HousePrecheckCheck an address

535 Queen St EToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c1.0; r2.5) SS2 (x337)≈ 31.3 × 59.4 m1,483 m²on Queen St E

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 00 346192 (install fixtures unit #8 1- 2compt k.s. 1 d.w. 1 shower, 1 wc., 1 urinal , 1 washing ma..., 2000, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 31.3 m frontage≈ 59.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2000

    Needs a closer look

    Still open in the City's records: 00 346192 (install fixtures unit #8 1- 2compt k.s. 1 d.w. 1 shower, 1 wc., 1 urinal , 1 washing ma..., 2000, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Zoning review25 145302 LTOClosed
    Apr 16, 2025 · 535 QUEEN ST E
  • Building permit14 229812Closed

    To repair to front entry staircase on the existing multi-use residential building.

    Oct 2, 2014 · 535 QUEEN ST E
  • Zoning review12 136004 ZSVClosed
    Mar 13, 2012 · 535 QUEEN ST E
  • Building permit09 173823Closed

    Proposal to install one backflow prevention device

    Oct 14, 2009 · 535 QUEEN ST E
  • Zoning review09 118913 ZSVCancelled
    Mar 23, 2009 · 535 QUEEN ST E
  • Zoning review07 253124 ZPRClosed
    Aug 15, 2007 · 535 QUEEN ST E
  • Building permit00 346191Closed

    ALTER HVAC COST INCLUDED IN BP 00 346190

    Nov 3, 2000 · 535 QUEEN ST E
  • Building permit00 346190Closed

    build roof access structure and exterior roof deck unit 8 applicant to provide letter to zoning examiner confirming unit #

    Nov 3, 2000 · 535 QUEEN ST E
Show 1 older records
  • Building permit00 346192Inspection

    install fixtures unit #8 1- 2compt k.s. 1 d.w. 1 shower, 1 wc., 1 urinal , 1 washing machine

    Oct 30, 2000 · 535 QUEEN ST E

Check before you build

  • Site-specific exception 900.11.10(337)

    Needs a closer look

    7 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(337)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In the CR zone, a drive-through facility is not permitted

  2. Rule B

    Despite regulation 40.10.20.40 (1), dwelling units are permitted in building types with less than 5 dwelling units

  3. Rule C

    These premises must comply with Exception 900.11.10(2)

  4. Rule D

    Despite regulation 40.5.40.10 (4), equipment and structures on the roof of a building may not exceed the permitted maximum height

  5. Rule E

    If a lot with a building is identified as a heritage site , any portion of a building that exceeds the height of the conserved heritage building , whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres

  6. Rule F

    Despite regulation 40.10.40.10 (5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less 3.7 metres

  7. Rule G

    Despite regulation 40.10.40.70 (2) (E) and (F), (i) if a lot abuts a lot in the O, ON or OR zone or the Residential Zone category or Residential Apartment zone, no building or structure may penetrate a 45 degrees angular plane projected over the lot along the entire required rear yard setback , starting at a height of 10.5 metres above the average elevation of the ground along the rear lot line ; or (ii) if a lot is separated from a lot in the O, ON or OR zone or the Residential Zone catory by a lane , no building or structure may penetrate a 45 degrees angular plane projected over the lot , starting at a height of 10.5 metres above the average elevation of the ground along the entire rear lot line of the lot abutting the lane on the opposite side of the lane .

By-law 569-2013, Chapter 900

Lot facts

Area
1,483 m²
Frontage
31.3 mestimated, irregular lot
Depth
59.4 mestimated, irregular lot
Street
Queen St E
Corner lot
No
Public lane
None
Max height
25 m
Max lot coverage
—
  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: King Street East, Queen Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c1.0; r2.5) SS2 (x337) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
82%18 of 22 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
14

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 154 m away
  • Minor varianceRefused

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    45 BASEBALL PL · May 13, 2026 · 463 m away
  • Minor varianceApproved

    To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

    111 RIVER ST · Jan 28, 2026 · 421 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 122-2023 (OLT), by increasing the building height (from a 34-storey residential building to a 37-storey residential building, inclusive of seven rental replacement units), and constructing a four-and-one-half levels of an underground parking garage.

    83 RIVER ST · Aug 14, 2024 · 334 m away
  • Minor varianceApproved

    To alter the existing five-storey mixed-use building containing 26 residential dwelling units and 3 artist studios (on the ground level), by constructing an additional residential dwelling unit within the mechanical penthouse, for a total of 27 residential dwelling units.

    41 RIVER ST · May 15, 2024 · 194 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 249 m away
  • Building permit

    PROPOSED NEW DETACHED GARAGE

    60 WASCANA AVE · Nov 23, 2026 · 154 m away
  • Zoning review

    Not Started

    480 SHUTER ST · Nov 19, 2026 · 288 m away
  • Building permit

    PROPOSED ALTERATIONS TO SECOND FLOOR

    491 QUEEN ST E · Nov 17, 2026 · 127 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 276 m away
  • Zoning review

    Not Started

    7 LABATT AVE · Oct 21, 2026 · 293 m away
  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 154 m away
  • Zoning review

    Notice Sent

    534 QUEEN ST E · Oct 13, 2026 · 104 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 276 m away
  • Development application

    Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

    7 LABATT AVE · Sep 30, 2026 · 287 m away · City file

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station30 min walk
Nearest TTC stop
River St at King St East1 min walk
Nearest cycling route
River StCycle Track, 1 min walk
Nearest traffic count
3,066 vehicles in 8 hRiver St: King St E - Queen St E, 30 m away, Apr 26, 2004
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 2 with cyclists
Parks
King/Queen Triangle1 min walk
Corktown Common2 min walk
Underpass Park3 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 6 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 11 min walk
  • LIBERTY PREP SCHOOL Private 11 min walk
  • QUEEN ALEXANDRA MDL SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.