HousePrecheckCheck an address

53 Cummer AveToronto · zoning, lot size and permit records

Also 45 Cummer Ave

75.5 × 93.0 m6,504 m²on Olympic Garden Drcorner, also on Cummer Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 53 rental units, built 1996More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 11 287471 NNY 24 OZ (Proposed redevelopment of the 'Newtonbrook Plaza' and adjacent lands for a mixed-use pr..., 2011). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
75.5 m frontage93.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2006

    Needs a closer look

    Still open in the City's records: 04 154166 (New 4 storey 53 unit residential building, 2006, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 25 189564 PRS 00 IR (Property Standards, 2025); 25 181385 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 11 287471 NNY 24 OZ (Proposed redevelopment of the 'Newtonbrook Plaza' and adjacent lands for a mixed-use pr..., 2011).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 Committee of Adjustment files on this lot

    Good to know

    4 approved. A0694/18NY (To construct a new entrance to the existing building, 2018); B0003/18NY (To obtain consent to sever a portion of the land for the purpose of a lot addition, 2018); A0008/05NY (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2005); and 1 more.

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 53 units, built 1996).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation25 189564 PRS 00 IRClosed

    Property Standards

    Jul 7, 2025 · 53 CUMMER AVE
  • By-law investigation25 181385 PRS 00 IRClosed

    Property Standards

    Jun 22, 2025 · 53 CUMMER AVE
  • Building permit21 170092Closed

    To erect and display one double sided illuminated ground sign***CUMMER AVENUE UNITED CHURCH***

    Jan 19, 2022 · 53 CUMMER AVE
  • Zoning review21 230872 ZSVClosed
    Oct 26, 2021 · 53 CUMMER AVE
  • Zoning review21 196670 ZPRClosed
    Aug 11, 2021 · 53 CUMMER AVE
  • Building permit19 125004Closed

    Renovation scope of work to improve the existing building's accessibility, energy efficiency and the clarity of entry. Minor addition of new entrance vestibule on western sideyard replaces and clarifies existing multiple entry points to the building. Interior functions reorganized while existing uses maintained. Existing bell tower to be demolished as part of comprehensive landscape improvements.

    May 28, 2019 · 53 CUMMER AVE
  • Minor varianceA0694/18NYApproved

    To construct a new entrance to the existing building.

    Nov 8, 2018 · 53 CUMMER AVE
  • Consent (lot split)B0003/18NYApproved

    To obtain consent to sever a portion of the land for the purpose of a lot addition.

    May 3, 2018 · 53 CUMMER AVE
Show 8 older records
  • Development application18 125604 NNY 24 SAFinal Approval Completed

    Site plan approval application for the first phase (Block 1) of the Newtonbrook Plaza re-development. Phase 1 includes two mixed-use towers of 34 and 32 storeys with a total of 810 residential units. A total gross floor area of 73,345.6 square metres is proposed, of which 65,100 square metres will be for residential uses, 3,713.7 square metres for retail uses, and 3,914.9 square metres will be for commercial (office uses).

    Mar 6, 2018 · 53 CUMMER AVE · City file
  • Zoning review18 121626 ZZCClosed
    Feb 26, 2018 · 53 CUMMER AVE
  • Development application11 287471 NNY 24 OZOMB Approved

    Proposed redevelopment of the 'Newtonbrook Plaza' and adjacent lands for a mixed-use project with 1,674 residential units in 3 blocks with 4 buildings of 28, 36, 36 and 44 storeys, at-grade retail uses, office uses, townhouses and a new public park and street.

    Oct 5, 2011 · 45 CUMMER AVE · City file
  • Building permit04 154166Revision Issuednew building

    New 4 storey 53 unit residential building

    Feb 15, 2006 · 53 CUMMER AVE
  • Minor varianceA0008/05NYApproved

    This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a new 4 storey, 53 unit non-profit apartment house.

    Feb 3, 2005 · 53 CUMMER AVE
  • Consent (lot split)B034/03NYApproved

    This is an application under Sections 50, 53 and 54 of the Planning Act for the consent of the Secretary Treasurer to the granting of a lease over the weserly portion of the above lands for a period in excess of 21 years.

    Dec 5, 2003 · 53 CUMMER AVE
  • Zoning review01 191032 PRZClosed
    Nov 1, 2001 · 53 CUMMER AVE
  • Building permit01 164609Closed

    BUILT IN SHOWER AND DRAIN AND VENT

    Aug 1, 2001 · 53 CUMMER AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
6,504 m²
Frontage
75.5 m
Depth
93 m
Street
Olympic Garden Dr
Corner lot
Yes, also on Cummer Ave93 m along it
Public lane
None
House footprint
2,379 m²
Back yard
41.3 mhouse to rear lot line
Side yards
5.9 m and 12.5 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, amur (8 cm), maple, amur (8 cm), maple, amur (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
15

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing ancillary building (3-car detached garage) at the rear of the property into a take-out pizza restaurant.

