HousePrecheckCheck an address

515 Royal York RdToronto · zoning, lot size and permit records

Residential multiple · RM (x16)≈ 32.0 × 57.5 m535 m²on Royal York Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 06 105790 (Site Services to 10 Residential 6 semis/4 th's, 2006, status Inspection); 06 105653 (Construction of 6 semi detached houses( all new and same model) and 4 townhouses retain..., 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 32.0 m frontage≈ 57.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2006

    Needs a closer look

    Still open in the City's records: 06 105790 (Site Services to 10 Residential 6 semis/4 th's, 2006, status Inspection); 06 105653 (Construction of 6 semi detached houses( all new and same model) and 4 townhouses retain..., 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A365/06EYK (To construct 4, two and one-half storey townhouse units and 2, two and one-half storey..., 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Minor varianceA365/06EYKApproved

    To construct 4, two and one-half storey townhouse units and 2, two and one-half storey semi-detached dwellings fronting onto Royal York Road.

    Jul 13, 2006 · 515 ROYAL YORK RD
  • Building permit06 105790Inspection

    Site Services to 10 Residential 6 semis/4 th's

    May 15, 2006 · 515 ROYAL YORK RD
  • Building permit06 105653Inspectionnew building, new house

    Construction of 6 semi detached houses( all new and same model) and 4 townhouses retaining part of an existing heritage building and partial demolition on same site (4 units, 2 models units 5-8) - with common element (condo) access roadway

    May 12, 2006 · 515 ROYAL YORK RD
  • Zoning review05 124067 PSPClosed
    Apr 18, 2005 · 515 ROYAL YORK RD

Check before you build

  • Site-specific exception 900.6.10(16)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(16)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    City of Toronto by-law 440-2005.

By-law 569-2013, Chapter 900

Lot facts

Area
535 m²
Frontage
32 mestimated, irregular lot
Depth
57.5 mestimated, irregular lot
Street
Royal York Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone RM (x16) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
93%14 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
6

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a third storey front addition and a three-storey rear addition. The altered dwelling will be converted into a fourplex.

    530 ROYAL YORK RD · Nov 19, 2026 · 126 m away
  • Minor varianceApproved

    To modify the development standards outlined in By-law 1574-2025(OLT) in order to accomodate additional height, and an additional 86 rental dwelling units to the proposed apartment building.

    464 ROYAL YORK RD · Jul 16, 2026 · 265 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage, and a secondary suite.

    14 DISTIN AVE · Jan 15, 2026 · 363 m away
  • Minor varianceApproved

    To construct a second storey front platform, and a new deck in the rear yard.

    619 OXFORD ST · Jul 24, 2025 · 225 m away
  • Minor varianceApproved

    To construct a two storey rear addition, second storey side addition, and to construct a second secondary suite.

    544 ROYAL YORK RD · Nov 24, 2022 · 172 m away

Latest activity nearby

  • Minor varianceRefused

    To construct a third storey front addition and a three-storey rear addition. The altered dwelling will be converted into a fourplex.

    530 ROYAL YORK RD · Nov 19, 2026 · 126 m away
  • Building permit

    Interior alteration to an empty warehouse for the proposal of a commercial kitchen space to operate a commissary kitchen.

    15 SINCLAIR ST · Nov 18, 2026 · 190 m away
  • Building permit

    Revision 01 - Relocation of the universal washroom door;Addition of a raised platform within the salon and associated accessibility provisions;Revisions to architectural and structural drawings associated with the above changes; andMinor revisions to plumbing, HVAC and electrical drawings associated with the above changes.------------------------------------------------------------------------------------------Proposal for interior alterations for a tenant fit-up for a hair salon

    689 THE QUEENSWAY · Nov 18, 2026 · 298 m away
  • Zoning review

    Not Started

    732 THE QUEENSWAY · Nov 11, 2026 · 300 m away
  • Building permit

    To demolish existing rear detached garage and maintain parking pad

    530 ROYAL YORK RD · Nov 10, 2026 · 126 m away
  • Building permitsecondary suite

    Revision 01: to legalize an existing second dwelling unit. Proposal to certify existing rear basement entrance/walkout and adding a beam at main floor.

    615 OXFORD ST · Nov 6, 2026 · 241 m away
  • Building permit

    Proposal to install a backwater valve.

    22 PENHURST AVE · Nov 3, 2026 · 156 m away
  • Zoning review

    Notice Sent

    7 QUEEN ELIZABETH BLVD · Oct 23, 2026 · 119 m away
  • Zoning review

    Closed

    16 QUEEN ELIZABETH BLVD · Oct 20, 2026 · 248 m away
  • Zoning review

    Closed

    689 THE QUEENSWAY · Oct 13, 2026 · 298 m away

Neighbourhood: Stonegate-Queensway

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station13 min walk
Nearest TTC stop
Royal York Rd at Dalesford Rd1 min walk
Nearest cycling route
Royal York RdBike Lane, 1 min walk
Nearest traffic count
8,494 vehicles in 8 hDalesford Rd / Royal York Rd / Sinclair St, 80 m away, Sep 19, 2017
Serious collisions within 500 m
82021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Winslow - Dalesford Parkette3 min walk
Queensway Park7 min walk
Saunders Crescent Parkette7 min walk

Schools within 1 km

  • ST LOUIS CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
  • GEORGE R GAULD JR SCHOOL English Public 7 min walk
  • OAK LEARNERS Private 9 min walk
  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 10 min walk
  • BEHAVIOUR INNOVATIONS, CHILDREN'S COLLEGE Private 10 min walk
  • KAREN KAIN SCHOOL OF THE ARTS English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureStonegate-QueenswayMedian neighbourhood
Median household income (2020)$104,000$84,500
Households that own their home63%54%
Population (2021)25,65016,813
Homes built in 1960 or before55%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleStonegate-QueenswayCity median
Assault465.6636.3
Robbery40.869.5
Homicide3.45.3
Shootings13.610.5
Auto theft193.7192.6
Theft over $5,0006846.1
Break and enter217.5172.8
Theft from vehicles129.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.