Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 7201 open by-law investigation
Needs a closer lookNot resolved in the City's records: 24 195132 000 00 IR (Property Standards, 2024, status Request Received).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations39 building permits open, the oldest since 2006
Needs a closer lookStill open in the City's records: 22 104795 (REV 02: Refer to drawings for overlap areas. Phase 5, 2024.REV 01: Refer to drawings fo..., 2024, status Revision Issued); 23 128968 (Interior alterations to restaurant, 2023, status Inspection); 22 175768 (ADD BOOSTER PUMP AND BACKFLOW PREVENTOR FOR IRRGATION SYSTEM, 2022, status Permit Issued); and 36 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)28 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 250045 ZON 00 IR (Zoning, 2026); 26 231503 PRS 00 IR (Property Standards, 2026); 26 228660 PRS 00 IR (Property Standards, 2026); and 25 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 260958 (1 Wall Sign*****RUDSAK******, 2026); 26 228838 (1 wall sign.***SPIER & MACKAY***, 2026); 26 128570 (Interior alterations to return units back to base building. To include HVAC, and SPRINK..., 2026); and 5 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. A0629/18TEY (To alter the redevelopment plan approved under Site Specific By-law 193-69 by construct..., 2018); A0520/15TEY (To alter the redevelopment plan approved under Site Specific By-law 193-69 by construct..., 2015).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)23 development applications open within 300 m
Good to know23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 94 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
441 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 260958Permit Issued
1 Wall Sign*****RUDSAK******
Nov 10, 2026 · 55 BLOOR ST W - By-law investigation26 250045 ZON 00 IRClosed
Zoning
Oct 6, 2026 · 55 BLOOR ST W - By-law investigation26 231503 PRS 00 IRClosed
Property Standards
Sep 2, 2026 · 55 BLOOR ST W - Building permit26 228838Permit Issued
1 wall sign.***SPIER & MACKAY***
Sep 1, 2026 · 55 BLOOR ST W - By-law investigation26 228660 PRS 00 IRClosed
Property Standards
Aug 31, 2026 · 55 BLOOR ST W - By-law investigation26 224282 PRS 00 IRClosed
Property Standards
Aug 23, 2026 · 55 BLOOR ST W - By-law investigation26 212320 PRS 00 IRClosed
Property Standards
Jul 31, 2026 · 55 BLOOR ST W - Building permit26 204044Closed
Proposed interior alterations of existing LCBO store - check out and merchandising fixtures
Jul 23, 2026 · 55 BLOOR ST W
Show 192 older records
- By-law investigation26 195239 PRS 00 IRClosed
Property Standards
Jul 2, 2026 · 55 BLOOR ST W - By-law investigation26 190417 PRS 00 IRClosed
Property Standards
Jun 24, 2026 · 55 BLOOR ST W - By-law investigation26 172727 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 55 BLOOR ST W - By-law investigation26 172726 000 00 IRClosed
Property Standards
Jun 1, 2026 · 55 BLOOR ST W - By-law investigation26 168037 PRS 00 IRClosed
Property Standards
May 27, 2026 · 55 BLOOR ST W - By-law investigation26 163034 PRS 00 IRClosed
Property Standards
May 19, 2026 · 55 BLOOR ST W - By-law investigation26 161847 PRS 00 IRClosed
Property Standards
May 16, 2026 · 55 BLOOR ST W - Building permit26 145048Closed
Rehabilitation of Underground Parking Garage - Phase 6, 2026Localized concrete repairs and traffic coating replacement within the underground parking garage.
May 14, 2026 · 55 BLOOR ST W - By-law investigation26 152539 PRS 00 IRClosed
Property Standards
Apr 30, 2026 · 55 BLOOR ST W - Building permit26 128570Permit Issued
Interior alterations to return units back to base building. To include HVAC, and SPRINKLER alterations.
Mar 24, 2026 · 55 BLOOR ST W - By-law investigation26 130580 PRS 00 IRClosed
Property Standards
Mar 17, 2026 · 55 BLOOR ST W - Zoning review26 127732 LTOClosedMar 11, 2026 · 55 BLOOR ST W
- Building permit26 110327Permit Issued
Proposal for interior alterations to create a retail unit
Mar 9, 2026 · 55 BLOOR ST W - Building permit25 264183Revision Issued
REV 01: scope of work for Permit Number 25 264183. DELETE from the Scope of Work ALL WORK RELATING to Units 02, 08, 55 & 68, and revise Scope of Work for Unit 102. Include HVAC and SPRINKLER alterations.Proposal for interior alterations to return units back to base building. Includes HVAC, Plumbing & Sprinkler alterations.
Feb 20, 2026 · 55 BLOOR ST W - By-law investigation26 112512 PRS 00 IRClosed
Property Standards
Feb 3, 2026 · 55 BLOOR ST W - By-law investigation26 112466 PRS 00 IRClosed
Property Standards
Feb 3, 2026 · 55 BLOOR ST W - Building permit26 108690Closed
1 Projecting Sign " SWAROVSKI SWAN SYMBOL "
Jan 29, 2026 · 55 BLOOR ST W - By-law investigation25 269718 PRS 00 IRClosed
Property Standards
Dec 24, 2025 · 55 BLOOR ST W - By-law investigation25 227369 PRS 00 IVClosed
Order Issued Property Standards: The floor and every appurtenance, surface cover and finish is not reasonably smooth and level. Namely, Parquet tiles are lifting.
