HousePrecheckCheck an address

541 Huron StToronto · zoning, lot size and permit records

184.4 × 57.1 m10,231 m²on Huron St

Not a home

Huron Jr Public School

The City of Toronto's real estate inventory lists Huron Jr Public School here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 11 294201 (Proposal to replace existing fire alarm system in public school, 2011, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 28 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
N50 m
184.4 m frontage57.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2011

    Needs a closer look

    Still open in the City's records: 11 294201 (Proposal to replace existing fire alarm system in public school, 2011, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 28 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 260309 ELS 00 IRClosed

    Election Signs

    Oct 26, 2026 · 541 HURON ST
  • Building permit20 106679Closed

    Proposal for 52 window replacements and localized masonry repairs for existing elementary school.

    Feb 10, 2020 · 541 HURON ST
  • Zoning review14 205363 ZPRClosed
    Aug 12, 2014 · 541 HURON ST
  • Building permit13 279016Closed

    To complete interior alterations to the first floor of the existing "Huron Street" Public School to allow for full day kindergarden.

    Jan 3, 2014 · 541 HURON ST
  • Building permit13 273061Closed

    Proposal to install a 2-1/2" back flow preventer in existing Huron Street Jr Public School.

    Dec 13, 2013 · 541 HURON ST
  • Building permit11 294201Permit Issued

    Proposal to replace existing fire alarm system in public school.

    Nov 21, 2011 · 541 HURON ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
10,231 m²
Frontage
184.4 m
Depth
57.1 m
Street
Huron St
Corner lot
No
Public lane
None
House footprint
1,667 m²roof up to 21.7 m
Back yard
21.4 mhouse to rear lot line
Side yards
14.7 m and 78.9 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: elm, american (75 cm), honey locust (36 cm), honey locust (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
95%35 of 37 decisions
Garden suite permits
5
Laneway suite permits
0
Multiplex permits
21
Development applications
10

Within 300 m, last 10 years. 26 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing rear one-storey ancillary building (containing studio space) by constructing a complete second storey addition with a side (north) access staircase. This ancillary building will not be used as habitable space.

    140 WALMER RD · Aug 12, 2026 · 493 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey rooftop deck.

    13 ADMIRAL RD · Aug 12, 2026 · 238 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (enclose a portion of the existing rear third storey rooftop deck into habitable space).

    32 TRANBY AVE · Aug 5, 2026 · 490 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition, rear second and third storey juliet balconies, and a rear basement walkout.

    33 LOWTHER AVE · Jul 8, 2026 · 473 m away
  • Minor varianceApproved

    To permit the existing seventh dwelling room within the existing two-and-one-half-storey detached building (multi-tenant house). This building will be maintained and unaltered.

    158 MADISON AVE · May 6, 2026 · 434 m away

Latest activity nearby

  • Building permit

    Proposal to repair an existing residential deck damaged by a fallen tree.

    96 MADISON AVE · Nov 20, 2026 · 194 m away
  • Building permit

    Proposed interior alterations to existing residential house. Removal of 2 kitchens and doors. New bedroom door and stair guard on level 3 to be added.

    575 HURON ST · Nov 19, 2026 · 165 m away
  • Building permit

    Revision to the roof designProposal for Structural Remediation at Rear Extension

    559 HURON ST · Nov 18, 2026 · 90 m away
  • Building permit

    HVAC upgrade, replacement of hydronic heating system, ameliorated ventilation

    492 HURON ST · Nov 5, 2026 · 275 m away
  • Building permit

    REPAIRS TO EXISITING REAR SECOND FLOOR DECK

    23 MADISON AVE · Nov 5, 2026 · 298 m away
  • Building permit

    Repairs to existing rear second floor deck

    27 MADISON AVE · Nov 4, 2026 · 284 m away
  • Zoning review

    Not Started

    575 HURON ST · Oct 30, 2026 · 165 m away
  • Zoning review

    Notice Sent

    575 HURON ST · Oct 30, 2026 · 165 m away
  • Building permit

    Interior alterations to include a new in-suite laundry and renovation of 2 bathrooms and kitchen. All new fixtures and new laundry to tie into existing rough-in plumbing locations.

    190 ST GEORGE ST · Oct 14, 2026 · 193 m away
  • Building permit

    Proposal for Underpinning, Basement (Unfinished) and Ground Floor Interior Alterations

    106 BERNARD AVE · Oct 2, 2026 · 240 m away

Neighbourhood: Annex

About the area around the lot, not the lot itself.

Nearest station
Spadina Station4 min walk
Nearest TTC stop
Spadina Rd at Kendal Ave4 min walk
Nearest cycling route
St George StBike Lane, 2 min walk
Nearest traffic count
3,211 vehicles in 8 hLowther Ave / Huron St / Huron Street Playground Trl, 160 m away, May 4, 2005
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Huron Street Playground3 min walk
Taddle Creek Park4 min walk
Paul Martel Park6 min walk

Schools within 1 km

  • HURON STREET JR PUBLIC SCHOOL English Public 1 min walk
  • TADDLE CREEK MONTESSORI SCHOOL Private 5 min walk
  • JACKMAN INSTITUTE OF CHILD STUDY ELEMENTARY SCHOOL University 5 min walk
  • HOWLETT ACADEMY SCHOOL Private 5 min walk
  • THE SHIRE SCHOOL Private 8 min walk
  • UNIVERSITY OF TORONTO SCHOOLS Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAnnexMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home41%54%
Population (2021)29,30016,813
Homes built in 1960 or before40%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAnnexCity median
Assault1080.9636.3
Robbery80.569.5
Homicide5.25.3
Shootings5.210.5
Auto theft116.9192.6
Theft over $5,000114.346.1
Break and enter387.1172.8
Theft from vehicles220.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.