HousePrecheckCheck an address

523 The QueenswayToronto · zoning, lot size and permit records

Employment · E 1.039.9 × 68.8 m2,506 m²on The Queensway

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
39.9 m frontage68.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (85% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (72% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit22 215585Closed

    INTERIOR ALTREATION TO CREAT PHARMACY

    Nov 17, 2022 · 523 THE QUEENSWAY
  • Zoning review22 146533 ZZUClosed
    May 13, 2022 · 523 THE QUEENSWAY
  • Building permit16 228728Closed

    Proposal to install a 1" DVCA backflow prevention device in the existing multiple use building

    Sep 29, 2016 · 523 THE QUEENSWAY
  • Building permit12 246162Closed

    To erect and display an illuminated static copy ground sign at the westerly frontage of the property for the purpose of identication of the building and business operating on the premises. **523**

    Sep 19, 2012 · 523 THE QUEENSWAY
  • Development application10 101215 WET 05 SAClosed

    To construct a new one storey building,

    Jan 6, 2010 · 515 THE QUEENSWAY

Lot facts

Area
2,506 m²
Frontage
39.9 m
Depth
68.8 m
Street
The Queensway
Corner lot
No
Public lane
None
House footprint
370 m²roof up to 12.7 m
Back yard
18.1 mhouse to rear lot line
Side yards
6.5 m and 16.7 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
92%23 of 25 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
0

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).

Latest activity nearby

  • Consent (lot split)Approved

    To obtain consent to sever the property into two undersized residential lots.

    13 BRUSSELS ST · Nov 19, 2026 · 230 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    13 BRUSSELS ST · Nov 19, 2026 · 230 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    13 BRUSSELS ST · Nov 19, 2026 · 230 m away
  • Building permit

    Proposed interior alterations to change kitchen layout.

    7 E BRUSSELS ST · Oct 15, 2026 · 208 m away
  • Minor varianceApproved

    To alter the existing building in order to accommodate an eating establishment with a drive through facility.

    515 THE QUEENSWAY · Sep 24, 2026 · 30 m away
  • Building permit

    Proposal to demolish the detached garage and construct a 1 storey garage addition, a new second storey addition and interior alterations to an existing SFD-detached dwelling.See also 26 116983 ZAP

    26 BONNYVIEW DR · Sep 18, 2026 · 285 m away
  • Building permitnew building

    CONSTRUCT BELOW GRADE PARKING GARAGE. RELATED TO 26 200809 (construction of a townhouse development with six dwelling units on six separate lots and an underground parking garage)

    598 THE QUEENSWAY · Jul 28, 2026 · 285 m away
  • Building permitnew building, new house

    Demolition of the existing one-storey industrial building and construction of a townhouse development with six dwelling units on six separate lots and an underground parking garage.

    598 THE QUEENSWAY · Jul 13, 2026 · 285 m away
  • Building permitdemolition

    Demolition of the existing one-storey industrial building and construction of a townhouse development consisting of six three-storey single-family townhouse dwelling units on six separate lots, with an underground parking garage.

    598 THE QUEENSWAY · Jul 13, 2026 · 285 m away
  • Building permit

    2 Ground Signs****Tim Hortons ****

    152 PARK LAWN RD · Jun 22, 2026 · 110 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station23 min walk
Nearest TTC stop
Park Lawn Rd at The Queensway South Side1 min walk
Nearest cycling route
Jeff Healey Park TrlMulti-Use Trail - Connector, 5 min walk
Nearest traffic count
36,846 vehicles in 14 hPark Lawn Rd / The Queensway, 70 m away, Apr 13, 2025
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Trca Lands ( 47)1 min walk
Jeff Healey Park2 min walk
Trca Lands ( 79)2 min walk

Schools within 1 km

  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 6 min walk
  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 6 min walk
  • ST MARK CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • ETIENNE BRULE JR SCHOOL English Public 13 min walk
  • KAREN KAIN SCHOOL OF THE ARTS English Public 13 min walk
  • ST LOUIS CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.