Sep 15, 2025 · 55 BLOOR ST W - By-law investigation25 225622 PRS 00 IRClosed
Property Standards
Sep 15, 2025 · 55 BLOOR ST W - By-law investigation25 223531 PRS 00 IRClosed
Property Standards
Sep 10, 2025 · 55 BLOOR ST W - Building permit25 205439Inspection
1 Wall Sign1 Projecting Sign
Aug 12, 2025 · 55 BLOOR ST W - By-law investigation25 198086 PRS 00 IRClosed
Property Standards
Jul 22, 2025 · 55 BLOOR ST W - Building permit25 189644Closed
1 wall sign**BMO**
Jul 15, 2025 · 55 BLOOR ST W - By-law investigation25 191398 PRS 00 IRClosed
Property Standards
Jul 10, 2025 · 55 BLOOR ST W - By-law investigation25 179765 PRS 00 IRClosed
Property Standards
Jun 18, 2025 · 55 BLOOR ST W - By-law investigation25 176633 ZON 00 IRClosed
Zoning
Jun 13, 2025 · 55 BLOOR ST W - Building permit25 151429Permit Issued
Proposal for replacement of fire alarm without modifications to existing system. Existing devices to be replaced for system compatibility.
Jun 6, 2025 · 55 BLOOR ST W - Building permit25 115085Closed
REV01: Proposed revision: The high-level summary of changes are as follows:we are NOT creating (2) units (entire space to be single unit); seal (3) existing doors and add (1) new double unit back entry on east wall; new glass storefront revised to combination of glass and drywall; add (1) new FHC. To include HVAC and SPRINKLER work.Proposed interior alteration to return part of units back to base building; create (2) units; and add new glass storefront to include HVAC and sprinkers.
Jun 4, 2025 · 55 BLOOR ST W - By-law investigation25 159730 PRS 00 IRClosed
Property Standards
May 15, 2025 · 55 BLOOR ST W - Building permit25 139200Closed
PROPOSAL TO CONSTRUCT INTERIOR ALTERATION TO EXISTING RETAIL SPACE TO SUIT NEW TENANT, WALLS, FLOORING, LIGHTING, PAINT, FIXTURES.
May 7, 2025 · 55 BLOOR ST W - By-law investigation25 116434 PRS 00 IRClosed
Property Standards
Feb 12, 2025 · 55 BLOOR ST W - By-law investigation25 110778 HEA 00 IRClosed
Adequate Heat
Jan 30, 2025 · 55 BLOOR ST W - Zoning review25 108931 LTOClosedJan 27, 2025 · 55 BLOOR ST W
- Building permit24 244014Closed
Proposed Interior Alterations
Jan 7, 2025 · 55 BLOOR ST W - By-law investigation24 248634 PRS 00 IRClosed
Property Standards
Dec 9, 2024 · 55 BLOOR ST W - Building permit24 238099Closed
1 projecting sign**EATALY**
Nov 20, 2024 · 55 BLOOR ST W - Building permit24 223532Closed
Interior fit-out of an optical store - unit 31A
Oct 16, 2024 · 55 BLOOR ST W - By-law investigation24 195132 000 00 IRRequest Received
Property Standards
Aug 8, 2024 · 55 BLOOR ST W - Building permit24 191778Closed
Interior alterations: to return units back to base building; sub-divide into (2) units; and add new glass storefront. To include PLUMBING, HVAC and SPRINKLERS
Aug 8, 2024 · 55 BLOOR ST W - Building permit22 104795Revision Issued
REV 02: Refer to drawings for overlap areas. Phase 5, 2024.REV 01: Refer to drawings for overlap areas.Rehabilitation of Underground Parking Garage - Phase 4, 2023Localized concrete repairs and traffic coating installation within the underground parking garage.underground parking garage repair
Jan 3, 2024 · 55 BLOOR ST W - Building permit23 193688Closed
Application for a permit to erect and display two illuminated wall signs.*****CITY MARKET*****
Aug 29, 2023 · 55 BLOOR ST W - Building permit22 162027Closed
REVISION 01: EXISTING KICHEN EXHAUST UPGRADES.INTERIOR RENOVATION TO SUITE 113 AND SUITE 113A. EXTERIOR RENOVATION TO ENCLOSE EXISTING PATIO WITH GLAZED OPERABLE WINDOWS AND SKYLIGHT.
Aug 3, 2023 · 55 BLOOR ST W - Building permit23 149937Closed
Modify existing sprinkler system. Based on new tenant layout sprinkler system to meet NFPA 13 (2013ED), OBC 2012.
Jun 21, 2023 · 55 BLOOR ST W - Building permit22 188568Closed
Rev 01 - Revising stairwell to remove door. Will be installing smoke baffle to separate floor space under the OBC 3.2.8.2.(5), "exceptions to special protection".
Jun 7, 2023 · 55 BLOOR ST W - Building permit23 145074Closed
To erect and display one first party illuminated wall sign, displaying static copy, located at the first storey on the north elevation.Dimensions:0.55m L x 4.21m W x 0.22m D at a height of 5.15m**Swarovski**
May 18, 2023 · 55 BLOOR ST W - Building permit23 111181Closed
REVISION 01: (INSPECTORS REQUEST) - NEW WASHROOM LAYOUT, REMOVE MOP SINK, REMOVE NEW FHC, ADD POWER DOOR OPERATORS.Proposal for interior alteration to existing retail store.
