HousePrecheckCheck an address

5285 Yonge StToronto · zoning, lot size and permit records

Also 5279 Yonge St, 5281 Yonge St, 5283 Yonge St

23.6 × 33.4 m722 m²on Norton Avecorner, also on Yonge Stbacks onto Ln E Yonge N Norton

Not a single house

Several homes on one parcel

4 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 4 homes on one parcel of 0.1 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • 11 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N20 m
23.6 m frontage33.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0840/17NY (Proposal to convert portion of building to restaurant, 2017).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 11 development applications open within 300 m

    Good to know

    11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 115299Closed

    Install 2 New Wall Signs

    Feb 21, 2024 · 5285 YONGE ST
  • Zoning review24 108164 LPRClosed
    Jan 25, 2024 · 5285 YONGE ST
  • Building permit22 240374Closed

    Proposal to construct interior alterations to convert an existing computer bar into a restaurant with 30 seats or more. A charcoal BBQ is proposed in the dining area.

    Jan 16, 2023 · 5285 YONGE ST
  • Building permit22 216948Closed

    To erect and display one illuminated wall sign, displaying static copy, with a face measuring 0.88m vertically by 3.27m horizontally, at the height of 4.32m, at the first storey on the west elevation.*****HERO TEA*****

    Nov 4, 2022 · 5285 YONGE ST
  • Building permit16 240750Closed

    Revision 2. changes to the lobby heating

    Apr 15, 2019 · 5285 YONGE ST
  • Building permit19 104868Closed

    To erect and display two illuminated wall signs, displaying static copy. Erecting on the second storey of the west and south elevation of the building. Both measuring 0.79m by 6.52m at a height of 8.07m.****YG CYBER CAFE****

    Jan 30, 2019 · 5285 YONGE ST
  • Building permit18 259727Closed

    To erect and display two static illuminated wall signs.**YANG'S BRAISED CHICKEN RICE PRESOTEA YUNSHANG RICE NOODLE**

    Jan 14, 2019 · 5285 YONGE ST
  • Building permit18 164738Closed

    Interior alterations to second floor (241.25 m2) to Internet cafe (restaurant)

    Oct 16, 2018 · 5285 YONGE ST
Show 7 older records
  • Building permit18 117095Closed

    Proposed interior alteration to convert an existing office into a new restaurant, 60 seats, installation of two HVAC kitchen exhaust fans and adding new plumbing fixtures.

    Aug 17, 2018 · 5285 YONGE ST
  • Zoning review18 207521 LPRClosed
    Aug 10, 2018 · 5285 YONGE ST
  • Minor varianceA0840/17NYApproved

    Proposal to convert portion of building to restaurant

    Dec 7, 2017 · 5285 YONGE ST
  • Zoning review17 222508 ZZCClosed
    Aug 24, 2017 · 5285 YONGE ST
  • Zoning review17 211936 ZZCCancelled
    Aug 5, 2017 · 5285 YONGE ST
  • Zoning review17 201365 ZZCCancelled
    Jul 19, 2017 · 5285 YONGE ST
  • Zoning review12 169930 LPRClosed
    May 9, 2012 · 5285 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
722 m²
Frontage
23.6 m
Depth
33.4 m
Street
Norton Ave
Corner lot
Yes, also on Yonge St33.4 m along it
Public lane
Ln E Yonge N Norton, 37.7 m along it
House footprint
215 m²roof up to 9.4 m
Back yard
3.1 mhouse to rear lot line
Side yards
0.2 m and 8.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    75%21 of 28 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    18

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached 2 storey dwelling.

      79 EMPRESS AVE · Feb 19, 2026 · 459 m away
    • Minor varianceApproved

      To construct a new dwelling.

      115 MCKEE AVE · Jan 8, 2026 · 499 m away
    • Minor varianceApproved

      To construct a new detached dwelling with an integral garage, front porch, and rear deck.

