HousePrecheckCheck an address

54 Fraser AveToronto · zoning, lot size and permit records

Also 58 Fraser Ave, 60 Fraser Ave

44.1 × 38.3 m1,601 m²on Fraser Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 108662 STE 10 OZ (Combined Official Plan & Rezoning for a 55-storey mixed-use building that will incorpor..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N20 m
44.1 m frontage38.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 222052 (To install 1 Backflow Prevention Devices (Water only), 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 108662 STE 10 OZ (Combined Official Plan & Rezoning for a 55-storey mixed-use building that will incorpor..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    1 approved. A0784/18TEY (Proposal for multiple projects to an existing 2 storey office building. Scope of work i..., 2018); A0014/15TEY (To convert a 43.66 square metre portion of an office building into a take out restaurant, 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Development application25 108662 STE 10 OZOMB Appeal

    Combined Official Plan & Rezoning for a 55-storey mixed-use building that will incorporate the existing building facade. The proposal consists of a total of 732 residential dwelling units and approximately 44,379 square metres of total GFA, including approximately 1,140 square metres of office space with a resulting density of 16.6 FSI.

    Jan 24, 2025 · 54 FRASER AVE · City file
  • Zoning review21 210786 ZZUClosed
    Sep 10, 2021 · 54 FRASER AVE
  • Building permit18 220755Closed

    Proposal for interior alterations units 58, 58B, 60A for office use.

    Dec 27, 2018 · 54 FRASER AVE
  • Minor varianceA0784/18TEYWithdrawn

    Proposal for multiple projects to an existing 2 storey office building. Scope of work includes alterations to existing building and new 3rd to 8th floor additions including mechanical penthouse.Address includes 54-60 Fraser Ave.

    Aug 10, 2018 · 54 FRASER AVE
  • Zoning review18 184136 ZPRClosed
    Jun 25, 2018 · 54 FRASER AVE
  • Building permit16 222052Inspection

    To install 1 Backflow Prevention Devices (Water only).

    Sep 15, 2016 · 54 FRASER AVE
  • Zoning review16 143818 LTOClosed
    Apr 21, 2016 · 54 FRASER AVE
  • Zoning review15 256059 LPRClosed
    Nov 24, 2015 · 54 FRASER AVE
Show 8 older records
  • Minor varianceA0014/15TEYApproved

    To convert a 43.66 square metre portion of an office building into a take out restaurant.

    Feb 25, 2015 · 54 FRASER AVE
  • Zoning review14 230114 LPRClosed
    Sep 30, 2014 · 54 FRASER AVE
  • Zoning review14 210477 LTOClosed
    Aug 22, 2014 · 54 FRASER AVE
  • Building permit13 101246Closed

    Proposal to demolish exisitng shed on the south-west wall of existing building

    May 6, 2013 · 54 FRASER AVE
  • Building permit13 144636Cancelled

    Proposal for interior alterations to existing industrial building to create office spaces (scope of work includes the creation of new common entrance, new stairs to the second floor suite and demolition of partitions.)

    Apr 4, 2013 · 54 FRASER AVE
  • Building permit05 208891Closed

    Temporary scenic wall on boulevard on outside for film set building address is 58A fraser ave.

    Dec 9, 2005 · 54-58 FRASER AVE
  • Building permit83 015151Closed - Dormant
    May 10, 1983 · 54-58 FRASER AVE
  • Building permit82 025573Closed - Dormant
    Feb 4, 1983 · 54-58 FRASER AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,601 m²
Frontage
44.1 m
Depth
38.3 m
Street
Fraser Ave
Corner lot
No
Public lane
None
House footprint
688 m²roof up to 23.6 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 9.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: pine, austrian (42 cm), maple, manitoba (30 cm), elm (18 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%8 of 9 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
8
Development applications
11

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).

    47 FRASER AVE · Mar 5, 2025 · 45 m away
  • Minor varianceApproved

    To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).

    41 FRASER AVE · Mar 5, 2025 · 54 m away
  • Minor varianceApproved

    To alter the existing four-storey, non-residential building (including office/workshop and studio/retail and service shop/commercial school uses) by increasing the permitted floor space index and reducing the number of parking spaces to zero.

    135 LIBERTY ST · Sep 25, 2024 · 96 m away
  • Minor varianceApproved

    To convert the existing Suite (Unit 303), within the three-storey commercial building, from an office space use to a showroom use.

    109 ATLANTIC AVE · Sep 13, 2023 · 433 m away
  • Minor varianceApproved

    To convert the existing 5-storey building from 56 units to 60 units by converting a portion of the underground garage into residential suites and amenity space.

    47 SPENCER AVE · Feb 15, 2023 · 434 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    41 FRASER AVE · Nov 26, 2026 · 54 m away
  • Building permit

    Revision to the following areas - P3 shaft wall added to drawing A010 attached..P2 wall on the north side of the Mechanical Room has been replaced with P3 shaft wall, see drawing A201, attached Details added for the rating of the existing steel beams above the Mechanical room with cementitious fire spray, refer to drawing A602, attached.Addition of entry vestibule. Refer to schedule drawing A011-2, vestibule drawings A012-2, and plans on A201Proposed interior alteration of an existing space into a reception area.

    15 FRASER AVE · Nov 24, 2026 · 185 m away
  • Zoning review

    Not Started

    42 FRASER AVE · Nov 10, 2026 · 44 m away
  • Building permit

    Proposal to construct temporary air supported structure at Lamport Stadium. Erected October 27, 2026 to April 30, 2027

    1155 KING ST W · Nov 10, 2026 · 264 m away
  • Building permit

    Proposal for loading dock replacement

    41 FRASER AVE · Nov 9, 2026 · 54 m away
  • Building permit

    REV 01: Fire protection planProposal for interior alterations

    2-20 FRASER AVE · Nov 5, 2026 · 210 m away
  • Zoning review

    Cancelled

    109 JEFFERSON AVE · Oct 28, 2026 · 300 m away
  • Building permit

    Interior cosmetic upgrades including in-suite laundry addition for Unit 309.No changes to existing HVAC - no HVA permit required.

    99 TYNDALL AVE · Oct 9, 2026 · 277 m away
  • Building permit

    Proposal for interior alterations to existing Group D occupancy for Zoomermedia

    70 JEFFERSON AVE · Oct 1, 2026 · 220 m away
  • Zoning review

    Closed

    219 DUFFERIN ST · Sep 18, 2026 · 161 m away

Neighbourhood: South Parkdale

About the area around the lot, not the lot itself.

Nearest station
Exhibition GO Station8 min walk
Nearest TTC stop
Dufferin St at Liberty St3 min walk
Nearest cycling route
Dufferin StSharrows, 6 min walk
Nearest traffic count
4,195 vehicles in 8 hFraser Ave / Liberty St, 60 m away, Dec 6, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Lamport Stadium Park1 min walk
Dufferin - King Park4 min walk
Rita Cox Park5 min walk

Schools within 1 km

  • HOLY FAMILY CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • DR RITA COX - KINA MINAGOK PUBLIC SCHOOL English Public 15 min walk
  • PARKDALE COLLEGIATE INSTITUTE English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth ParkdaleMedian neighbourhood
Median household income (2020)$57,200$84,500
Households that own their home15%54%
Population (2021)20,49516,813
Homes built in 1960 or before37%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth ParkdaleCity median
Assault1140.3636.3
Robbery68.669.5
Homicide3.85.3
Shootings7.610.5
Auto theft72.5192.6
Theft over $5,00045.846.1
Break and enter240.3172.8
Theft from vehicles205.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.