May 17, 2023 · 55 BLOOR ST W - Building permit23 127517Closed
To erect and display one illuminated, static copy wall sign.***GOODLIFE FITNESS***
May 11, 2023 · 55 BLOOR ST W - Building permit23 128968Inspection
Interior alterations to restaurant
May 4, 2023 · 55 BLOOR ST W - Building permit22 242194Closed
To erect and display two first party illuminated wall signs, displaying static copy, located at the first storey.Dimensions: Sign 1 - 0.63m L x 5.18m W x 0.16m D at a height of 6.03m, on the west elevation.Sign 2 - 0.63m L x 2.06m W x 0.16m D at a height of 6.03m, on the north elevation.*****EARLS KITCHEN & BAR*****
Mar 14, 2023 · 55 BLOOR ST W - Building permit23 106776Closed
Proposal for interior alterations for new restaurant, greater than 30 seats - UNIT 113, "Earls Restaurants Ltd"
Feb 22, 2023 · 55 BLOOR ST W - Zoning review22 224114 ZMPClosedOct 31, 2022 · 55 BLOOR ST W
- Building permit22 175768Permit Issued
ADD BOOSTER PUMP AND BACKFLOW PREVENTOR FOR IRRGATION SYSTEM
Aug 18, 2022 · 55 BLOOR ST W - Building permit22 180635Examiner's Notice Sent
Proposal for hydro vault repairs in an existing mixed use building. Scope of work includes surface concrete repairs, replace steel beams and select walls. Convenience address is 44 Charles St W.Scope of work contains excavation/Shoring within public property.
Jul 22, 2022 · 55 BLOOR ST W - Building permit22 156864Permit Issued
Interior alterations to "Antonio Park Restaurant" on 51st floor
Jul 11, 2022 · 55 BLOOR ST W - Building permit22 160828Cancelled
Requesting standalone plumbing permit for addition of booster pump and backflow preventor for irrigation system.
Jun 12, 2022 · 55 BLOOR ST W - Building permit22 101348Closed
Balcony guard replacement - 51st floor
Jun 3, 2022 · 55 BLOOR ST W - Building permit22 133973Inspection
Proposal for int demo of 2 former retail tenants in suites 023 & 028 located on the Concourse level to return to base bldg conditions. Work incl demo demising walls to reconfigure exist suites (23 & 28), exist storage units & exist service corridor. Proposal for int alts (landlord improvement work) to prep for future tenant improvements in separate bldg permits. Work incl construct demising walls to create new service corridor, 4 new retail units (23, 28, 29, 30) & new storage unit. [Manulife Centre]
May 18, 2022 · 55 BLOOR ST W - Building permit21 206117Closed
Application for a permit to erect and display TWO PROJECTING SIGNS.*****LCBO*****
Oct 1, 2021 · 55 BLOOR ST W - Building permit21 206055Closed
Application for a permit to erect and display 3 illuminated wall signs.*****LCBO*****
Oct 1, 2021 · 55 BLOOR ST W - Building permit21 190865Cancelled
Plumbing - Requesting Building, Plumbing HVAC permit for minor alterations to existing retail suites.Building permit for Suite 001A was previously granted under 19 150287 BLD 00 BABuilding permit for Suite 113 was previously granted under 17 123207 BLD 00 BAThe work in these units were not undertaken as per those permits. Actual work is decribed in this permit application and accompanying drawings.
Jul 28, 2021 · 55 BLOOR ST W - Building permit21 174494Closed
Proposal for interior alterations for retail store suite 058 "Pistil Flowers"
Jul 13, 2021 · 55 BLOOR ST W - Building permit21 140608Closed
Proposal for interior alterations for retail store fitout from vacant use."LCBO" Unit 124
May 14, 2021 · 55 BLOOR ST W - Building permit21 115492Closed
Proposal for interior alterations (landlord improvement) & interior demolition (return to base) to an existing ground floor retail unit 124 in the Manulife Centre. Scope of work includes floor slab in-fill and two barrier free access ramps for egress / exit.
Mar 25, 2021 · 55 BLOOR ST W - Building permit21 101074Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display an illuminated projecting sign, displaying static copy at the 2nd floor on the west elevation.****BAY BLOOR RADIO****
Mar 8, 2021 · 55 BLOOR ST W - Building permit21 109140Closed
Proposal for Mechanical Ventilation System Upgrades to the existing Penthouse of the Apartment Building.
Feb 12, 2021 · 55 BLOOR ST W - Building permit21 103830Closed
Proposal to relocate the main drain line for fixtures and re-position existing shampoo basins.
Feb 8, 2021 · 55 BLOOR ST W - Building permit15 243218Permit Issued
Proposal to install 6 mag locks on the 9th floor of the existing multiple use building.
Dec 14, 2020 · 55 BLOOR ST W - Building permit19 162778Revision Issued
Rev 2: Inclusion of fire hose cabinetRenovate existing retail space *Bay and Bloor Radio* Expand into existing vacant retail space, New finishes, new interior non-loadbearing partitions: rework of existing HVAC and electrical service. No plumbing or structural work to be done.
Dec 8, 2020 · 55 BLOOR ST W - Building permit20 196620Closed
Proposal for interior alterations to a retail unit on the concourse level for a new Retail Service use tenant - 'Canada Post'. Scope of work includes: new partition walls, HVAC, sprinkler, fire alarm.
Nov 9, 2020 · 55 BLOOR ST W - Building permit20 203123Closed
To erect and display a wall sign and a projecting sign both illuminated and displaying static copy. Erected on the first storey of the east elevation of the building. Already approved by SMP #18-125369.****OVER THE RAINBOW****
Oct 22, 2020 · 55 BLOOR ST W - Building permit20 206058Approved
changes to exit stair no. 1
Oct 14, 2020 · 55 BLOOR ST W - Building permit20 197835Closed
To erect and display one illuminated wall sign displaying static copy. Erected on the first storey of the west elevation of the building. Already approved by SMP #18-125369.****BAY BLOOR RADIO****
Oct 8, 2020 · 55 BLOOR ST W - Building permit20 195543Closed
TENANT IMPROVEMENT OF EXPANDED VIP AREA IN EXISTING CINEMA - BASE BUILDING CONSTRUCTION COMPLETED WITH MANULIFE CENTRE EXPANSION.
