HousePrecheckCheck an address

5400 Yonge StToronto · zoning, lot size and permit records

44.3 × 52.4 m2,091 m²on Horsham Avecorner, also on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 269028 NNY 18 OZ (OPA & Rezoning Application proposes the development of a 45-storey mixed-use building p..., 2025); 21 252165 NNY 18 SA (Site Plan application for a 32-storey residential tower comprised of 533 dwelling units..., 2021); 21 235477 NNY 18 CD (*** 433 dwelling units, 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
44.3 m frontage52.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2012

    Needs a closer look

    Still open in the City's records: 16 115493 (Proposal for interior alterations to existing office space under units 301 and 303 (295m2), 2016, status Inspection); 12 254702 (renovations to second floor office for field gate homes, 2012, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 269028 NNY 18 OZ (OPA & Rezoning Application proposes the development of a 45-storey mixed-use building p..., 2025); 21 252165 NNY 18 SA (Site Plan application for a 32-storey residential tower comprised of 533 dwelling units..., 2021); 21 235477 NNY 18 CD (*** 433 dwelling units, 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 269028 POZClosed
    Mar 18, 2026 · 5400 YONGE ST
  • Development application25 269028 NNY 18 OZUnder Review

    OPA & Rezoning Application proposes the development of a 45-storey mixed-use building providing residential and commercial at grade. The building will provide a total of 699 residential units, being a mix of 1-bedroom, 1-bedroom+den, 2-bedroom, and 3-bedroom units. The building will also provide retail units at grade. A paved access from Canterbury Place along the southern property line will be provided, leading to 3 levels of below-grade parking, providing a total of 197 parking spaces; as well as 531 bicycle parking spaces. The proposed development provides a total GFA of 41,339.89 square metres and a FSI of 12.05. Additionally, the proposed development provides 1,178.27 square metres of indoor amenity space and 1,287.18 square metres of outdoor amenity space.

    Dec 22, 2025 · 5400 YONGE ST · City file
  • Building permit24 222018Closed

    1 Wall Sign

    Oct 10, 2024 · 5400 YONGE ST
  • Zoning review21 252165 PSPClosed
    Jan 11, 2022 · 5400 YONGE ST
  • Development application21 252165 NNY 18 SAUnder Review

    Site Plan application for a 32-storey residential tower comprised of 533 dwelling units with a 4-storey mixed residential and retail podium.

    Dec 30, 2021 · 5400 YONGE ST · City file
  • Development application21 235477 NNY 18 CDUnder Review

    *** 433 dwelling units

    Nov 8, 2021 · 5400 YONGE ST · City file
  • Zoning review18 106120 POZClosed
    Jan 22, 2018 · 5400 YONGE ST
  • Development application18 106120 NNY 23 OZClosed

    The applicant has proposed an Official Plan Amendment and Zoning Bylaw Amendment application for a 32-storey residential tower comprised of 324 dwelling units with a 4-storey mixed residential, retail and commercial podium. A 338 sq. metre Privately-owner Publicly Accessible Space (POPS) is proposed on the western portion of the subject site.

    Jan 17, 2018 · 5400 YONGE ST · City file
Show 8 older records
  • Building permit16 115493Inspection

    Proposal for interior alterations to existing office space under units 301 and 303 (295m2).

    May 19, 2016 · 5400 YONGE ST
  • Building permit12 254702Inspection

    renovations to second floor office for field gate homes

    Oct 22, 2012 · 5400 YONGE ST
  • Zoning review08 231948 ZPRClosed
    Dec 24, 2008 · 5400 YONGE ST
  • Building permit05 120178Closed

    partial renovations of exisiting 3rd floor office

    Apr 5, 2005 · 5400 YONGE ST
  • Zoning review03 193363 LTOClosed
    Nov 14, 2003 · 5400 YONGE ST
  • Building permit03 101745Closed

    INTERIOR ALTERATIONS IN EXISTING OFFICE BUILDING

    Jan 14, 2003 · 5400 YONGE ST
  • Building permit02 171442Closed

    INTERIOR ALTERATION TO EXISTING GROUND FLOOR OFFICE FOR A NEW MEDICAL OFFICE UNIT 110.

