HousePrecheckCheck an address

525 Milner AveToronto · zoning, lot size and permit records

Employment · E 0.6≈ 73.6 × 102.9 m6,222 m²on Milner Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.6 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N50 m
≈ 73.6 m frontage≈ 102.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (33% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (22% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (29% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • Building permit15 254489Closed

    install backflow preventer

    Dec 14, 2015 · 525 MILNER AVE
  • Zoning review04 122226 LTOClosed
    Apr 2, 2004 · 525 MILNER AVE
  • Zoning review03 156421 LTOClosed
    Jul 15, 2003 · 525 MILNER AVE
  • Building permit01 189919Closednew building

    To install new spray booth

    Mar 20, 2002 · 525 MILNER AVE
  • Building permit01 129197Closed

    INTERIOR ALTERATIONS & PARTITIONS

    Apr 23, 2001 · 525 MILNER AVE
  • Building permit01 129194Closed

    INTERIOR ALTERATIONS & PARTITIONS

    Apr 23, 2001 · 525 MILNER AVE

Lot facts

Area
6,222 m²
Frontage
73.6 mestimated, irregular lot
Depth
102.9 mestimated, irregular lot
Street
Milner Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone E 0.6 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust shademaster (38 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Interior alterations to add a walkin cooler and freezer with hvac and plumbing to existing warehouse/office.

    445 MILNER AVE · Oct 26, 2026 · 284 m away
  • Zoning review

    Closed

    465 MILNER AVE · Sep 16, 2026 · 149 m away
  • Zoning review

    Closed

    445 MILNER AVE · Jul 31, 2026 · 284 m away
  • Building permit

    Proposal for interior alterations to existing warehouse to add a walk-in freezer, and roof top mechanical equipment w structural reinforcement

    465 MILNER AVE · Jun 24, 2026 · 149 m away
  • Building permit

    Proposal for interior alterations to exiting industrial unit

    445 MILNER AVE · Mar 5, 2026 · 284 m away
  • Development application

    Draft Plan of Condominium to convert 4 existing multiple unit employment buildings - currently rented to industrial/ commercial tenants - into condominium ownership. The exisiting development contains four (4), one (1) storey, multi-unit commercial/ industrial buildings constructed circa 1979. Each building will have 12 condominium units for a total of 48 units. The site contains surface parking with 326 spaces, including 10 accessible parking spaces.

    465 MILNER AVE · Sep 10, 2024 · 165 m away · City file
  • Building permit

    Interior alterations to unit 7 for existing office space, scope of work includes interior partitioning and relocation of the existing sprinklers and ductwork

    455 MILNER AVE · Nov 14, 2023 · 212 m away
  • Building permit

    Interior renovation of the existing office space, scope of work includes interiorpartitioning and relocation of the existing sprinklers and ductwork

    455 MILNER AVE · Sep 27, 2023 · 212 m away
  • Building permit

    Interior alterations - infill opening in demising wall between units 9/10. Create opening in demising wall between units 10/11

    465 MILNER AVE · Jul 24, 2023 · 149 m away
  • Building permit

    Proposal for interior alterations to existing space. SHELL Unit 4

    445 MILNER AVE · Apr 21, 2022 · 284 m away

Neighbourhood: Malvern East

About the area around the lot, not the lot itself.

Nearest station
McCowan Rt Station46 min walk
Nearest TTC stop
Milner Ave at Novopharm Crt4 min walk
Nearest traffic count
6,360 vehicles in 8 hMilner Ave: Dailing Gt - Burrows Hall Blvd, 120 m away, May 20, 2009
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Burrows Hall Park1 min walk
Trca Lands ( 90)4 min walk
Morningside Park6 min walk

Schools within 1 km

  • BURROWS HALL JR PUBLIC SCHOOL English Public 4 min walk
  • VEDIC ROOTS Private 10 min walk
  • ST BARNABAS CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • CENTENNIAL COLLEGE SCHOOL - PROGRESS CAMPUS College 12 min walk
  • MALVERN JR PUBLIC SCHOOL English Public 14 min walk
  • ST EDMUND CAMPION CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMalvern EastMedian neighbourhood
Median household income (2020)$85,000$84,500
Households that own their home70%54%
Population (2021)26,09516,813
Homes built in 1960 or before4%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMalvern EastCity median
Assault505.9636.3
Robbery80.869.5
Auto theft224.8192.6
Theft over $5,00035.146.1
Break and enter80.8172.8
Theft from vehicles186.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.