Oct 5, 2020 · 55 BLOOR ST W - Building permit20 147731Permit Issued
Proposal for interior alterations to 6th and 16th floor of existing office building
Aug 26, 2020 · 55 BLOOR ST W - Building permit20 174932Closed
Proposed interior alterations
Aug 13, 2020 · 55 BLOOR ST W - Building permit20 160822Cancelled
To erect and display three illuminated ground signs.****MANULIFE CENTRE****
Jun 29, 2020 · 55 BLOOR ST W - Building permit20 125085Closed
To erect and display two illuminated wall signs displaying static copy. Erected on the west and east elevations of the building. Already approved by the SMP #18-125369.****MANULIFE CENTRE****
May 5, 2020 · 55 BLOOR ST W - Building permit20 109723Inspection
Proposal to install two maglocks on 51st floor doors in amenities area (residential occupancy) Install power supply and tie into existing base building maglock control system.
Feb 4, 2020 · 55 BLOOR ST W - Building permit17 277201Revision Issued
Revision #4- changes as per coverletter and bubbled drawings
Jan 20, 2020 · 55 BLOOR ST W - Zoning review19 255371 ZMPCancelledNov 28, 2019 · 55 BLOOR ST W
- Building permit19 234537Closed
To erect and display two illuminated wall signs.****INDEPENDENT CITY MARKET****
Nov 18, 2019 · 55 BLOOR ST W - Zoning review19 242281 ZSVClosedOct 28, 2019 · 55 BLOOR ST W
- Building permit19 236803Inspection
Add a new maglock for doo D210 - Idigo Boodkstore in Manulife Centre
Oct 17, 2019 · 55 BLOOR ST W - Building permit19 152572Closed
REVISION - plumbing layout changesProposal for a standalone plumbing permit to install floor drains related to freezer/cooler cases - "Loblaws"
Oct 7, 2019 · 55 BLOOR ST W - Building permit19 183656Closed
REVISION - as per the drawingsProposal to install a heat capture hood NEXT TO the existing HEAT REMOVAL kitchen exhaust system - "City Market"DOES NOT NEED TO COMPLY WITH NFPA 96
Oct 3, 2019 · 55 BLOOR ST W - Building permit19 204216Closed
Proposed interior alterations to ground and second floor washrooms.
Sep 9, 2019 · 55 BLOOR ST W - Building permit19 202183Closed
To erect and display four wall signs and one projecting sign all illuminated and static copy. Two wall signs and the projecting sign erected on northerly elevation, one wall sign on westerly and one wall sign on easterly elevation of the building. (Projecting sign and a wall sign on the north elevation erected at the first storey and all other wall signs erected at the second story of the building)Already approved by signage master plan # 18-125369**EATALY**
Aug 26, 2019 · 55 BLOOR ST W - Zoning review19 204064 LTOClosedAug 12, 2019 · 55 BLOOR ST W
- Building permit19 187874Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one static illuminated wall sign on the northerly building wall (facing Bloor St. W.) The proposed wall sign will be erected on the first storey measuring at 0.66 metres vertically by 6.34 metres horizontally at a height of 5.24 metres above grade.**MANULIFE CENTRE**
Jul 29, 2019 · 55 BLOOR ST W - Building permit19 170310Inspection
Proposal for repairs to existing parking garage south ramp.
Jun 26, 2019 · 55 BLOOR ST W - Building permit19 167847Closed
Proposal for interior alterations to existing residential guest suites on floors 2 and 44 - UNITS 204 and 4409. Conveniece address is 44 Charles St W.
Jun 13, 2019 · 55 BLOOR ST W - Zoning review19 168628 LTOClosedJun 10, 2019 · 55 BLOOR ST W
- Building permit19 150287Closed
Plumbing - Proposed interior alterations to an existing retail unit to bring it back to base for a future tenant fit-out. *Ground floor, unit 102*
Jun 10, 2019 · 55 BLOOR ST W - Building permit19 147061Inspection
In conjunction with a multi-storey building on the premises, proposal to erect and display two wall signs, one overhanging structure sign and a window sign, all illuminated and displaying static copy. A wall sign erected on easterly elevation and all other three signs erected on westerly elevation of the building, all at the second storey.***CINEPLEX CINEMAS***
May 28, 2019 · 55 BLOOR ST W - Building permit19 155995Approved
Proposal for alternative solution: - See 18 1846093.1.5.1 Noncombustible Materials Except as permitted by Sentences (2) to (4) and Articles 3.1.5.2 to 3.1.5.25., 3.1.13.4. and 3.2.2.16., a building or part of a building required to be of noncombustible construction, shall be constructed with noncombustible materials.The grease interceptors (GI) specified are constructed with combustible material. In order to maintain use of the specified GIs, it is proposed as an alternative solution to apply a factory coating of fire resistant paint on the units, which is tested to meet a flame spread value of less than 25 and smoke development value of less than 50. Enclosed is a letter from the GI manufacturer to confirm its testing. In addition to the fire resistant coating on the unit, a new 2-hour fire-rated room will be constructed to house the grease interceptors. We believe that the combination of the above two alternative solutions meets the requirements of OBC clause 3.1.5.1.
May 17, 2019 · 55 BLOOR ST W - Building permit18 238592Closed
Rev 01 - Revision to the travel distances as per the new drawingProposed interior alterations to an existing retail unit on the first floor (Over The Rainbow).
