≈ 66.3 × 106.1 m5,505 m²on Ellerslie Avecorner, also on Yonge St

Not a home

A commercial or mixed-use building

16 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 121487 NNY 18 OZ (Zoning By-law Amendment Application proposes a Senior's Residential Accommodation inclu..., 2026); 23 196812 NNY 18 CD (Retail component of an approved mixed use development including a residential, and comm..., 2023); 23 196769 NNY 18 CD (Office component of an approved mixed use development including a retail and residentia..., 2023). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N50 m
≈ 66.3 m frontage≈ 106.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 124706 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 121487 NNY 18 OZ (Zoning By-law Amendment Application proposes a Senior's Residential Accommodation inclu..., 2026); 23 196812 NNY 18 CD (Retail component of an approved mixed use development including a residential, and comm..., 2023); 23 196769 NNY 18 CD (Office component of an approved mixed use development including a retail and residentia..., 2023).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0184/23NY (To permit a reduction in the required number of parking spaces per dwelling unit for re..., 2023).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

29 records on file: more than at 100% of Toronto houses (median 0).

  • Development application26 121487 NNY 18 OZUnder Review

    Zoning By-law Amendment Application proposes a Senior's Residential Accommodation including Seniors Independent Living, Assisted Living and Long-Term Care Home accommodations within the component in the previously approved commercial (office) section of the existing building.

    Feb 25, 2026 · 5220 YONGE ST · City file
  • By-law investigation25 233032 WST 00 IRClosed

    Waste

    Sep 30, 2025 · 5220 YONGE ST
  • Zoning review25 159345 LPRCancelled
    May 14, 2025 · 5220 YONGE ST
  • By-law investigation25 124706 PRS 00 IRClosed

    Property Standards

    Mar 4, 2025 · 5220 YONGE ST
  • Zoning review24 144434 LPRClosed
    May 6, 2024 · 5220 YONGE ST
  • Building permit24 136366Closed

    Installation of (18) maglocks

    Apr 19, 2024 · 5220 YONGE ST
  • Development application23 196812 NNY 18 CDDraft Plan Approved

    Retail component of an approved mixed use development including a residential, and commericial/office component. Associated with Condominium Applications No. 23 196767 NNY 18 CD and No. 23 196769 NNY 18 CD.

    Sep 1, 2023 · 5220 YONGE ST · City file
  • Development application23 196769 NNY 18 CDDraft Plan Approved

    Office component of an approved mixed use development including a retail and residential component. Associated with Condominium Applications No. 23 196812 NNY 18 CD and No. 23 196767 NNY 18 CD.

    Sep 1, 2023 · 5250-5254 YONGE ST · City file
Show 21 older records
  • Minor varianceA0184/23NYApproved

    To permit a reduction in the required number of parking spaces per dwelling unit for residents.

    May 25, 2023 · 5220 YONGE ST
  • Zoning review23 120842 LPRClosed
    Mar 7, 2023 · 5220 YONGE ST
  • Building permit21 156437Approved

    Alternative Solution for proposed use of the fire hose valves within the high rise building, for providing 65mm diameter standpipe hose connections within the exit stairs serving the residential tower on Levels 3 through the Mechanical Penthouse Level

    May 18, 2021 · 5220 YONGE ST
  • Building permit18 272796Closed

    Part Permit for building A and B- Construct a new 10-storey office building with 4-storey underground garage and one 2-storey commercial podium and one 3-storey commercial podium (building A). Construct a new 31-storey residential building (building B)

    Sep 30, 2020 · 5220 YONGE ST
  • Building permit19 105785Closeddemolition

    To demolish the existing 2-storey brick building.

