HousePrecheckCheck an address

520 Progress AveToronto · zoning, lot size and permit records

50.0 × 107.1 m4,794 m²on Progress Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 117105 (1 Overhanging structure sign"Piper Arms""Piper Arms", 2025). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
50.0 m frontage107.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 117105 (1 Overhanging structure sign"Piper Arms""Piper Arms", 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B049/12SC (This application is for a right-of-way over Part 2 (shown on the attached Right-of-Way..., 2013).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit25 117105Work Not Started

    1 Overhanging structure sign"Piper Arms""Piper Arms"

    Mar 4, 2025 · 520 PROGRESS AVE
  • Building permit25 115731Cancelled

    1 Overhanging structure sign"Piper Arms"

    Feb 11, 2025 · 520 PROGRESS AVE
  • Building permit22 158380Closed

    REVISION - extend outdoor patio and provide exterior door to the patioProposed interior alterations and outdoor patio deck extension for restaurant

    May 10, 2023 · 520 PROGRESS AVE
  • Development application21 206885 ESC 21 OZClosed

    The application aims to establish a long-term planning framework for 300 Borough Drive, 1755 Brimley Road, 400-580 Progress Avenue and 350 Town Centre Court.

    Sep 1, 2021 · 520 PROGRESS AVE · City file
  • Zoning review18 157472 ZZUClosed
    May 11, 2018 · 520 PROGRESS AVE
  • Consent (lot split)B049/12SCApproved

    This application is for a right-of-way over Part 2 (shown on the attached Right-of-Way Plan) in favour of the property at 500-510 Progress Avenue as part of a reciprocal right-of-way arrangement between the two properties to facilitate access from a common driveway. A separate application for consent would create a right-of-way over Part 1 in favour of the property at 520 Progress Avenue (File B048/12SC). The owners are proposing to develop the property at 500 - 510 Progress Avenue with a retail commercial development with two freestanding buildings. The property at 520 Progress Avenue is the existing Baton Rouge / Scott House restaurant.

    Jan 16, 2013 · 520 PROGRESS AVE
  • Development application10 277733 ESC 38 OZClosed

    To lift the "H" on site and to construct 2 retail buildings. Applicant has submitted revised proposal that now includes the former Scott House at 520 Progress.

    Oct 14, 2010 · 520 PROGRESS AVE
  • Building permit08 167638Closed

    Interior alterations to existing restaurant- new owners

    Aug 21, 2008 · 520 PROGRESS AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,794 m²
Frontage
50 m
Depth
107.1 m
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
666 m²roof up to 11.1 m
Back yard
48.1 mhouse to rear lot line
Side yards
4.1 m and 14.4 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    1

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a total of 439 parking spaces for a development which contains two mixed-use buildings, 38 and 44-storeys in height, containing a total of 778 residential units. Cross-reference Site Plan Control Application 19 256766 ESC 24 SA.

      5 CORPORATE DR · Sep 10, 2025 · 388 m away
    • Minor varianceApproved

      To permit the use of an education and training facility.

      300 BOROUGH DR · Aug 23, 2023 · 361 m away
    • Minor varianceApproved

      To permit recreational uses as a primary use. NOTE: This minor variance application applies to the property municipally known as 350 Consilium Place.

      100 CONSILIUM PL · Jul 26, 2023 · 477 m away
    • Minor varianceApproved

      To permit the construction of two rental residential towers with heights of 38 and 44-storeys joined by a 4-storey podium at the south-west corner of Consilium Place and Corporate Drive. The proposal will include 778 dwelling units, 731 square metres of commercial gross floor area, two levels of underground parking, indoor & outdoor amenity areas and surface parking areas (for visitors, car-share & retail). Cross Reference Site Plan Control Application 19 256766 ESC 24 SA and Official Plan Amendment Application 20 160281 ESC 24 OZ (to establish a cap on parkland dedication for the site).

