HousePrecheckCheck an address

519 Church StToronto · zoning, lot size and permit records

Open space · OR39.2 × 52.7 m2,049 m²on Church St

Not a home

Barbara Hall Park & Community Centre

The City of Toronto's real estate inventory lists Barbara Hall Park & Community Centre here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 235774 (Proposal for installation of an art work on the front face of existing building. Weight..., 2026); 26 181396 (Proposed temporary event structures for Green Space Festival 2026. The build date is on..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 25 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.
N20 m
39.2 m frontage52.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2003

    Needs a closer look

    Still open in the City's records: 24 115081 (Proposed interior & minor exterior alterations for accessibility upgrades to the existi..., 2024, status Permit Issued); 04 116885 (Revision #2: Emergency repair to exit stairwell. revision to building permit - demonstr..., 2016, status Revision Issued); 03 172734 (HVAC - Make interior alterations to portions of basement for storage space. - Interior..., 2003, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 235774 (Proposal for installation of an art work on the front face of existing building. Weight..., 2026); 26 181396 (Proposed temporary event structures for Green Space Festival 2026. The build date is on..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0010/04TEY (The applicant is seeking relief from the provisions of the Zoning By-law in order to co..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 25 development applications open within 300 m

    Good to know

    25 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

38 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 235774Permit Issued

    Proposal for installation of an art work on the front face of existing building. Weight 150kg

    Sep 25, 2026 · 519 CHURCH ST
  • Building permit26 181396Permit Issued

    Proposed temporary event structures for Green Space Festival 2026. The build date is on June 22, 2026 and the dismantle date is on June 29, 2026.

    Jun 18, 2026 · 519 CHURCH ST
  • Building permit25 238213Closed

    REV : Proposed scope of work to exclude addition of several doors.Proposal for interior alteration to the lobby, reception area, and offices of existingcommunity center.

    Feb 26, 2026 · 519 CHURCH ST
  • By-law investigation26 120154 WST 00 IRClosed

    Waste

    Feb 23, 2026 · 519 CHURCH ST
  • Building permit25 171259Closed

    Erect three temporary structure for pride, installation date June 23 and removal date July 3, 2025

    Jun 18, 2025 · 519 CHURCH ST
  • Building permit24 228672Closed

    Installation of one 30' x 60' tent for an event. Tent will be anchored by concrete blocks. Installation to begin on November 19th, 2024. Removal is scheduled for November 21st, 2024.

    Nov 20, 2024 · 519 CHURCH ST
  • Building permit24 161495Closed

    Erect three temporary structure for pride, installation date June 24 and removal date July 2/2024 - Barbara Hall Park

    Jun 26, 2024 · 519 CHURCH ST
  • Building permit24 115081Permit Issued

    Proposed interior & minor exterior alterations for accessibility upgrades to the existing non-residential building. Work to the Basement, 1st, 2nd & 3rd floor levels. (Minor ext. alts. for new posts, handrails, guardrails, entrance door.) [Tenant - CoT - Church Street Community Centre (the 519)]

    Jun 14, 2024 · 519 CHURCH ST
Show 30 older records
  • Building permit23 225803Closed

    Installation of one 30' by 60' Frame Tent (Cert# 14-219367) anchored with concrete blocks at The 519 for community outreach from November 19th to November 21st 2023.

    Nov 16, 2023 · 519 CHURCH ST
  • Building permit23 152380Closed

    Erect temporary structure for Pride. Installation date is june 21 to June 26 2023.

    Jun 20, 2023 · 519 CHURCH ST
  • Building permit22 228280Closed

    Proposal to install temporary certified tent structure (Barbara Hall Park).

    Nov 15, 2022 · 519 CHURCH ST
  • Building permit22 132667Closed

    Proposal to erect 15 temporary 10*10 pop up canopy tents for a single day outdoor vendor market on May 07, 2022. All tents will be secured with sandbags attached to each pole.

    Apr 29, 2022 · 519 CHURCH ST
  • Building permit21 229130Closed

    Construction of new stair enclosure, Waterproofing of foundation wall and related repairs.

    Nov 22, 2021 · 519 CHURCH ST
  • Building permit18 169612Closed

    Proposal to set up a 20' x 40' temporary tent (uncertified) from June 22 - June 24, 2018.

    Jun 6, 2018 · 519 CHURCH ST
  • Building permit17 226241Closed

    Construct 1 stage and 17 pop ups. Setup and take down Sunday September 10, 2017 for Aids Walk

    Sep 8, 2017 · 519 CHURCH ST
  • Building permit16 232877Closed

    Proposal to replace doors and accessibility upgrades (exterior concrete curb/ramp) in existing Community Centre.

    Nov 4, 2016 · 519 CHURCH ST
  • Building permit16 220299Closed

    Construct 1 stage and 17 pop ups. Setup and take down Sunday September 11, 2016 for Aids Walk

    Sep 9, 2016 · 519 CHURCH ST
  • Building permit16 175813Closed

    Interior Alteration to the existing lobby on the ground floor. Providing a glazed screen and millwork. All life safety and fire seperations to remain unchanged. Mechanical and electrical to remain unchanged.

    Jul 4, 2016 · 519 CHURCH ST
  • Building permit04 116885Revision Issued

    Revision #2: Emergency repair to exit stairwell. revision to building permit - demonstrate existing fire alarm conditions in response to 06 156083 OTC - Renovation of the existing 519 Church Street Community Centre, plus construction of a new 3 - storey addition.

