Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (96% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Natural Heritage System (100% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 91 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
No permits, applications or Committee of Adjustment files on this lot in the City's open records.
Check before you build
Site-specific exception 900.5.10(7)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of Etobicoke by-law 1995-43.
Lot facts
- Area
- 299 m²
- Frontage
- 11 mestimated, irregular lot
- Depth
- 47.8 mestimated, irregular lot
- Street
- Triple Crown Ave
- Corner lot
- No
- Public lane
- None
- Max height
- —
- Max lot coverage
- 25%
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Plumbing - Proposal to legalize basement apartment and side entrance.
132 TRIPLE CROWN AVE · Jul 8, 2026 · 263 m away - Building permit
Proposal for interior alterations and enlarging window in basement.
28 MARE CRES · Apr 17, 2025 · 173 m away - Building permit
Proposal to construct a finished basement with 1 window to be enlarged.
21 STALLION PL · Apr 2, 2025 · 144 m away - Building permit
Proposal to construct 1 storey front addition (unheated) and rear additoion (unheated) and minor interior alterations.
19 TRIPLE CROWN AVE · Aug 9, 2024 · 181 m away - Building permit
The Rapid Transit Stations of the Finch West LRT are required to comply with Section 3.13 of the OBC. Based on the acceptable solutions in the OBC, the fire alarm system at a rapid transit station is required to be monitored the central supervising station which is required to conform to CAN/ULC-S561, under the two following provisions:¿ Sentence 3.13.5.4.(1): Each rapid transit station shall be monitored by a central supervising station conforming to CAN/ULC-S561, ¿Installation and Services for Fire Signal Receiving Centres and Systems¿, and ¿ Sentence 3.13.5.6.(2): The annunciator at a rapid transit station shall be monitored simultaneously at the central supervising station.During the testing and commissioning period prior to the commencement of full revenue service, Mosaic Transit Constructors (MTC) is the `interim operator¿ of the system. After testing and commissioning is complete, MTC will pass over control of the LRT line to the Toronto Transit Commission. The fire alarm monitoring for the Finch West LRT is designed around integration with the Hillcrest Operational Control Centre (HOCC), operated by TTC.During the Pre-Revenue Service Period (PRSP), this alternative solution proposes that the fire alarm system be connected to a remote CAN/ULC-S561 facility that relays fire alarm signals to the temporary central supervising station responsible for train operations only.
203-205 HUMBER COLLEGE BLVD · Jul 4, 2024 · 288 m away - Building permit
Replace backflow preventer - Humber College Student Residence
203-205 HUMBER COLLEGE BLVD · Feb 14, 2022 · 288 m away - Building permit
Plumbing - Proposal for interior alterations and reconstruction of the roof to repair structural damage due to fire in an existing SFD-townhouse.
11 STALLION PL · Oct 18, 2021 · 141 m away - Building permit
Construct Traction Power Substation - TPSS #1 for Finch West LRT
203-205 HUMBER COLLEGE BLVD · Aug 20, 2021 · 288 m away - Building permit
Proposal for interior alterations for a secondary unit.
16 JANDA CRT · Aug 21, 2020 · 211 m away - Building permit
Basement entrance
22 STALLION PL · Aug 12, 2020 · 100 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Humber College Station10 min walk
- Nearest TTC stop
- Queen's Plate Dr (West) at Triple Crown Ave West Side4 min walk
- Nearest cycling route
- West Humber TrlMulti-Use Trail - Entrance, 1 min walk
- Nearest traffic count
- 4,435 vehicles in 8 hTriple Crown Ave / Queen's Plate Dr, 240 m away, Mar 20, 2013
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Humber Arboretum1 min walk
- Janda Park3 min walk
- Triple Crown Parkette3 min walk
Schools within 1 km
- HUMBER COLLEGE SCHOOL - UNIVERSITY OF GUELPH BLDG College 7 min walk
- HUMBER COLLEGE SCHOOL - NORTH CAMPUS College 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.