alterations to an existing office
2 BLOOR ST E · Nov 18, 2026 · 265 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 195 m away - Building permit
Proposal for interior alterations to an existing office.
2 BLOOR ST E · Nov 17, 2026 · 265 m away - Building permit
Proposal for interior alterations to an existing office space
121 BLOOR ST E · Nov 10, 2026 · 187 m away - Building permit
Proposal to convert the second floor of Da.Si.Mar Shawarma into a coffee shop with a maximum seating capacity of 30 people
673 YONGE ST · Nov 5, 2026 · 196 m away - Building permit
REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.
2 GLOUCESTER ST · Nov 3, 2026 · 261 m away - Zoning review
Closed
665 YONGE ST · Oct 27, 2026 · 195 m away - Building permit
Proposal to increase occupancy load and change occupancy to group A-2
667 YONGE ST · Oct 27, 2026 · 196 m away - Building permit
Proposal to install two (2) electromagnetic door locks at elevator lobby.
2 BLOOR ST E · Oct 20, 2026 · 265 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Bloor Station6 min walk
- Nearest TTC stop
- Bloor Station - Southbound Platform3 min walk
- Nearest cycling route
- Bloor St ECycle Track, 4 min walk
- Nearest traffic count
- 13,605 vehicles in 14 hCharles St E / Church St, 100 m away, Sep 9, 2025
- Serious collisions within 500 m
- 102021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 4 with cyclists
- Parks
- George Hislop Park2 min walk
- Norman Jewison Park3 min walk
- Charles Street Parkette3 min walk
Schools within 1 km
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 2 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 9 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 9 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 9 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.