May 7, 2019 · 55 BLOOR ST W - Building permit19 139249Closed
Proposal to alter existing unit 128 for "Pilot Coffee Roasters"
Apr 24, 2019 · 55 BLOOR ST W - Building permit19 133958Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display one static illuminated projecting sign on the northery building wall (facing Bloor St. W..) The proposed projecting sign will be erected on the first storey measuring at 0.65 metres vertically by 0.65 metres horizontally at a height of 3.75 metres above grade. The sign contains two sign faces.****BIRKS GROUP****
Apr 17, 2019 · 55 BLOOR ST W - Building permit19 135763Closed
Proposal for interior alterations to add interior partition between units S128 & S126
Apr 15, 2019 · 55 BLOOR ST W - Building permit19 103654Closed
To erect and display four wall signs and one projecting sign, all illuminated and displaying static copy. Two of the wall signs are to be erected on the northerly elevation (3.45 m by 3.45 m and 4.31 m by 0.37 m), while two of the wall signs (both 4.45 m by 0.40 m) and the projecting sign (0.65 m by 0.65 m) are to be erected on the westerly elevation. **BIRKS GROUP INC**
Apr 11, 2019 · 55 BLOOR ST W - Building permit19 125583Closed
Proposal for interior alterations to existing office building. suite 218
Mar 28, 2019 · 55 BLOOR ST W - Building permit18 266917Closed
Proposal to make interior alternations to existing retail unit 011
Mar 12, 2019 · 55 BLOOR ST W - Building permit19 113033Permit Issued
Proposed installation of new sanitary drains and revisions to existing drains on the ground floor and concourse levels to suit future tenants
Mar 6, 2019 · 55 BLOOR ST W - Building permit19 105638Closed
Proposal for interior alterations to existing retail unit S40 - 'SHOPPERS DRUG MART'
Feb 14, 2019 · 55 BLOOR ST W - Zoning review19 113048 ZMPCancelledFeb 7, 2019 · 55 BLOOR ST W
- Building permit18 270731Closed
Proposal for interior alternations to existing retail unit S060, back to base conditions.
Jan 22, 2019 · 55 BLOOR ST W - Building permit18 266945Closed
Proposal to make interior alternations to existing retail unit 012
Jan 14, 2019 · 55 BLOOR ST W - Zoning review19 102909 LTOClosedJan 10, 2019 · 55 BLOOR ST W
- Building permit18 250661Closed
Proposal to install sprinklers in existing retail space on the ground floor - Unit 152, "Maison Birks"
Nov 29, 2018 · 55 BLOOR ST W - Building permit18 240928Closed
To erect and display one illuminated wall sign displaying static copy on the first storey of the northerly elevation, measuring 6.23 m by 0.71 m at a height of 4.95 m. ****BMO****
Nov 9, 2018 · 55 BLOOR ST W - Building permit18 206815Closed
#1 HVAC REVISION: TO INTERIOR ALTERATION OF AN EXISTING BUILDING.REFER TO MEMORANDUMS FOR DETAILED INFORMATION REGARDING REVISIONS.HVAC - Proposed interior alterations to covert an existing vacant unit into a take-out eating establishment.
Nov 6, 2018 · 55 BLOOR ST W - Building permit18 247438Closed
Proposal for interior alterations to existing retail space on the concourse level of a shopping centre - Unit 060, "Bonny De Catarina"
Oct 31, 2018 · 55 BLOOR ST W - Building permit18 240911Permit Issued
Proposal for new kiosk within existing mercantile space
Oct 25, 2018 · 55 BLOOR ST W - Building permit18 227757Closed
Proposal to install 3 mag locks on 12th floor of existing office.
Sep 21, 2018 · 55 BLOOR ST W - Building permit18 210717Closed
To erect and display one wall sign and one projecting sign, both illuminated and displaying static copy, on the first storey of the westerly elevation, the wall sign emasuring 6.54 m by 2.74 m and the projecting sign measuring 0.61 m by 0.31 m. **INDIGO**
Sep 21, 2018 · 55 BLOOR ST W - Minor varianceA0629/18TEYApproved
To alter the redevelopment plan approved under Site Specific By-law 193-69 by constructing east and west side additions to the first and second floor of the three-storey retail podium that links the 53-storey residential tower and 19-storey office tower.
Sep 20, 2018 · 55 BLOOR ST W - Building permit17 123207Cancelled
REV 04: changes to building permit to include alternative solution changes.
Sep 5, 2018 · 55 BLOOR ST W - Building permit18 171067Closed
REVISION - layout changes as per the drawingsProposal for interior alterations to existing office space on the 12th floor - BMO Financial Group
Sep 4, 2018 · 55 BLOOR ST W - Building permit18 206985Closed
To erect and display one non-illuminated wall sign displaying static copy on the second storey of the westerly elevation, measuring 4.27 metres by 5.18 metres at a height of 11.84 metres. ***INDIGO***
Aug 16, 2018 · 55 BLOOR ST W - Building permit18 196765Permit Issued
Interior alterations to install a steel walkway for safety accessing and servicing the mechanical equipment on the 9th floor.
Aug 15, 2018 · 55 BLOOR ST W - Building permit18 184609Closed
Proposal for interior alterations to unit 020, 120, 220 for new retail market + restaurant "Eataly". Scope of work includes 9 commercial kitchen exhausts.
Jul 26, 2018 · 55 BLOOR ST W - Building permit18 165420Closed
Proposal for interior alterations to ground floor of an existing office building. Tenant - "Bank of Montreal"
Jul 20, 2018 · 55 BLOOR ST W - Building permit18 193871Closed
To erect and display one non-illuminated wall sign displaying static copy on the second storey of the easterly elevation, measuring 14.94 metres by 2.90 metres, at a height of 12.10 metres. *****INDIGO****
Jul 19, 2018 · 55 BLOOR ST W - Building permit18 179921Closed
Interior alterations to existing retail space on the ground floor. Uni S152. Tenant - "Birks".
Jul 17, 2018 · 55 BLOOR ST W - Zoning review18 190908 ZMPCancelledJul 9, 2018 · 55 BLOOR ST W
- Zoning review18 185583 LPRClosedJun 27, 2018 · 55 BLOOR ST W
- Building permit18 159806Approved
Alternative Solution for a pedstrian (bridge) connection between two separate (fire) compartments of the same leasehold space for "Eataly" to meet the objectives of sentence 3.2.8.2(5) OBC.
