HousePrecheckCheck an address

548 King St WToronto · zoning, lot size and permit records

Commercial residential employment · CRE (x77)15.9 × 63.6 m990 m²on King St W

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 21 233477 STE 10 CD (*** Draft Plan of Condominium for 95 residential units, 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 22 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.
N20 m
15.9 m frontage63.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 22 114153 (Proposal for interior & minor exterior alterations to return an existing 2nd floor leve..., 2022, status Permit Issued); 20 119699 (Proposed interior alterations to the existing office space on the second level to retur..., 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 21 233477 STE 10 CD (*** Draft Plan of Condominium for 95 residential units, 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 22 development applications open within 300 m

    Good to know

    22 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 201325Closed

    Proposal for interior renovation to change existing office into a yoga studio and wellness centre

    Sep 13, 2024 · 548 KING ST W
  • Building permit24 184476Closed

    Proposal for interior renovation to change existing office into a yoga studio and wellness centre

    Aug 7, 2024 · 548 KING ST W
  • Building permit22 135948Closed

    Plumbing - Proposal for Interior Alterations to an existing 2nd floor to allow for a new restaurant/bar establishment.

    Nov 21, 2022 · 548 KING ST W
  • Building permit22 114153Permit Issued

    Proposal for interior & minor exterior alterations to return an existing 2nd floor level office unit to base building conditions. Exterior alterations to include demo. of small portion of exterior wall.

    Mar 23, 2022 · 548 KING ST W
  • Development application21 233477 STE 10 CDUnder Review

    *** Draft Plan of Condominium for 95 residential units.

    Nov 3, 2021 · 544 KING ST W · City file
  • Building permit20 119699Permit Issued

    Proposed interior alterations to the existing office space on the second level to return unit back to base.

    Apr 16, 2020 · 548 KING ST W
  • Development application19 253990 STE 10 SAClosed

    Site Plan Approval application for a proposed 15-storey mixed-use building comprised of 95 residential dwelling units and 20960 sqaure metres of non-residential office space.

    Nov 26, 2019 · 544 KING ST W · City file
  • Zoning review19 169546 ZPRClosed
    Jun 11, 2019 · 548 KING ST W
Show 11 older records
  • Zoning review19 132123 ZPRClosed
    Mar 28, 2019 · 548 KING ST W
  • Development application18 125163 STE 20 OZClosed

    Zoning By-law Amendment application to permit the redevelopment of the site with a mixed-use building comprised of 12 storeys fronting King Street West containing ground floor retail and office uses above, and a 15-storey residential building fronting Morrison Street. The total height of both portions of the building will be 50 metres, including mechanical elements. Loading access will be off of a public lane north of the site and vehicular access to a below grade garage will be off of Brant Street.

    Mar 6, 2018 · 544 KING ST W · City file
  • Building permit16 119573Closed

    To erect and display one projecting and one wall sign both static and illuminated.**ZOE'S**

    Jun 3, 2016 · 548 KING ST W
  • Building permit16 146601Closed

    Proposal for fire alarm upgrades to all floors of the existing 3 storey multiple use building.

    May 20, 2016 · 548 KING ST W
  • Building permit15 254068Closed

    REVISION - to interior layout, increased occupant load for inside for 277, and patio seating for 95 individuals. Proposal for interior alterations to the existing multiple use building.

    Apr 26, 2016 · 548 KING ST W
  • Zoning review16 133852 ZPRCancelled
    Mar 31, 2016 · 548 KING ST W
  • Building permit16 112509Closed

    In conjunction with a multistorey building on the premises, proposal to erect and display one static non-illuminated wall sign on the first and second storey south elevation. The proposed sign is 1.22 metres vertically by 4.88 metres horizontally at a height of 3.05 metres above grade. **BELFAST LOVE** **FAST TRACK**

    Feb 5, 2016 · 548 KING ST W
  • Building permit12 274180Cancelled

    Create convenience entrance on west elevation (existing two exits unchanged); new lower level entrance walkout for existing restaurant. tenant: 'Zoey's'

    Feb 21, 2013 · 548 KING ST W
  • Zoning review97 026991 LTOClosed
    Oct 30, 1997 · 548 KING ST W
  • Zoning review93 024629 LTOClosed
    Jan 13, 1993 · 548 KING ST W
  • Zoning review92 026332 LTOClosed
    Dec 22, 1992 · 548 KING ST W

