Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 53 Joanith Dr
53 Joanith Dr is on a 10.7 m by 32 m lot on Joanith Dr in O'Connor-Parkview. The zoning is RD.
The City has 5 records on this lot since 2015. That is more than at 93% of Toronto houses. In 2017, a building permit was filed: "Proposal to maintain foundation and construct a 2 storey sfd with finished basement and detached garage. see 2nd coa application". Status: closed. In 2017, a Committee of Adjustment application was filed: "To legalize and to maintain the new two-storey detached dwelling with a rear ground floor deck. a previous committee of adjustment decision (a0006/16tey)…". Status: closed. In 2016, a Committee of Adjustment application was filed: "To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a front two-storey addition…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 25 minor variance applications in the last 10 years and approved 96%. The nearest TTC stop is St Clair Ave East at Rexleigh Dr, a 1-minute walk.
Summary
What the City's records show on this house
- No permit for a second unit on fileLowFree check
- Minimum frontage 12 mLow
- Minimum lot area 370 m²Low
- 2 Committee of Adjustment files on this lotLowFree check
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2017-09-14 | Building permit17 219956 | Proposal to maintain foundation and construct a 2 storey SFD with finished basement and detached garage. See 2nd COA application. | Closed | |
| 2017-07-26 | Minor varianceA0348/17TEY | To legalize and to maintain the new two-storey detached dwelling with a rear ground floor deck. A previous Committee of Adjustment decision (A0006/16TEY) permitted alterations to the former one-storey detached dwelling including a complete second storey addition, a rear two-storey addition, a front two-storey addition with a front bay window, a front porch, a rear deck, and the construction of a rear detached garage. A minimum of fifty percent of the existing walls were to be maintained during construction. Less than fifty percent of the existing walls were maintained, classifying the house under construction as a new dwelling. | Approved | |
| 2016-09-02 | Building permit16 147013 | Revision to remove porion of existing wall originally proposed to remain. More than 50% of existing exterior walls above grade have been demolished, NEW HOUSETHIS FILE IS CANCELLED SEE BP 17 219956 THAT REPLACES THIS FILE | Cancelled | |
| 2016-04-06 | Minor varianceA0006/16TEY | To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a front two-storey addition with a front bay window, a front porch, rear deck, and a rear detached garage. | Approved | |
| 2015-12-10 | Zoning review15 263125 ZZC | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Minimum frontage 12 m
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Minimum lot area 370 m²
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f12.0; a370; d0.6)
- Height limit
- 8.5 m
- Lot coverage limit
- 35%
- Corner lot
- No
- Public lane
- None
- New house permit
- 2017
- House footprint
- 80 m²
- Back yard
- 15.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 5 suite and multiplex permits within 300 m in 10 years
- 25 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
O'Connor-Parkview neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- O'Connor StationNearest station32 min walk
- St Clair Ave East at Rexleigh DrNearest TTC stop1 min walk
- Taylor Creek TrlNearest cycling route12 min walk
- Gordon A Brown Mdl SchoolSchool2 min walk
- Selwyn Elementary SchoolSchool2 min walk
- Abacus MontessoriSchool5 min walk
- Presteign Heights Elementary SchoolSchool14 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3755.6
- Robberycity median 69.543.6
- Shootingscity median 10.54.8
- Auto theftcity median 192.6179.2
- Theft over $5,000city median 46.138.7
- Break and entercity median 172.877.5
- Theft from vehiclescity median 188.1193.7
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist