HousePrecheckCheck an address

514 King St EToronto · zoning, lot size and permit records

Also 518 King St E, 520 King St E, 522 King St E, 524 King St E, 526 King St E

Commercial residential · CR 4.0 (c1.0; r3.5) SS2 (x340)18.4 × 56.7 m971 m²on St Lawrence Stcorner, also on King St E

Not a home

A commercial or mixed-use building

6 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 14 162372 (Proposal to construct a demising wall in unit #4 for future tenant fit-out in existing..., 2014, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 6 development applications open within 300 m, up to 55 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N20 m
18.4 m frontage56.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 162372 (Proposal to construct a demising wall in unit #4 for future tenant fit-out in existing..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Zoning review23 230355 LTOClosed
    Nov 28, 2023 · 514 KING ST E
  • Building permit20 178791Cancelled

    Proposal for interior renovations to unit E for a cannabis retail store.

    Aug 25, 2020 · 514 KING ST E
  • Building permit20 117152Closed

    To erect and display two illuminated wall signs displaying static copy. erected on southerly elevation of the first storey of the building.****DISTRICT DENTAL****

    Mar 11, 2020 · 514 KING ST E
  • Building permit19 133217Closed

    Proposal for interior alteration to unit C on the ground floor of the existing building to convert to physiotherapy clinic.

    Apr 18, 2019 · 514 KING ST E
  • Building permit15 257836Closed

    Convert the existing vacant space to office in Unit 4

    Dec 17, 2015 · 514 KING ST E
  • Building permit15 232195Closed

    HVAC - Proposed interior alterations to Unit E including alterations to life safety systems, plumbing and mechanical.

    Nov 5, 2015 · 514 KING ST E
  • Building permit14 162372Inspection

    Proposal to construct a demising wall in unit #4 for future tenant fit-out in existing retail unit.

    Jun 11, 2014 · 514 KING ST E
  • Building permit14 113187Closed

    Proposal to add two demising walls to create a Unit F on existing property at 514 King St E.

    Feb 20, 2014 · 514 KING ST E

Check before you build

  • Site-specific exception 900.11.10(340)

    Needs a closer look

    7 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(340)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900.11.10(2)

  2. Rule B

    A dwelling unit in a lawfully existing detached house , semi-detached house , duplex , triplex , fourplex or townhouse in Policy Area 1 on a lot in the CR zone is permitted on that lot and any addition to those lawfully existing buildings must comply with the requirements for the respective building type in the RM zone and the RT zone in the case of a townhouse, or be authorized by a Section 45 Planning Act minor variance

  3. Rule C

    If a lot with a building is identified as a heritage site , any portion of a building that exceeds the height of the conserved heritage building , whether an addition above the conserved heritage building or as a separate building on the same lot , must be set back from a lot line that abuts a street a distance equal to the original building setback of the conserved heritage building from that lot line that abuts a street , plus 5.0 metres.

  4. Rule D

    Despite regulation 40.10.40.10(5), if a lot is abutting a lot with a building identified as a heritage site fronting on the same street , the height of the first storey may be less than 4.5 metres provided it is no less than 3.7 metres.

  5. Rule E

    Despite regulation 40.10.40.70(2)(A), a building or structure must be set back a minimum of 3.0 metres from a lot line adjacent to a street , except on any portion of a lawfully existing building identified as a heritage site .

  6. Rule F

    Despite regulation 40.10.40.70(2)(D) and (E): (i) if a lot abuts a lot in the O, ON or OR zone or the Residential Zone category or Residential Apartment zone, no building or structure may penetrate a 45 degree angular plane projected over the lot along the entire rear lot line , starting at a height of 10.5 metres above the average elevation of the ground along the rear lot line ; or (ii) if a lot is separated from a lot in the O, ON or OR zone or the Residential Zone category by a lane , no building or structure may penetrate a 45 degree angular plane projected over the lot , starting at a height of 10.5 metres above the average elevation of the ground along the entire rear lot line of the lot abutting the lane on the opposite side of the lane .

  7. Rule G

    A building or structure must be set back a minimum of 5.0 metres from an elevated roadway structure.

  8. Older by-law A

    Section 12 (2) 270 (a) of former City of Toronto By-law 438-86

5 parts for other addresses
  • B On lands known municipally in the year 2000 as 476, 480 and 490 King Street East, City of Toronto By-law 822-2001
  • C On 510, 512 and 530 King Street East, City of Toronto By-law 576-2009
  • D On 549 King Street East and 33 Sumach Street, By-law 289-2009
  • E On 569 King Street East, By-law 289-2009
  • F On 573 King Street East, By-law 384-2020.
By-law 569-2013, Chapter 900

Lot facts

Area
971 m²
Frontage
18.4 m
Depth
56.7 m
Street
St Lawrence St
Corner lot
Yes, also on King St E56.7 m along it
Public lane
None
House footprint
442 m²
Back yard
10.3 mhouse to rear lot line
Side yards
0.3 m and 5.2 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
25 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • King-Parliament Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: King Street East. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c1.0; r3.5) SS2 (x340) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
84%21 of 25 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
4
Development applications
12

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 25 variance decisions: more than at 57% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 198 m away
  • Minor varianceApproved

    The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 464 m away
  • Minor varianceApproved

    The existing undersized public parking lot will be maintained and unaltered.

    4 GILEAD PL · Sep 9, 2026 · 464 m away
  • Minor varianceRefused

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    45 BASEBALL PL · May 13, 2026 · 498 m away
  • Minor varianceApproved

    To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

    14 EASTERN AVE · May 6, 2026 · 480 m away

Latest activity nearby

  • Building permit

    Proposal to add new washrooms on ground floor and second floor, finish basement, and interior alteration to add load bearing beams in basement and on ground floor.

    13 BRIGHT ST · Nov 24, 2026 · 205 m away
  • Building permit

    PROPOSED NEW DETACHED GARAGE

    60 WASCANA AVE · Nov 23, 2026 · 198 m away
  • Building permit

    PROPOSED ALTERATIONS TO SECOND FLOOR

    491 QUEEN ST E · Nov 17, 2026 · 105 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 23, 2026 · 232 m away
  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 198 m away
  • Zoning review

    Notice Sent

    534 QUEEN ST E · Oct 13, 2026 · 108 m away
  • Building permit

    Proposed basement finishing, including new bathroom

    12 BRIGHT ST · Oct 7, 2026 · 232 m away
  • Development application

    Lift the (H)

    1 SUMACH ST · Sep 18, 2026 · 228 m away · City file
  • Building permit

    Proposal to replace deteriorating brick facade of existing dwelling

    6 WASCANA AVE · Aug 19, 2026 · 208 m away
  • Building permit

    Proposed interior alteations for removing raised floor and constructing a new floor with higher ceiling height. 2 Washroom renovation & kitchen.

    90 SUMACH ST · Jul 3, 2026 · 248 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station30 min walk
Nearest TTC stop
King St East at Lower River St1 min walk
Nearest cycling route
River StCycle Track, 1 min walk
Nearest traffic count
6,010 vehicles in 14 hKing St E / St Lawrence St, 20 m away, Sep 16, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 1 with cyclists
Parks
King/Queen Triangle1 min walk
Corktown Common2 min walk
Underpass Park2 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 6 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 6 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 10 min walk
  • LIBERTY PREP SCHOOL Private 10 min walk
  • VOICE INTEGRATIVE PRIVATE SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.