HousePrecheckCheck an address

540 Evans AveToronto · zoning, lot size and permit records

Employment · E 1.042.7 × 51.2 m2,147 m²on Beta Stcorner, also on Evans Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
42.7 m frontage51.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 132661 PRS 00 IRClosed

    Property Standards

    Mar 20, 2026 · 540 EVANS AVE
  • Zoning review24 177169 ZAPApplication On Hold
    Jul 9, 2024 · 540 EVANS AVE
  • Zoning review24 152909 LTOClosed
    May 23, 2024 · 540 EVANS AVE
  • Building permit22 219274Closed

    Revision 01 - remove existing glazing and overhead doors and replace with new glazing door system update plumbing and HVACProposed interior alterations to an existing convenience store

    Oct 27, 2023 · 540 EVANS AVE
  • Building permit01 180696Closed

    Weather Canopy to Gas Station *SIPCO*.

    Jul 22, 2008 · 540 EVANS AVE
  • Zoning review02 131229 ZPRClosed
    Apr 30, 2002 · 540 EVANS AVE
  • Zoning review02 107704 ZSVClosed
    Feb 1, 2002 · 540 EVANS AVE

Lot facts

Area
2,147 m²
Frontage
42.7 m
Depth
51.2 m
Street
Beta St
Corner lot
Yes, also on Evans Ave51.2 m along it
Public lane
None
House footprint
666 m²roof up to 6.6 m
Back yard
0.3 mhouse to rear lot line
Side yards
4.9 m and 9 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
91%20 of 22 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
3
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a partial second storey addition above the existing building.

    518 EVANS AVE · Jun 25, 2020 · 155 m away

Latest activity nearby

  • Building permit

    Proposed new 6'-0" x 8'-0" exterior door opening at ground and new deck

    258 BETA ST · Nov 23, 2026 · 294 m away
  • Building permit

    Installation of a new wood stove and pre-manufactured chimney in an existing space

    283 BETA ST · Jun 29, 2026 · 131 m away
  • Building permit

    Outside Back Water Valve Installation

    7 SILVERCREST AVE · Apr 23, 2026 · 227 m away
  • Building permit

    Proposal for a new garage and rebuild of existing front porch and stairs

    278 DELTA ST · Apr 21, 2026 · 284 m away
  • Building permitgarden suite

    REV 01: per drawingsTo construct a rear garden suite

    24 SILVERCREST AVE · Mar 27, 2026 · 260 m away
  • Zoning review

    Notice Sent

    111 BROCKHOUSE RD · Jan 20, 2026 · 274 m away
  • Zoning review

    Notice Sent

    111 BROCKHOUSE RD · Jan 20, 2026 · 274 m away
  • Zoning review

    Application On Hold

    290 DELTA ST · Jan 12, 2026 · 233 m away
  • Building permit

    Proposal for 1 storey sunroom addition at the rear yard

    283 BETA ST · Jan 7, 2026 · 131 m away
  • Building permitgarden suite

    REV 01: PROPOSED CANOPY Proposal to construct a new 2 storey garden suite in the rear yard

    284 DELTA ST · Jan 7, 2026 · 258 m away

Neighbourhood: Alderwood

About the area around the lot, not the lot itself.

Nearest station
Long Branch GO Station37 min walk
Nearest TTC stop
Evans Ave at The East Mall2 min walk
Nearest traffic count
11,839 vehicles in 8 hEvans Ave / Beta St, 40 m away, Sep 14, 2021
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Douglas Park6 min walk
Alderwood Memorial Park11 min walk
Connorvale Park16 min walk

Schools within 1 km

  • LANOR JR MDL SCHOOL English Public 6 min walk
  • NEW HAVEN LEARNING CENTRE FOR CHILDREN Private 12 min walk
  • ST AMBROSE CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAlderwoodMedian neighbourhood
Median household income (2020)$106,000$84,500
Households that own their home77%54%
Population (2021)12,59516,813
Homes built in 1960 or before54%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAlderwoodCity median
Assault508.1636.3
Robbery69.669.5
Shootings710.5
Auto theft222.7192.6
Theft over $5,000104.446.1
Break and enter201.9172.8
Theft from vehicles132.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.