May 16, 2018 · 55 BLOOR ST W - Building permit18 143832Inspection
Repartitioning of two rooms to create a new meeting room, open offices and servery. Unit 200
May 1, 2018 · 55 BLOOR ST W - Building permit18 149818Permit Issued
Proposal to install electromagnetic locking device on third floor.
Apr 30, 2018 · 55 BLOOR ST W - Zoning review18 146938 ZPRClosedApr 20, 2018 · 55 BLOOR ST W
- Building permit18 135923Cancelled
Proposal to install electromagnetic locking device on third floor.
Mar 28, 2018 · 55 BLOOR ST W - Zoning review18 125369 ZMPClosedMar 6, 2018 · 55 BLOOR ST W
- Building permit18 107891Closed
Interior alterations to an exsiting retail space. Existing tenant to remain.
Feb 7, 2018 · 55 BLOOR ST W - Building permit18 109062Inspection
Installation of (1) double electromagnetic locking device on 18th floor.
Jan 25, 2018 · 55 BLOOR ST W - Building permit17 278825Closed
Proposal for interior alterations to existing office space on the 3rd floor - BMO Financial Group
Jan 24, 2018 · 55 BLOOR ST W - Building permit17 277446Closed
HVAC - Proposal for interior alterations to unit 225 of an existing mixed-use building. Additiong of two rooms (IT and remporary Storage and expansion of the manager office)Tenant - "INDIGO".
Jan 12, 2018 · 55 BLOOR ST W - Building permit17 211002Closed
Rev 01 - Proposed revision to add new HVAC backup cooling and ventilation systam for 24/7 operation.HVAC - Proposal for interior alterations to 18th floor of existing office building. Tenant is Bank of Montreal.
Nov 27, 2017 · 55 BLOOR ST W - Building permit17 177183Cancelled
REV 01; Interior alterations changes bubbledInterior alterations for Nirvana Temp space including plumbing and HVAC works
Oct 27, 2017 · 55 BLOOR ST W - Building permit17 128383Permit Issued
Proposal to construct 2 new steel platforms to allow access for servicing the kitchen ventilation equipment
Oct 27, 2017 · 55 BLOOR ST W - Building permit17 240965Closed
Interior alterations to offices on the 8th floor - BMO - Financial Group
Oct 17, 2017 · 55 BLOOR ST W - Building permit17 236205Approved
Proposed alternative solution for fire protection of Balmuto St elevation for sprinkler protection of glazed wall assembly for existing building *Manulife Centre*.
Sep 20, 2017 · 55 BLOOR ST W - Building permit17 231308Closed
Proposal for interior alterations to existing, unit/suite, on an office building. Unit is on ground floor. Tenant is 'Toronto Eye Care'.
Sep 18, 2017 · 55 BLOOR ST W - Zoning review17 226460 LTOClosedSep 1, 2017 · 55 BLOOR ST W
- Zoning review17 225015 ZPRClosedAug 29, 2017 · 55 BLOOR ST W
- Building permit17 210884Permit Issued
Construct interior alterations for base building washroom upgrades
Aug 24, 2017 · 55 BLOOR ST W - Building permit17 209604Closed
Drain - Proposal for interior alterations for below grade elevator pit at the P3 level of Manulife centre.
Aug 22, 2017 · 55 BLOOR ST W - Building permit17 166455Closed
HVAC - Proposal for interior alterations to existing Group E retail store, converting to Group D office on the concourse level of existing office tower. No specific unit number specified. Refer to Keyplan.
Jul 19, 2017 · 55 BLOOR ST W - Building permit17 140949Inspection
Tenant fit-up of temporary shell space for new jewelry store. For plumbing, HVAC, and emergency systems please refer to previous permit this year by landlord 17-102607 BA.
Jul 17, 2017 · 55 BLOOR ST W - Building permit17 155957Closed
Interior alterations for the BMO vault - Suite B (57.1m2)
Jun 7, 2017 · 55 BLOOR ST W - Building permit17 162643Closed
Structural alterations only to existing structural columns located at P2, P1, Concourse & Ground Floor. See related active application 17 123207 BLD.
May 24, 2017 · 55 BLOOR ST W - Building permit17 102607Closed
Revision to interior layout.
May 23, 2017 · 55 BLOOR ST W - Building permit17 113631Closed
Proposal to instal a specialty system (Kitchen Exhaust)
Apr 11, 2017 · 55 BLOOR ST W - Building permit17 118591Closed
Interior alterations to ground floor commercial unit to convert from restaurant to retail. Suite B.
Apr 6, 2017 · 55 BLOOR ST W - Building permit17 120251Closed
Scope of Permit:Installation of (3) Electromagnetic Locks and associated devoices (card readers, manual pull stations, signage, etc) on 12th floor in accordance with Sentence 3.4.6.16.(4) of the 2012 OBC - Division B.- "BMO"
Feb 24, 2017 · 55 BLOOR ST W - Building permit17 114467Inspection
To add Electromagnetic Lock to Concourse Level LCBO suite 28S.
Feb 9, 2017 · 55 BLOOR ST W - Building permit17 107873Closed
Proposal for interior alterations to unit 228 in existing office - tenant is "Manulife"
Feb 1, 2017 · 55 BLOOR ST W - Building permit16 262507Closed
Proposal for interior alterations to the ground floor for temporary bank office - "BMO"
Jan 20, 2017 · 55 BLOOR ST W - Building permit16 258409Closed
Proposal for interior alterations to the 12th floor of the exsiting office building.
Jan 3, 2017 · 55 BLOOR ST W - Building permit16 254765Closed
HVAC - Proposed interior alterations to the existing office space
Dec 21, 2016 · 55 BLOOR ST W - Building permit16 249924Closed
Proposal for interior demolition to the 12th floor of existing office.