Check before you build

  • Site-specific exception 900.12.10(77)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.12.10(77)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 270 of former City of Toronto By-law 438-86

2 parts for other addresses
  • B On 425 Adelaide St. W., former City of Toronto by-law 614-89
  • C On 511 Adelaide St. W., former City of Toronto by-law 288-83.
By-law 569-2013, Chapter 900

Lot facts

Area
990 m²
Frontage
15.9 m
Depth
63.6 m
Street
King St W
Corner lot
No
Public lane
None
House footprint
640 m²roof up to 16.5 m
Back yard
1.6 mhouse to rear lot line
Side yards
0 m and 3 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
23 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: King Street West. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CRE (x77) (Commercial Residential Employment). Chapter 50, section 50.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%14 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
60

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

    485 WELLINGTON ST W · Oct 7, 2026 · 249 m away
  • Minor varianceApproved

    To construct a one-storey enclosed free-standing hospitality kiosk that will be fully serviced and used as a servery for an existing outdoor patio, on this site.

    497 RICHMOND ST W · Aug 20, 2025 · 207 m away
  • Minor varianceApproved

    To alter the existing 10-storey condominium building by installing a rooftop patio (including a pergola, and swim spa with privacy fencing).

    533 RICHMOND ST W · Jul 30, 2025 · 269 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1305-2023) for a new 19-storey mixed-use building, by increasing height projections of equipment and structures.

    8 CAMDEN ST · Jul 30, 2025 · 298 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1061-2014 and 1062-2014) for a 36-storey mixed-use building, to increase the maximum permitted residential gross floor area, and to reduce the rate of ¿short term¿ bicycle parking spaces on-site.

    57 SPADINA AVE · Jul 23, 2025 · 327 m away

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the 9-storey non-residential (office) building (as approved under Site Specific Zoning By-law 718-2025 (OLT)), by increasing the non-residential gross floor area, and increasing the number of storeys to 11-storeys (with a building height of 43.39 m, inclusive of the mechanical penthouse). Also, this building will contain hotel and retail uses, instead of office use. A related Site Plan Control application (File Number 22 242134 STE 10 SA) has received a Notice of Approval Conditions. This site has heritage designation.

    578 KING ST W · Nov 25, 2026 · 74 m away
  • Zoning review

    Not Started

    50 BRANT ST · Nov 24, 2026 · 187 m away
  • Building permit

    Rev 01 - Changing washroom/shower layout and reducing it down to 2 showersCommercial renovation to operate pilates fitness classes in a studio, and enhancing the plumbing to provide 3 washrooms and 3 showers.

    517 WELLINGTON ST W · Nov 23, 2026 · 264 m away
  • Zoning review

    Closed

    50 BRANT ST · Nov 13, 2026 · 187 m away
  • Zoning review

    Not Started

    8 CAMDEN ST · Nov 12, 2026 · 298 m away
  • Building permit

    Interior alterations to Suite 505, scope of work includes mechanical and electrical to suit new layout

    96 SPADINA AVE · Nov 10, 2026 · 263 m away
  • Building permit

    Proposed new catering area in the existing kitchen of a 10th - floor tenant suite in an existing commercial office building, including a new sink, refrigerator and water chiller.

    110 SPADINA AVE · Nov 10, 2026 · 276 m away
  • Building permit

    Proposed an interior alteration, Building, Plumbing and HVAC

    461 KING ST W · Nov 9, 2026 · 189 m away
  • Zoning review

    Closed

    50 BRANT ST · Nov 4, 2026 · 187 m away
  • Building permit

    INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR & MEZZANINE LEVEL GROUP A-2 EATING ESTABLISHMENT ('DEAR GRAIN')

    511 RICHMOND ST W · Nov 4, 2026 · 240 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station17 min walk
Nearest TTC stop
King St West at Portland St East Side2 min walk
Nearest cycling route
Adelaide St WCycle Track, 2 min walk
Nearest traffic count
3,527 vehicles in 14 hKing St W / Brant St, 80 m away, Jun 24, 2025
Serious collisions within 500 m
182021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 7 with cyclists
Parks
St. Andrew's Playground2 min walk
Portland Street Parkette4 min walk
Victoria Memorial Square Park4 min walk

Schools within 1 km

  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 1 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 10 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 12 min walk
  • JEAN LUMB PUBLIC SCHOOL English Public 12 min walk
  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.