      101 PARKVIEW AVE · Dec 4, 2025 · 453 m away
    • Minor varianceApproved

      To construct a four-storey apartment building with 14 residential units. This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

      72 CHURCH AVE · Oct 23, 2025 · 350 m away
    • Minor varianceApproved

      To alter the development standards (as approved by Site-Specific Zoning By-law Nos. 1118-2022(OLT) and 131-2025) for the proposed 40-storey mixed use building, to permit a nursing home, increase the podium height, reduce the overall tower height, increase the total gross floor area, reduce the non-residential gross floor area, and reduce the residential parking rate.

      5306 YONGE ST · Aug 14, 2025 · 66 m away

    Latest activity nearby

    • Building permit

      This is a structural garage restoration involving demolition, brick masonry reconstruction, roof framing replacement, roofing repairs, and reinstatement of affected finishes¿not a complete garage rebuild.

      50 PARKVIEW AVE · Nov 23, 2026 · 229 m away
    • Building permit

      Proposal for new sprinkler pipe installation. 1.1 Identify drywall ceiling to be removed (by others) for sprinkler pipe installation.1.2 Connect new sprinkler piping to existing 2½" sprinkler main feeding ground level sprinklers located Electrical room.1.3 Supply and install up to eight (8) new concealed pendent sprinkler heads c/w white cover plates and all associated feed piping from electrical room

      238 DORIS AVE · Nov 20, 2026 · 219 m away
    • Building permit

      Proposed localized concrete repairs at exterior walls and slab edges, and localized asphalt repairs at exterior vehicular loop.

      55 ELLERSLIE AVE · Nov 19, 2026 · 191 m away
    • Minor variancePending

      In Process

      8 KINGSDALE AVE · Nov 10, 2026 · 246 m away
    • Building permit

      Proposal for commercial plumbing systems.

      5372-5374 YONGE ST · Nov 5, 2026 · 227 m away
    • Zoning review

      Closed

      5 NORTHTOWN WAY · Nov 4, 2026 · 287 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including construction of non-load-bearing partitions and minor redistribution of electrical, mechanical, and life safety systems.

      5255 YONGE ST · Nov 4, 2026 · 60 m away
    • Zoning review

      Closed

      5293 YONGE ST · Oct 7, 2026 · 34 m away
    • Building permit

      Proposal for commercial kitchen ventilation.

      5372-5374 YONGE ST · Oct 6, 2026 · 227 m away
    • Building permit

      2 WALL SIGNS**FOOD BASICS**

      20 CHURCH AVE · Oct 5, 2026 · 186 m away

    Neighbourhood: Yonge-Doris

    About the area around the lot, not the lot itself.

    Nearest station
    North York Centre Station9 min walk
    Nearest TTC stop
    Yonge St at Ellerslie Ave1 min walk
    Nearest cycling route
    Willowdale AveCycle Track, 13 min walk
    Nearest traffic count
    14,856 vehicles in 8 hYonge St / Ellerslie Ave, 60 m away, Sep 28, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Doris - Norton Park1 min walk
    Ring Road Linear Park2 min walk
    McKenzie Parkette2 min walk

    Schools within 1 km

    • CROWN ACADEMY Private 3 min walk
    • TORONTO FRENCH MONTESSORI Private 4 min walk
    • MCKEE PUBLIC SCHOOL English Public 4 min walk
    • ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
    • DARYK HIGH Private 10 min walk
    • TORONTO DISTRICT SCHOOL BOARD - HEAD OFFICE English Public 10 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYonge-DorisMedian neighbourhood
    Median household income (2020)$73,000$84,500
    Households that own their home56%54%
    Population (2021)20,16016,813
    Homes built in 1960 or before1%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYonge-DorisCity median
    Assault510.7636.3
    Robbery70.669.5
    Auto theft99.6192.6
    Theft over $5,00058.146.1
    Break and enter58.1172.8
    Theft from vehicles224.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.