Nov 18, 2016 · 55 BLOOR ST W - Building permit16 247255Cancelled
Proposed interior alterations to the amenities space on 31st floor
Nov 4, 2016 · 55 BLOOR ST W - Building permit16 227879Closed
Proposal for interior alterations to the 14th and 15th floor office space in the existing multiple use building. HVAC and Plumbing is included.
Oct 31, 2016 · 55 BLOOR ST W - Building permit16 243225Permit Issued
Scope of Permit:Installation of two maglocks and associated/anciliiary components on 51st floor access to exit doors in amenities area (residential occupancy) in accordance with Article 3.4.6.16 of 2012 OBC Division B and tie into existing base building maglock control system. Convenience address is 44 Charles St W.
Oct 28, 2016 · 55 BLOOR ST W - Zoning review16 234325 ZPRClosedOct 7, 2016 · 55 BLOOR ST W
- Building permit16 212054Permit Issued
Concrete and waterproofing repairs to underground parking garage.
Aug 26, 2016 · 55 BLOOR ST W - Building permit16 179718Permit Issued
pool dehumidification systems upgrade
Aug 17, 2016 · 55 BLOOR ST W - Building permit16 140934Closed
Proposal to install 1 mag lock at the elevator lobby on the 11th floor of the existing office building.
Jun 6, 2016 · 55 BLOOR ST W - Building permit16 141053Inspection
Proposal to install 9 mag locks on the 9th floor of the existing office building.
Jun 1, 2016 · 55 BLOOR ST W - Building permit16 152205Permit Issued
Installing a ventless Kitchen Exhaust system on the 55th Floor to a existing Restaurant
May 20, 2016 · 55 BLOOR ST W - Building permit16 112611Closed
Interior alternations of an existing office area withing the Bank of Montreal Toronto Tower on the 11th floor. Area to be renovated is 12,278 sf (1,141 sq.m.).
Mar 18, 2016 · 55 BLOOR ST W - Building permit16 109390Closed
install one mag lock on 19th floor, northeast stairwell A
Feb 24, 2016 · 55 BLOOR ST W - Building permit15 243211Closed
Proposal for interior alterations to the 9th floor office space including plumbing HVAC and maglocks in the existing multiple use building.
Nov 6, 2015 · 55 BLOOR ST W - Zoning review15 241339 LTOClosedOct 22, 2015 · 55 BLOOR ST W
- Building permit15 227381Permit Issued
Fire alarm system upgrade for retail freight elevator modernization in an existing multi use, commercial building.
Oct 16, 2015 · 55 BLOOR ST W - Building permit15 197559Closed
Proposal to replace the domestic hot water boiler in an existing commercial building. Convenience address is 44 Charles St W.
Aug 12, 2015 · 55 BLOOR ST W - Minor varianceA0520/15TEYApproved
To alter the redevelopment plan approved under Site Specific By-law 193-69 by constructing front and side additions to the first and second floor of the three-storey retail podium that links the 53-storey residential tower and 19-storey office tower.
Jul 22, 2015 · 55 BLOOR ST W - Building permit15 155751Closed
Proposal for interior alterations to the 6th floor office space in the existing multiple unit building.
May 28, 2015 · 55 BLOOR ST W - Zoning review15 157999 ZPRClosedMay 15, 2015 · 55 BLOOR ST W
- Building permit15 155009Cancelled
Proposal to replace guards on existing north and south patio's on the 51st floor of existing restaurant. Tenant - "The One Eighty Restaurant".
May 11, 2015 · 55 BLOOR ST W - Building permit15 106179Closed
Proposed structural framing alterations and roof repair as it relates to removal and replacement of rooftop chillers. Related to folder 15 106198 MSA 00 MS.
Feb 24, 2015 · 55 BLOOR ST W - Building permit15 106198Closed
Proposal to remove existing chillers and replace 2 rooftop chillers. Related to folder 15 106179 BLD 00 BA.
Feb 13, 2015 · 55 BLOOR ST W - Building permit14 268102Closed
Interior alteration to existing restaurant on 51st floor. Total occupant load = 190 patrons
Feb 11, 2015 · 55 BLOOR ST W - Building permit14 266962Inspection
Proposed interior alterations to tunnel - concourse level
Jan 26, 2015 · 55 BLOOR ST W - Building permit14 210674Permit Issued
Proposal for interior alterations to an existing ground floor retail unit - Bloor Street Market
Jan 6, 2015 · 55 BLOOR ST W - Building permit14 254756Inspection
Proposal for the installation of one mag lock on the 8th floor
Dec 4, 2014 · 55 BLOOR ST W - Zoning review14 257813 PSPClosedNov 28, 2014 · 55 BLOOR ST W
- Building permit14 252065Permit Issued
Proposal to replace 3 existing domestic cold water booster pumps below grade. Convenience address - 44 Charles St W.
Nov 24, 2014 · 55 BLOOR ST W - Development application14 255027 STE 27 SAClosed
To obtain site plan approval to construct a two-storey addition to the existing Manulife Centre which will be for retail purposes.
Nov 21, 2014 · 55 BLOOR ST W · City file - Building permit14 252090Approved
Alternative solution in connection to stand alone plumbing permit 14 252065 PSA in order to use stainless steel piping in lieu of copper.
Nov 14, 2014 · 55 BLOOR ST W - Building permit14 243660Inspection
Proposal for interior alterations on the 10th floor, "BMO Financial Group"
Nov 7, 2014 · 55 BLOOR ST W - Building permit14 231238Inspection
Proposal for interior alterations to existing office space on the 5th floor - BMO Financial Group
Oct 16, 2014 · 55 BLOOR ST W
Showing the latest 200 of 441 records.
Check before you build
Site-specific exception 900.11.10(2486)
Needs a closer look2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86
- Rule D
On 55 Bloor St. W., former City of Toronto by-law 193-69.