      5 CORPORATE DR · Mar 10, 2022 · 388 m away
    • Minor varianceApproved

      To demolish a portion of the existing above-grade parking deck structure on the north side of the Scarborough Town Centre mall adjacent to Progress Avenue.

      300 BOROUGH DR · Jun 21, 2018 · 361 m away

    Latest activity nearby

    • Building permit

      Proposal construct 2 temporary tent structures for circus events. Set up August 4, 2026, tear down Aug 17, 2026.

      500 PROGRESS AVE · Jul 8, 2026 · 128 m away
    • Building permit

      Please refer to attached Alternate Solution Letter to the City Scarborough. PROVISION OF SANITARY FACILITIES: The temporary structure event will be provided with 20 water closets (11 female, 9 male).

      500 PROGRESS AVE · Jun 11, 2026 · 128 m away
    • Building permit

      Proposal to install 2 temporary tents in 500 Progress Ave for "Paranormal Cirque" from October 10, 2025 to October 13, 2025

      500 PROGRESS AVE · Oct 6, 2025 · 128 m away
    • Building permit

      1 Overhanging structure sign"Piper Arms""Piper Arms"

      520 PROGRESS AVE · Mar 4, 2025 · 20 m away
    • Building permit

      1 Overhanging structure sign"Piper Arms"

      520 PROGRESS AVE · Feb 11, 2025 · 20 m away
    • Building permit

      Installation of a 20' x 40' Frame Tent, anchored with Water Barrels, for Chow Fest 2024. Installation Date - August 23 and Removal Dale - August 26/2024

      500 PROGRESS AVE · Aug 27, 2024 · 128 m away
    • Building permit

      Temporary Structures, Other, Temporary Installation of a 30'x60'. Tent installation will be Oct 1st or 2nd and removed Oct 28th or 29th 2023.

      500 PROGRESS AVE · Sep 28, 2023 · 128 m away
    • Building permit

      Application for a permit to erect and display three illuminated wall signs.*****LA Z BOY*****

      530 PROGRESS AVE · Jun 29, 2023 · 58 m away
    • Building permit

      REVISION - extend outdoor patio and provide exterior door to the patioProposed interior alterations and outdoor patio deck extension for restaurant

      520 PROGRESS AVE · May 10, 2023 · 20 m away
    • Development application

      The application aims to establish a long-term planning framework for 300 Borough Drive, 1755 Brimley Road, 400-580 Progress Avenue and 350 Town Centre Court.

      520 PROGRESS AVE · Sep 1, 2021 · 27 m away · City file

    Neighbourhood: Bendale-Glen Andrew

    About the area around the lot, not the lot itself.

    Nearest station
    Scarborough Centre Station10 min walk
    Nearest TTC stop
    Walmart Scarborough Town Centre4 min walk
    Nearest cycling route
    Brimley RdMulti-Use Trail - Boulevard, 10 min walk
    Nearest traffic count
    18,762 vehicles in 14 hProgress Ave / Corporate Dr, 180 m away, Apr 21, 2024
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Snowhill Park7 min walk
    McDairmid Woods Park10 min walk
    Hillsborough Park11 min walk

    Schools within 1 km

    • MADINATUL ULOOM ISLAMIC ACADEMY & OXFORD COLLEGE & FH INTERNATIONAL Private 10 min walk
    • TOWN CENTRE LINC English Public 10 min walk
    • MAC AL-FURQAN SCHOOL Private 11 min walk
    • CANADIAN TAMIL ACADEMY Private 12 min walk
    • AL HAADI SCHOOL Private 12 min walk
    • MADINATUL ULOOM ISLAMIC GIRLS ACADEMY Private 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBendale-Glen AndrewMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home61%54%
    Population (2021)18,68516,813
    Homes built in 1960 or before24%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBendale-Glen AndrewCity median
    Assault871.8636.3
    Robbery222.869.5
    Homicide9.75.3
    Shootings14.510.5
    Auto theft464.9192.6
    Theft over $5,00082.346.1
    Break and enter145.3172.8
    Theft from vehicles290.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.