    6020-6022 YONGE ST · Oct 15, 2026 · 324 m away
  • Minor varianceApproved

    To authorize interim occupancy of the existing sales centre for a broader range of non-residential uses, all of which are established as permitted uses under the site-specific Zoning By-laws.

    5799-5915 YONGE ST · Jun 4, 2026 · 213 m away
  • Minor varianceApproved

    To construct a new two-storey detached dwelling with an integral garage and front porch.

    14 EVERINGHAM CRT · Dec 4, 2025 · 433 m away
  • Minor varianceRefused

    To construct a new dwelling with a front porch. File numbers B0031/24NY, A0377/24NY, A0378/24NY will be jointly considered. Please note, the file was deferred on June 12, 2025 to address Community Planning concerns.

    140 CUMMER AVE · Nov 6, 2025 · 343 m away
  • Minor varianceRefused

    To construct a new dwelling with a front porch.. File numbers B0031/24NY, A0377/24NY, A0378/24NY will be jointly considered. Please note, the file was deferred on June 12, 2025 to address Community Planning concerns.

    140 CUMMER AVE · Nov 6, 2025 · 343 m away

Latest activity nearby

  • Building permit

    Interior alterations to 6005 Yonge Street, Unit A

    5999-6023 YONGE ST · Nov 12, 2026 · 293 m away
  • Building permit

    Proposal for interior alterations to a new restaurant and patron area, less than 30 seats for new tenant.Convenience address is 6017 Yonge St.

    5999-6023 YONGE ST · Oct 23, 2026 · 293 m away
  • Building permit

    Proposed Office Unit Dividing and renovation to Create Unit 511 at legal Level 4

    5801 YONGE ST · Sep 11, 2026 · 261 m away
  • Building permit

    Drain mainline back WATER VALVE installation

    8 DEERING CRES · Sep 9, 2026 · 229 m away
  • Building permit

    Revision No.1: Due to new office layoutProposal for interior alterations in Unit 701.

    5801 YONGE ST · Aug 20, 2026 · 261 m away
  • Building permit

    Proposal to divide office unit on level 4

    5799-5915 YONGE ST · Jul 29, 2026 · 213 m away
  • Building permit

    1 ground sign with LED sign and 4 static sign panels.

    5959 YONGE ST · Jul 16, 2026 · 186 m away
  • Building permit

    Supply and install (3) like for like HVAC roof top units

    5928 YONGE ST · Jun 5, 2026 · 203 m away
  • Minor varianceApproved

    To authorize interim occupancy of the existing sales centre for a broader range of non-residential uses, all of which are established as permitted uses under the site-specific Zoning By-laws.

    5799-5915 YONGE ST · Jun 4, 2026 · 213 m away
  • Zoning review

    Closed

    5949 YONGE ST · Jun 3, 2026 · 156 m away

Neighbourhood: Newtonbrook East

About the area around the lot, not the lot itself.

Nearest station
Finch Station12 min walk
Nearest TTC stop
Cummer Ave at Yonge St1 min walk
Nearest cycling route
Newtonbrook Park TrlMulti-Use Trail - Connector, 3 min walk
Nearest traffic count
3,728 vehicles in 8 hCummer Ave / Silverview Dr, 160 m away, Dec 14, 2021
Serious collisions within 500 m
72021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Newtonbrook Park3 min walk
Silverview Park5 min walk
Centre Park7 min walk

Schools within 1 km

  • AVONDALE SECONDARY ALTERNATIVE SCHOOL English Public 5 min walk
  • DREWRY ACADEMY Private 5 min walk
  • DREWRY SECONDARY SCHOOL English Public 8 min walk
  • ALPHA QUALITY EDUCATION SCHOOL Private 10 min walk
  • MONSEIGNEUR DE CHARBONNEL CATHOLIC SECONDARY SCHOOL French Separate 11 min walk
  • TFS Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNewtonbrook EastMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home62%54%
Population (2021)15,34516,813
Homes built in 1960 or before17%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNewtonbrook EastCity median
Assault554636.3
Robbery60.369.5
Auto theft252.3192.6
Theft over $5,00049.446.1
Break and enter170172.8
Theft from vehicles170188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.