Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2016
Needs a closer lookStill open in the City's records: 16 222052 (To install 1 Backflow Prevention Devices (Water only), 2016, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 25 108662 STE 10 OZ (Combined Official Plan & Rezoning for a 55-storey mixed-use building that will incorpor..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know1 approved. A0784/18TEY (Proposal for multiple projects to an existing 2 storey office building. Scope of work i..., 2018); A0014/15TEY (To convert a 43.66 square metre portion of an office building into a take out restaurant, 2015).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
16 records on file: more than at 100% of Toronto houses (median 0).
- Development application25 108662 STE 10 OZOMB Appeal
Combined Official Plan & Rezoning for a 55-storey mixed-use building that will incorporate the existing building facade. The proposal consists of a total of 732 residential dwelling units and approximately 44,379 square metres of total GFA, including approximately 1,140 square metres of office space with a resulting density of 16.6 FSI.
Jan 24, 2025 · 54 FRASER AVE · City file - Zoning review21 210786 ZZUClosedSep 10, 2021 · 54 FRASER AVE
- Building permit18 220755Closed
Proposal for interior alterations units 58, 58B, 60A for office use.
Dec 27, 2018 · 54 FRASER AVE - Minor varianceA0784/18TEYWithdrawn
Proposal for multiple projects to an existing 2 storey office building. Scope of work includes alterations to existing building and new 3rd to 8th floor additions including mechanical penthouse.Address includes 54-60 Fraser Ave.
Aug 10, 2018 · 54 FRASER AVE - Zoning review18 184136 ZPRClosedJun 25, 2018 · 54 FRASER AVE
- Building permit16 222052Inspection
To install 1 Backflow Prevention Devices (Water only).
Sep 15, 2016 · 54 FRASER AVE - Zoning review16 143818 LTOClosedApr 21, 2016 · 54 FRASER AVE
- Zoning review15 256059 LPRClosedNov 24, 2015 · 54 FRASER AVE
Show 8 older records
- Minor varianceA0014/15TEYApproved
To convert a 43.66 square metre portion of an office building into a take out restaurant.
Feb 25, 2015 · 54 FRASER AVE - Zoning review14 230114 LPRClosedSep 30, 2014 · 54 FRASER AVE
- Zoning review14 210477 LTOClosedAug 22, 2014 · 54 FRASER AVE
- Building permit13 101246Closed
Proposal to demolish exisitng shed on the south-west wall of existing building
May 6, 2013 · 54 FRASER AVE - Building permit13 144636Cancelled
Proposal for interior alterations to existing industrial building to create office spaces (scope of work includes the creation of new common entrance, new stairs to the second floor suite and demolition of partitions.)
Apr 4, 2013 · 54 FRASER AVE - Building permit05 208891Closed
Temporary scenic wall on boulevard on outside for film set building address is 58A fraser ave.
Dec 9, 2005 · 54-58 FRASER AVE - Building permit83 015151Closed - DormantMay 10, 1983 · 54-58 FRASER AVE
- Building permit82 025573Closed - DormantFeb 4, 1983 · 54-58 FRASER AVE
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,601 m²
- Frontage
- 44.1 m
- Depth
- 38.3 m
- Street
- Fraser Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 688 m²roof up to 23.6 m
- Back yard
- 0 mhouse to rear lot line
- Side yards
- 0 m and 9.7 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: pine, austrian (42 cm), maple, manitoba (30 cm), elm (18 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%8 of 9 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 8
- Development applications
- 11
Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).
47 FRASER AVE · Mar 5, 2025 · 45 m away - Minor varianceApproved
To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).
41 FRASER AVE · Mar 5, 2025 · 54 m away - Minor varianceApproved
To alter the existing four-storey, non-residential building (including office/workshop and studio/retail and service shop/commercial school uses) by increasing the permitted floor space index and reducing the number of parking spaces to zero.
135 LIBERTY ST · Sep 25, 2024 · 96 m away - Minor varianceApproved
To convert the existing Suite (Unit 303), within the three-storey commercial building, from an office space use to a showroom use.
109 ATLANTIC AVE · Sep 13, 2023 · 433 m away - Minor varianceApproved
To convert the existing 5-storey building from 56 units to 60 units by converting a portion of the underground garage into residential suites and amenity space.
47 SPENCER AVE · Feb 15, 2023 · 434 m away
Latest activity nearby
- Zoning review
Application Acceptable
41 FRASER AVE · Nov 26, 2026 · 54 m away - Building permit
Revision to the following areas - P3 shaft wall added to drawing A010 attached..P2 wall on the north side of the Mechanical Room has been replaced with P3 shaft wall, see drawing A201, attached Details added for the rating of the existing steel beams above the Mechanical room with cementitious fire spray, refer to drawing A602, attached.Addition of entry vestibule. Refer to schedule drawing A011-2, vestibule drawings A012-2, and plans on A201Proposed interior alteration of an existing space into a reception area.
15 FRASER AVE · Nov 24, 2026 · 185 m away - Zoning review
Not Started
42 FRASER AVE · Nov 10, 2026 · 44 m away - Building permit
Proposal to construct temporary air supported structure at Lamport Stadium. Erected October 27, 2026 to April 30, 2027
1155 KING ST W · Nov 10, 2026 · 264 m away - Building permit
Proposal for loading dock replacement
41 FRASER AVE · Nov 9, 2026 · 54 m away - Building permit
REV 01: Fire protection planProposal for interior alterations
2-20 FRASER AVE · Nov 5, 2026 · 210 m away - Zoning review
Cancelled
109 JEFFERSON AVE · Oct 28, 2026 · 300 m away - Building permit
Interior cosmetic upgrades including in-suite laundry addition for Unit 309.No changes to existing HVAC - no HVA permit required.
99 TYNDALL AVE · Oct 9, 2026 · 277 m away - Building permit
Proposal for interior alterations to existing Group D occupancy for Zoomermedia
70 JEFFERSON AVE · Oct 1, 2026 · 220 m away - Zoning review
Closed
219 DUFFERIN ST · Sep 18, 2026 · 161 m away
Neighbourhood: South Parkdale
About the area around the lot, not the lot itself.
- Nearest station
- Exhibition GO Station8 min walk
- Nearest TTC stop
- Dufferin St at Liberty St3 min walk
- Nearest cycling route
- Dufferin StSharrows, 6 min walk
- Nearest traffic count
- 4,195 vehicles in 8 hFraser Ave / Liberty St, 60 m away, Dec 6, 2022
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Lamport Stadium Park1 min walk
- Dufferin - King Park4 min walk
- Rita Cox Park5 min walk
Schools within 1 km
- HOLY FAMILY CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
- DR RITA COX - KINA MINAGOK PUBLIC SCHOOL English Public 15 min walk
- PARKDALE COLLEGIATE INSTITUTE English Public 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Parkdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $57,200 | $84,500 |
| Households that own their home | 15% | 54% |
| Population (2021) | 20,495 | 16,813 |
| Homes built in 1960 or before | 37% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Parkdale | City median |
|---|---|---|
| Assault | 1140.3 | 636.3 |
| Robbery | 68.6 | 69.5 |
| Homicide | 3.8 | 5.3 |
| Shootings | 7.6 | 10.5 |
| Auto theft | 72.5 | 192.6 |
| Theft over $5,000 | 45.8 | 46.1 |
| Break and enter | 240.3 | 172.8 |
| Theft from vehicles | 205.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.