    Oct 31, 2019 · 5248 YONGE ST
  • Building permit16 210917Cancelled

    <<APPLICANT REQUESTED CANCELLATION, SEE ATTACHED LETTER>> mkIn conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated ground sign containing two sign faces on the west frontage. The proposed sign contains two sign faces, both measuring 6.15 metres vertically by 4.06 metres horizontally at a height of 7.24 metres above grade.**GWL Realty advisors Inc**

    Aug 22, 2016 · 5222 YONGE ST
  • Building permit16 186170Cancelled

    To erect and display one non-illuminated ground sign.**G GROUP**

    Jul 8, 2016 · 5220 YONGE ST
  • Zoning review09 169315 POZClosed
    Dec 15, 2015 · 5220 YONGE ST
  • Zoning review13 262248 ZZUClosed
    Nov 7, 2013 · 5220 YONGE ST
  • Building permit11 262195Closeddemolition

    Demolish one storey commercial retail building

    Sep 21, 2011 · 5222 YONGE ST
  • Building permit11 262194Closeddemolition

    Demolish one storey commercial retail building

    Sep 21, 2011 · 5246 YONGE ST
  • Building permit11 262188Closeddemolition

    Demolish one storey commercial retail building

    Sep 21, 2011 · 5220 YONGE ST
  • Development application10 247876 NNY 23 SAClosed

    Site Plan Application for a mixed-use development consisting of a 14-storey hotel and 29-storey residential tower including a podium/base building with commercial uses. Seven Rental replacement units to be provided in the form of 'garden apartments'. Application has been circulated under the associated OPA/Zoning Application 09 165755 NNY 23 OZ. The associated Rental Housing Demolition and Conversion Application File is 09 165759 NNY OO RH.

    Aug 26, 2010 · 5220 YONGE ST · City file
  • Building permit09 112937Closed

    Convert existing garage to temporary sales office

    Oct 6, 2009 · 5220 YONGE ST
  • Development application09 165755 NNY 23 OZClosed

    REVISED PROPOSAL MAY 23, 2017: 31-storey residential tower, including a 2-5 storey podium base building and a 10-storey commercial/office building. The towers wil have a total of 308 residential units of which seven will be relocated rental units previously existing. ORIGINAL WORK DESCRIPTION:Offical Plan Amendment and Rezoning application for a mixed-use development consisting of a 14-storey hotel and 30-storey residential tower including a podium/base building with commercial uses. Seven Rental replacement units to be provided in the form of 'garden apartments'. Assocated applications include Site Plan Application 10 247876 NNY 23 SA and Rental Housing Demolition and Conversion Application 09 165759 NNY OO RH.

    Sep 3, 2009 · 5220 B YONGE ST · City file
  • Zoning review09 132815 PSPClosed
    May 1, 2009 · 5220 YONGE ST
  • Development application09 126061 NNY 23 SAClosed

    The former Speedy Muffler building located at 5220 Yonge St. is to be converted into a sales office for the proposed Centrium, North York Development, which is a mixed use development to be constructed at the s/w corner of Yonge St, and Ellerslie Avenue (5220-5254 Yonge St.).

    Apr 15, 2009 · 5220 YONGE ST
  • Zoning review08 227664 ZALCancelled
    Dec 5, 2008 · 5220 YONGE ST
  • Zoning review08 223388 LPRClosed
    Nov 20, 2008 · 5222 YONGE ST
  • Zoning review08 184327 LPRClosed
    Jul 21, 2008 · 5220 YONGE ST
  • Building permit03 106708Cancelled

    TEMPORARY TRAILER (SPRING 2004) FOR CITY OWNED - YOUTH SHELTER

    Feb 6, 2003 · 5248 YONGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
5,505 m²
Frontage
66.3 mestimated, irregular lot
Depth
106.1 mestimated, irregular lot
Street
Ellerslie Ave
Corner lot
Yes, also on Yonge St106.1 m along it
Public lane
None
House footprint
2,409 m²
Back yard
11.9 mhouse to rear lot line
Side yards
5.6 m and 24.2 mhouse to side lot lines
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%14 of 14 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    12

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached 2 storey dwelling.

      79 EMPRESS AVE · Feb 19, 2026 · 440 m away
    • Minor varianceApproved

      To construct a four-storey apartment building with 14 residential units. This application was previously deferred at the Committee of Adjustment hearing on August 28, 2025.

      72 CHURCH AVE · Oct 23, 2025 · 487 m away
    • Minor varianceApproved

      To alter the development standards (as approved by Site-Specific Zoning By-law Nos. 1118-2022(OLT) and 131-2025) for the proposed 40-storey mixed use building, to permit a nursing home, increase the podium height, reduce the overall tower height, increase the total gross floor area, reduce the non-residential gross floor area, and reduce the residential parking rate.

