HousePrecheckCheck an address

542 Rogers RdToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c2.0; r2.0) SS25.6 × 30.5 m171 m²on Rogers Rdbacks onto Ln N Rogers W Regent

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N10 m
5.6 m frontage30.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    171 m²
    Frontage
    5.6 m
    Depth
    30.5 m
    Street
    Rogers Rd
    Corner lot
    No
    Public lane
    Ln N Rogers W Regent, 5.6 m along it
    Max height
    15 m
    Max lot coverage
    —
    • Zone CR 2.0 (c2.0; r2.0) SS2 (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

    Around this lot

    Minor variances approved
    93%37 of 40 decisions
    Garden suite permits
    4
    Laneway suite permits
    2
    Multiplex permits
    8
    Development applications
    0

    Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached garage in the rear yard.

      19 GILPIN AVE · Jul 16, 2026 · 292 m away
    • Minor varianceApproved

      To construct a new four-storey semi-detached mixed-use building (with a mezzanine level above the ground floor and cantilevered portions of the second, third and fourth storeys at the front and west sides of the building) with a covered front entrance, a rooftop staircase access enclosure (for maintenance), rear balconies on the second, third and fourth storeys with a rear exterior access staircase, and a rear basement walkout. Long-term bicycle parking spaces will be provided within the dwelling units. There will be a total of four residential dwelling units, and one commercial unit within this building.

      451 ROGERS RD · May 27, 2026 · 362 m away
    • Minor varianceApproved

      To construct a new four-storey semi-detached mixed-use building (with a mezzanine level above the ground floor and cantilevered portions of the second, third and fourth storeys at the front and east sides of the building) with a covered front entrance, a rooftop staircase access enclosure (for maintenance), rear balconies on the second, third and fourth storeys with a rear exterior access staircase, and a rear basement walkout. Long-term bicycle parking spaces will be provided within the dwelling units. There will be a total of four residential dwelling units, and one commercial unit within this building.

      449 ROGERS RD · May 27, 2026 · 366 m away
    • Minor varianceApproved

      To convert a portion of the existing parking spaces into 2 new accessible parking spaces and to construct a new accessible entrance.

      600-604 ROGERS RD · Apr 23, 2026 · 242 m away
    • Minor varianceApproved

      To construct a second storey addition above the existing dwelling. The altered dwelling will be a fourplex.

      571 ROGERS RD · Aug 28, 2025 · 125 m away

    Latest activity nearby

    • Building permit

      Proposed Fire Alarm Panel replacement.

      48 REGENT ST · Nov 26, 2026 · 169 m away
    • Zoning review

      Application Acceptable

      241 AILEEN AVE · Nov 23, 2026 · 162 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      84 KERSDALE AVE · Oct 22, 2026 · 141 m away
    • Building permitmultiplex

      Rev 02: To add a window to the second floor.Revision 01 - New foundation walls and footings proposed.-----------------------------------------------------------------------Proposal for new addition over existing 1 storey portion of building, and triplex conversion for 1 unit on each floor.

      201 AILEEN AVE · Oct 13, 2026 · 117 m away
    • Zoning review

      Notice Sent

      552 ROGERS RD · Sep 18, 2026 · 49 m away
    • Building permit

      Proposed retrofit project includes renovating approximately 755m2 of existing interior shared spaces at the P1 and Ground Floor levels. The project also includes accessibility upgrades, improving the common-use areas and exterior circulation for improved barrier-free accessibility. Exterior revitalization along Rogers Rd with new stairs and ramp. Removal and replacement of existing hardscaping to allow for the replacement of waterproofing at the rear terrace and Rogers Rd. colonnade. The rear terrace will be refreshed with new planters, canopy, and shelter.

      600-604 ROGERS RD · Sep 11, 2026 · 238 m away
    • Building permit

      Proposal for new retaining wall.

      1545 KEELE ST · Sep 10, 2026 · 201 m away
    • Building permit

      Proposal to construct a detached private garage in the rear yard.

      19 GILPIN AVE · Aug 13, 2026 · 292 m away
    • Building permit

      Proposal for fire pump replacement

      600 ROGERS RD · Aug 6, 2026 · 242 m away
    • Zoning review

      Notice Sent

      250 DUNRAVEN DR · Jul 22, 2026 · 265 m away

    Neighbourhood: Keelesdale-Eglinton West

    About the area around the lot, not the lot itself.

    Nearest station
    Keelesdale Station16 min walk
    Nearest TTC stop
    Rogers Rd at Scott Rd1 min walk
    Nearest cycling route
    Rogers RdBike Lane, 3 min walk
    Nearest traffic count
    11,141 vehicles in 8 hRogers Rd / Scott Rd, 40 m away, Jan 22, 2020
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Regent Park - Etobicoke1 min walk
    Turnberry North Park7 min walk
    Silverthorn Parkette9 min walk

    Schools within 1 km

    • ST MATTHEW CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
    • YORK MEMORIAL COLLEGIATE INSTITUTE English Public 7 min walk
    • SILVERTHORN COMMUNITY SCHOOL English Public 9 min walk
    • GENERAL MERCER JR PUBLIC SCHOOL English Public 10 min walk
    • SANTA MARIA CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
    • ST NICHOLAS OF BARI CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKeelesdale-Eglinton WestMedian neighbourhood
    Median household income (2020)$77,000$84,500
    Households that own their home59%54%
    Population (2021)11,39016,813
    Homes built in 1960 or before43%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKeelesdale-Eglinton WestCity median
    Assault418.3636.3
    Robbery7169.5
    Shootings23.710.5
    Auto theft189.4192.6
    Theft over $5,00023.746.1
    Break and enter110.5172.8
    Theft from vehicles236.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.