- Older by-law A
Despite regulation 40.10.20.100 (2), a Nightclub is not a permitted use. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law D
On 55 Bloor St. W., former City of Toronto by-law 193-69.
4 parts for other addresses
- B On 1166 Bay St. and 1170 Bay St., former City of Toronto by-law 751-77
- C On 50 Bloor St. W., former City of Toronto by-law 499-77
- B On 1166 Bay St. and 1170 Bay St., former City of Toronto by-law 751-77
- C On 50 Bloor St. W., former City of Toronto by-law 499-77
Lot facts
- Area
- 5,153 m²
- Frontage
- 51.6 m
- Depth
- 101.9 m
- Street
- Balmuto St
- Corner lot
- Yes, also on Bloor St W101.9 m along it
- Public lane
- None
- House footprint
- 4,081 m²
- Back yard
- 4.2 mhouse to rear lot line
- Side yards
- 0 m and 4.7 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 10house, garage, sheds
- Max height
- 61 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Bay Street, Bloor Street West. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 7.8 (c4.5; r7.8) SS1 (x2486) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 18 City trees in front of this lot. The City's street tree inventory lists 18 trees at this address: elm (15 cm), elm (13 cm), elm (13 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%26 of 26 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 51
Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards for the mixed-use development (approved a northern building height of 35-storeys (124.5 m) under Site Specific Zoning By-law 302-2023), and increased to 39-storeys (135.5 m as approved under Minor Variance Decision A0018/24TEY), by further increasing the northern building height to 44-storeys (142.75 m, excluding the mechanical penthouse) inclusive of an 11-storey podium base building (38.65 m), increasing the maximum gross floor area, residential gross floor area, and reducing the outdoor amenity spaces. Also, the existing 10-storey office building (located at the southern limits of this subject site) will be maintained and unaltered. There will be a total of 329 residential dwelling units on this lot.
1235 BAY ST · Oct 14, 2026 · 172 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 697-2021(OLT), for a new 50-storey mixed-use building (as approved under Committee of Adjustment Files A0612/23TEY and A0231/25TEY), by increasing the maximum total gross floor area, maximum building height (60.2 m to 61.25 m at the east side portion of the building), altering the minimum building setbacks, and reducing the required bicycle parking spaces. There will be a total of 267 residential dwelling units on this lot.
874 YONGE ST · Aug 5, 2026 · 328 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1050-2015) for the 68-storey mixed-use building (north-east Tower) by increasing the building height from 215 m to 218.6 m (including the height of the mechanical penthouse). Also, to reduce the total number of commercial parking spaces (managed by the Toronto Parking Authority) from 800 to 795 within Parking Levels 1 to 6 (with five parking spaces located on the south-east portion of Parking Level 6 being converted into car wash bays). The existing 196 residential parking spaces on Parking Levels 3 and 4 will be maintained and unaltered.
27-29 YORKVILLE AVE · Jul 15, 2026 · 198 m away - Minor varianceApproved
To alter the existing residential dwelling unit by converting it into two separate residential dwelling units (occupying the second and third storeys of the existing three-storey mixed-use building). Also, to extend the existing commercial unit (currently occupying the ground floor) into the basement.
106 SCOLLARD ST · Jun 10, 2026 · 404 m away - Minor varianceApproved
To permit a massage therapy use on a portion of the ground floor area of the three-storey mixed-use building. The existing recreation use (pilates studio occupying the basement floor), office units (occupying the remaining portion of the ground floor, and the entire second floor), and one residential dwelling unit (occupying the entire third floor) will be maintained and unaltered.
80 SCOLLARD ST · May 6, 2026 · 361 m away
Latest activity nearby
- Zoning review
Application Acceptable
12 CUMBERLAND ST · Nov 24, 2026 · 183 m away - Building permit
1 wall sign + 1 projecting sign***HELLO NORI***
1250 BAY ST · Nov 24, 2026 · 177 m away - Building permit
REVISION - conflicts with the existing building services that necessitated the relocation of the proposed washroomsRemove, relocate and reconfigure interior non loading partitions, adjust hvac, lighting and plumbing to suit new layout.
100 BLOOR ST W · Nov 24, 2026 · 216 m away - Building permit
6 overhanging structure signs**AEVUM**
11 YORKVILLE AVE · Nov 19, 2026 · 229 m away - Building permit
Proposal for new Sprinklers System on the 3rd floor public corridor.
60 BLOOR ST W · Nov 19, 2026 · 68 m away - Building permit
Proposed interior alterations to an existing office
2 BLOOR ST E · Nov 18, 2026 · 276 m away - Building permit
One wall sign.***SIGNATURE HAIR STUDIO***
665 YONGE ST · Nov 18, 2026 · 257 m away - Building permit
Proposal for interior alterations to an existing office.
2 BLOOR ST E · Nov 17, 2026 · 276 m away - Building permit
INTERIOR RENOVATION OF AN EXISTING CONDO SUITE IN EXISTING CONDOMINIUM - UNIT 4802
50 YORKVILLE AVE · Nov 16, 2026 · 250 m away - Zoning review
Not Started
12 CUMBERLAND ST · Nov 12, 2026 · 183 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Bay Station2 min walk
- Nearest TTC stop
- Bloor St West at Bay St East Side1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 1 min walk
- Nearest traffic count
- 11,810 vehicles in 14 hBloor St W / Balmuto St, 70 m away, Mar 24, 2026
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 4 with cyclists
- Parks
- Village of Yorkville Park3 min walk
- St. Mary Street Parkette4 min walk
- Town Hall Square4 min walk
Schools within 1 km
- ROSEDALE DAY SCHOOL Private 5 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 6 min walk
- CAREER QUEST - TORONTO Private 7 min walk
- JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 8 min walk
- MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 8 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.