    Oct 1, 2002 · 5400 YONGE ST
  • Building permit00 131831Closed

    INSTALLING ONE ELECTROMAGNETIC LOCK 'FIELDGATE' ON THE 2nd FLOOR

    Mar 17, 2000 · 5400 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,091 m²
Frontage
44.3 m
Depth
52.4 m
Street
Horsham Ave
Corner lot
Yes, also on Yonge St52.4 m along it
Public lane
None
House footprint
689 m²roof up to 28.2 m
Back yard
5.6 mhouse to rear lot line
Side yards
2.6 m and 11.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%14 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    18

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a four-storey apartment building with 14 residential units. This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

      72 CHURCH AVE · Oct 23, 2025 · 359 m away
    • Minor varianceApproved

      To alter the development standards (as approved by Site-Specific Zoning By-law Nos. 1118-2022(OLT) and 131-2025) for the proposed 40-storey mixed use building, to permit a nursing home, increase the podium height, reduce the overall tower height, increase the total gross floor area, reduce the non-residential gross floor area, and reduce the residential parking rate.

      5306 YONGE ST · Aug 14, 2025 · 221 m away
    • Minor varianceApproved

      To permit a video games arcade use accessory to the retail use. The existing retail use will be maintained. No physical interior or exterior changes are being proposed.

      5580 YONGE ST · Jun 26, 2025 · 498 m away
    • Minor varianceApproved

      To alter the previously approved 26-storey residential building under site-specific By-law 409-2024 related to balcony projections, the location of accessible parking spaces, the minimum percentage of three-bedroom units and setbacks from the One Family Detached Dwelling Zone. This application was previously deferred at the Committee of Adjustment hearing on March 20, 2025.

      26 HOUNSLOW AVE · May 1, 2025 · 127 m away
    • Minor varianceApproved

      To increase the total gross floor area, permitted building height and number of storeys and reduce residential parking space rate. Related By-law No.1118-2022(OLT) and By-law No. 131-2024.

      5306 YONGE ST · Mar 6, 2025 · 221 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards, as approved under Site Specific By-laws 409-2024 and 1308-2025, for the proposed 21-storey residential building, including modifying the building heights and storeys, setbacks, balcony projections, amenity space and parking requirements.

      28 HOUNSLOW AVE · Nov 26, 2026 · 132 m away
    • Building permit

      Proposal for commercial plumbing systems.

      5372-5374 YONGE ST · Nov 5, 2026 · 42 m away
    • Zoning review

      Closed

      5 NORTHTOWN WAY · Nov 4, 2026 · 87 m away
    • Building permit

      Proposed interior alterations including relocating washroom and adding a staff room. No change in structure, fire alarm or sprinkler system.

      5429 YONGE ST · Oct 16, 2026 · 179 m away
    • Zoning review

      Closed

      5293 YONGE ST · Oct 7, 2026 · 236 m away
    • Building permit

      Proposal for commercial kitchen ventilation.

      5372-5374 YONGE ST · Oct 6, 2026 · 42 m away
    • Building permit

      2 WALL SIGNS**FOOD BASICS**

      20 CHURCH AVE · Oct 5, 2026 · 143 m away
    • Building permit

      Replacement of existing fire alarm panels and the addition of a new panel for block 900

      100 GRANDVIEW WAY · Sep 25, 2026 · 253 m away
    • Building permit

      Proposed replacement of two existing air handling units

      5444 YONGE ST · Sep 21, 2026 · 207 m away
    • Building permit

      2 WALL SIGNS**FOOD BASICS**

      5383 YONGE ST · Sep 16, 2026 · 129 m away

    Neighbourhood: Willowdale West

    About the area around the lot, not the lot itself.

    Nearest station
    Finch Station10 min walk
    Nearest TTC stop
    Yonge St at Churchill Ave2 min walk
    Nearest cycling route
    Finch Corridor TrlMulti-Use Trail, 12 min walk
    Nearest traffic count
    28,181 vehicles in 14 hYonge St / Horsham Ave / Northtown Way, 60 m away, Oct 15, 2026
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Kempford Parkette3 min walk
    McKee Parkette3 min walk
    Northtown Park3 min walk

    Schools within 1 km

    • ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • MCKEE PUBLIC SCHOOL English Public 5 min walk
    • DARYK HIGH Private 6 min walk
    • TORONTO FRENCH MONTESSORI Private 6 min walk
    • CROWN ACADEMY Private 7 min walk
    • TFS Private 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWillowdale WestMedian neighbourhood
    Median household income (2020)$76,500$84,500
    Households that own their home60%54%
    Population (2021)17,16016,813
    Homes built in 1960 or before19%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWillowdale WestCity median
    Assault561.2636.3
    Robbery51.969.5
    Auto theft89.6192.6
    Theft over $5,00037.746.1
    Break and enter103.7172.8
    Theft from vehicles141.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.