HousePrecheckCheck an address

5350 Yonge StToronto · zoning, lot size and permit records

36.1 × 67.5 m2,271 m²on Churchill Avecorner, also on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 9 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
36.1 m frontage67.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B0071/07NY (This is an application under Section 50, 53 and 54 of the Planning Act for the consent..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Development application20 217077 NNY 18 CDClosed

    Draft Plan of Condominium Application

    Nov 10, 2020 · 5350 YONGE ST · City file
  • Development application14 230270 NNY 23 OZClosed

    To permit 30-storey (92 metres) residential condominium consisting of 385 units, having a gross floor area of 24,248 square metres and FSI of 4.99. The proposed development will also provide 390 motor vehicle parking spaces on site within a 6-storey underground parking garage.

    Sep 30, 2014 · 5350 YONGE ST
  • Building permit09 161080Closednew building

    Revise original building permit to include accesory use of Daycare St. George Anglican's Church PHASE I ONLY - Place of Worship Demolition and Construction of New Place of Worship. LJ NOTE: PHASE 2 is a Residential Tower and will require a Record of Site Condition (RSC) lj

    Mar 13, 2012 · 5350 YONGE ST
  • Building permit11 232280Closed

    To erect and display one illuminated ground sign, with two sign faces, each face containing static copy and readograph copy (displayed electronically) 1.7 square metres in area and at a height of 3.0 metres, at the easterly frontage of the premises, perpendicular to Yonge Street, in conjunction with a new place of worship located on the premises. **St. George's Anglican Church**

    Jul 25, 2011 · 5350 YONGE ST
  • Zoning review11 157524 ZSVClosed
    Mar 30, 2011 · 5350 YONGE ST
  • Zoning review11 132707 ZPUClosed
    Feb 24, 2011 · 5350 YONGE ST
  • Building permit10 118643Closeddemolition

    Proposed demo of a portion of an existing place of worship

    Feb 23, 2010 · 5350 YONGE ST
  • Building permit09 161094Closeddemolition

    Proposed demo of a portion of an existing place of worship 408 sq.m where the entire building is greater than 600 sq.m.

    Jan 29, 2010 · 5350 YONGE ST
Show 5 older records
  • Consent (lot split)B0071/07NYApproved

    This is an application under Section 50, 53 and 54 of the Planning Act for the consent of the Committee of Adjustment for the division of a parcel of residential lands into two (2) individual parcels. Also proposed is an access easement and a road widening dedication.

    Nov 21, 2007 · 5350 YONGE ST
  • Zoning review05 205027 PLOClosed
    Nov 23, 2005 · 5350 YONGE ST
  • Building permit04 130434Closed

    Change of use from school to day nursery

    Jun 3, 2004 · 5350 YONGE ST
  • Building permit03 200073Closed

    INTERIOR ALTERATIONS TO BASEMENT OF CHURCH FOR MONTESSORI SCHOOL

    Jan 30, 2004 · 5350 YONGE ST
  • Zoning review03 160935 ZPUClosed
    Jul 28, 2003 · 5350 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,271 m²
Frontage
36.1 m
Depth
67.5 m
Street
Churchill Ave
Corner lot
Yes, also on Yonge St67.5 m along it
Public lane
None
House footprint
923 m²roof up to 21.1 m
Back yard
6 mhouse to rear lot line
Side yards
1.4 m and 2.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    93%13 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    20

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a four-storey apartment building with 14 residential units. This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

      72 CHURCH AVE · Oct 23, 2025 · 350 m away
    • Minor varianceApproved

      To alter the development standards (as approved by Site-Specific Zoning By-law Nos. 1118-2022(OLT) and 131-2025) for the proposed 40-storey mixed use building, to permit a nursing home, increase the podium height, reduce the overall tower height, increase the total gross floor area, reduce the non-residential gross floor area, and reduce the residential parking rate.

      5306 YONGE ST · Aug 14, 2025 · 145 m away
    • Minor varianceApproved

      To alter the previously approved 26-storey residential building under site-specific By-law 409-2024 related to balcony projections, the location of accessible parking spaces, the minimum percentage of three-bedroom units and setbacks from the One Family Detached Dwelling Zone. This application was previously deferred at the Committee of Adjustment hearing on March 20, 2025.

      26 HOUNSLOW AVE · May 1, 2025 · 194 m away
    • Minor varianceApproved

      To increase the total gross floor area, permitted building height and number of storeys and reduce residential parking space rate. Related By-law No.1118-2022(OLT) and By-law No. 131-2024.

      5306 YONGE ST · Mar 6, 2025 · 145 m away
    • Minor varianceApproved

      To construct a new two-storey detached dwelling with an integral garage.

      61 NORTON AVE · Nov 23, 2023 · 401 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards, as approved under Site Specific By-laws 409-2024 and 1308-2025, for the proposed 21-storey residential building, including modifying the building heights and storeys, setbacks, balcony projections, amenity space and parking requirements.

      28 HOUNSLOW AVE · Nov 26, 2026 · 197 m away
    • Building permit

      Proposal for commercial plumbing systems.

      5372-5374 YONGE ST · Nov 5, 2026 · 41 m away
    • Zoning review

      Closed

      5 NORTHTOWN WAY · Nov 4, 2026 · 130 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including construction of non-load-bearing partitions and minor redistribution of electrical, mechanical, and life safety systems.

      5255 YONGE ST · Nov 4, 2026 · 254 m away
    • Building permit

      Proposed interior alterations including relocating washroom and adding a staff room. No change in structure, fire alarm or sprinkler system.

      5429 YONGE ST · Oct 16, 2026 · 250 m away
    • Zoning review

      Closed

      5293 YONGE ST · Oct 7, 2026 · 163 m away
    • Building permit

      Proposal for commercial kitchen ventilation.

      5372-5374 YONGE ST · Oct 6, 2026 · 41 m away
    • Building permit

      2 WALL SIGNS**FOOD BASICS**

      20 CHURCH AVE · Oct 5, 2026 · 115 m away
    • Building permit

      INTERIOR ALTERATION OF EXISTNG OFFICE SPACE.

      5255 YONGE ST · Oct 5, 2026 · 254 m away
    • Building permit

      Replacement of existing fire alarm panels and the addition of a new panel for block 900

      100 GRANDVIEW WAY · Sep 25, 2026 · 262 m away

    Neighbourhood: Willowdale West

    About the area around the lot, not the lot itself.

    Nearest station
    Finch Station11 min walk
    Nearest TTC stop
    Yonge St at Churchill Ave1 min walk
    Nearest cycling route
    Willowdale AveCycle Track, 13 min walk
    Nearest traffic count
    28,668 vehicles in 14 hYonge St / Church Ave / Churchill Ave, 50 m away, May 26, 2026
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    McKee Parkette2 min walk
    Kempford Parkette3 min walk
    Beecroft Linear Park3 min walk

    Schools within 1 km

    • MCKEE PUBLIC SCHOOL English Public 5 min walk
    • TORONTO FRENCH MONTESSORI Private 5 min walk
    • ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • CROWN ACADEMY Private 6 min walk
    • DARYK HIGH Private 7 min walk
    • TFS Private 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWillowdale WestMedian neighbourhood
    Median household income (2020)$76,500$84,500
    Households that own their home60%54%
    Population (2021)17,16016,813
    Homes built in 1960 or before19%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWillowdale WestCity median
    Assault561.2636.3
    Robbery51.969.5
    Auto theft89.6192.6
    Theft over $5,00037.746.1
    Break and enter103.7172.8
    Theft from vehicles141.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.