    May 30, 2016 · 519 CHURCH ST
  • Building permit15 139923Closed

    Proposal for structural re roofing to replace the roof deck and structural re-enforcement to the existing community centre.

    Jun 1, 2015 · 519 CHURCH ST
  • Building permit14 251642Closed

    OTHER, PROPOSAL TO INSTALL 1 BACKFLOW PREVENTION DEVICE (WATER ONLY) IN EXISTING BUILDING - 519 CHURCH ST. COMMUNITY CTRE

    Nov 24, 2014 · 519 CHURCH ST
  • Building permit08 110675Closed

    Proposal to underpin, waterproof, & replace portions of brick.

    Mar 3, 2008 · 519 CHURCH ST
  • Building permit07 218371Closed - Dormant

    Area drains to connect exiting storm systems in cawthra park connected to community center

    May 31, 2007 · 519 CHURCH ST
  • Building permit04 169493Closed

    Sprinklers in related to permit # 04-116885 (no plans in this file)

    May 25, 2006 · 519 CHURCH ST
  • Building permit05 211353Closed

    to waterproof foundation wall and construct a subdrain and sump pump

    Jan 16, 2006 · 519 CHURCH ST
  • Building permit05 157297Closed

    Repair parapet on front elevation.

    Jul 20, 2005 · 519 CHURCH ST
  • Building permit05 127883Cancelled

    To install sprinkler system in new 3 floor addition.

    Apr 29, 2005 · 519 CHURCH ST
  • Building permit05 106521Closed

    DRAIN. original BP# 04-116885

    Feb 14, 2005 · 519 CHURCH ST
  • Minor varianceA0010/04TEYApproved

    The applicant is seeking relief from the provisions of the Zoning By-law in order to construct a three-storey addition on the south side of the existing community centre building. The addition will have dimensions of approximately 9.5 by 39 metres and a floor area of approximately 918 square metres.

    Feb 4, 2004 · 519 CHURCH ST
  • Building permit03 172734Inspection

    HVAC - Make interior alterations to portions of basement for storage space. - Interior Alterations

    Oct 24, 2003 · 519 CHURCH ST
  • Zoning review03 101530 PSPClosed
    Jan 13, 2003 · 519 CHURCH ST
  • Building permit02 169344Closed

    make interior alterations to main stairs.

    Sep 12, 2002 · 519 CHURCH ST
  • Building permit02 107906Closed

    erect 1 temporary tent structure approx 14' x 20' erect jun 27 02 dismantle jun 28 02 HISTORICAL

    Apr 12, 2002 · 519 CHURCH ST
  • Building permit01 106841Closed

    erect temporary tent structure 14' X 20'. teo be erected june 20/01 and dismantled june 23/01.

    Feb 6, 2001 · 519 CHURCH ST
  • Zoning review00 013156 LTOClosed
    Nov 28, 2000 · 519 CHURCH ST
  • Building permit00 144162Closednew building

    erect temporary tent structure: 14' x 20' (26.01 sq m). to be assembled on june 21st, 2000 and dismantled by june 23rd, 2000.

    May 2, 2000 · 519 CHURCH ST
  • Zoning review84 026261 LTOClosed
    Mar 13, 1984 · 519 CHURCH ST
  • Zoning review82 026463 LTOClosed
    Sep 20, 1982 · 519 CHURCH ST

Lot facts

Area
2,049 m²
Frontage
39.2 m
Depth
52.7 m
Street
Church St
Corner lot
No
Public lane
None
House footprint
595 m²
Back yard
13.2 mhouse to rear lot line
Side yards
3.1 m and 19.1 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
95%19 of 20 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
40

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Oct 28, 2026 · 204 m away
  • Building permit

    REV01: As bubbled on drawings.HVAC - Proposal for interior alterations to convert existing storage into leasing office and storage.

    15 DUNDONALD ST · Sep 30, 2026 · 263 m away
  • Building permit

    Proposal for installation of an art work on the front face of existing building. Weight 150kg

    519 CHURCH ST · Sep 25, 2026 · 14 m away
  • Zoning review

    Cancelled

    584 CHURCH ST · Sep 22, 2026 · 92 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 253 m away
  • Zoning review

    Closed

    473 CHURCH ST · Sep 2, 2026 · 227 m away
  • Building permit

    Installation of one Electromagnetic Lock on ground floor.

    20 MAITLAND ST · Sep 1, 2026 · 300 m away
  • Building permitmultiplex

    REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.

    109 GLOUCESTER ST · Jul 24, 2026 · 153 m away
  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Jul 10, 2026 · 204 m away
  • Building permit

    Proposed temporary event structures for Green Space Festival 2026. The build date is on June 22, 2026 and the dismantle date is on June 29, 2026.

    519 CHURCH ST · Jun 18, 2026 · 14 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station5 min walk
Nearest TTC stop
Wellesley St East at Church St1 min walk
Nearest cycling route
Wellesley St ECycle Track, 1 min walk
Nearest traffic count
14,434 vehicles in 14 hWellesley St E / Church St, 90 m away, Sep 26, 2026
Serious collisions within 500 m
112021–2026, killed or seriously injured: 0 fatal, 7 with pedestrians, 1 with cyclists
Parks
Barbara Hall Park1 min walk
Paul Kane House Parkette2 min walk
James Canning Gardens4 min walk

Schools within 1 km

  • THE ABELARD CENTRE FOR EDUCATION Private 1 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 4 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 4 min walk
  • NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 5 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 5 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.