      5306 YONGE ST · Aug 14, 2025 · 164 m away
    • Minor varianceApproved

      To alter the previously approved 26-storey residential building under site-specific By-law 409-2024 related to balcony projections, the location of accessible parking spaces, the minimum percentage of three-bedroom units and setbacks from the One Family Detached Dwelling Zone. This application was previously deferred at the Committee of Adjustment hearing on March 20, 2025.

      26 HOUNSLOW AVE · May 1, 2025 · 487 m away
    • Minor varianceApproved

      To increase the total gross floor area, permitted building height and number of storeys and reduce residential parking space rate. Related By-law No.1118-2022(OLT) and By-law No. 131-2024.

      5306 YONGE ST · Mar 6, 2025 · 164 m away

    Latest activity nearby

    • Building permit

      This is a structural garage restoration involving demolition, brick masonry reconstruction, roof framing replacement, roofing repairs, and reinstatement of affected finishes¿not a complete garage rebuild.

      50 PARKVIEW AVE · Nov 23, 2026 · 272 m away
    • Building permit

      Proposal for new sprinkler pipe installation. 1.1 Identify drywall ceiling to be removed (by others) for sprinkler pipe installation.1.2 Connect new sprinkler piping to existing 2½" sprinkler main feeding ground level sprinklers located Electrical room.1.3 Supply and install up to eight (8) new concealed pendent sprinkler heads c/w white cover plates and all associated feed piping from electrical room

      238 DORIS AVE · Nov 20, 2026 · 173 m away
    • Building permit

      Proposed localized concrete repairs at exterior walls and slab edges, and localized asphalt repairs at exterior vehicular loop.

      55 ELLERSLIE AVE · Nov 19, 2026 · 60 m away
    • Minor variancePending

      In Process

      8 KINGSDALE AVE · Nov 10, 2026 · 156 m away
    • Building permit

      Proposed interior alterations to an existing office suite, including construction of non-load-bearing partitions and minor redistribution of electrical, mechanical, and life safety systems.

      5255 YONGE ST · Nov 4, 2026 · 125 m away
    • Building permit

      Proposal for interior alterations to an existing office

      5160 YONGE ST · Oct 29, 2026 · 280 m away
    • Zoning review

      Closed

      5293 YONGE ST · Oct 7, 2026 · 176 m away
    • Building permit

      INTERIOR ALTERATION OF EXISTNG OFFICE SPACE.

      5255 YONGE ST · Oct 5, 2026 · 125 m away
    • Building permit

      REVISION - changes to ceiling typeProposal for interior alterations

      5255 YONGE ST · Sep 15, 2026 · 125 m away
    • Building permit

      Proposed interior alterations to existing SFD to convert building to a temporary sales office.

      11 PARKVIEW AVE · Sep 3, 2026 · 137 m away

    Neighbourhood: Willowdale West

    About the area around the lot, not the lot itself.

    Nearest station
    North York Centre Station7 min walk
    Nearest TTC stop
    Yonge St at Norton Ave2 min walk
    Nearest cycling route
    Willowdale AveCycle Track, 14 min walk
    Nearest traffic count
    997 vehicles in 8 hEllerslie Ave / Canterbury Pl, 60 m away, Sep 19, 2018
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Doris - Norton Park3 min walk
    CANTERBURY PLACE - Open Green Space3 min walk
    North York Rose Garden3 min walk

    Schools within 1 km

    • CROWN ACADEMY Private 1 min walk
    • TORONTO FRENCH MONTESSORI Private 3 min walk
    • MCKEE PUBLIC SCHOOL English Public 6 min walk
    • TORONTO DISTRICT SCHOOL BOARD - HEAD OFFICE English Public 8 min walk
    • ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
    • EARL HAIG SECONDARY SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWillowdale WestMedian neighbourhood
    Median household income (2020)$76,500$84,500
    Households that own their home60%54%
    Population (2021)17,16016,813
    Homes built in 1960 or before19%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWillowdale WestCity median
    Assault561.2636.3
    Robbery51.969.5
    Auto theft89.6192.6
    Theft over $5,00037.746.1
    Break and enter103.7172.8
    Theft from vehicles141.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.