Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register2 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 172115 000 00 IR (Adequate Heat, 2026); 26 172114 000 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations23 development applications open within 300 m
Good to know23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 96 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2024 (3 storeys, 16 units, built 1888).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- By-law investigation26 172115 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 510 JARVIS ST - By-law investigation26 172114 000 00 IRClosed
Property Standards
Jun 1, 2026 · 510 JARVIS ST - Building permit01 145688Closed
rebuild platform with roof over on south elevation (side). edc
Jun 18, 2001 · 510 JARVIS ST
Check before you build
Site-specific exception 900.2.10(644)
Needs a closer look2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
The minimum front yard setback is 6.0 metres.
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 816 m²
- Frontage
- 17.9 m
- Depth
- 45.9 m
- Street
- Jarvis St
- Corner lot
- No
- Public lane
- None
- House footprint
- 394 m²roof up to 28.9 m
- Back yard
- 5.5 mhouse to rear lot line
- Side yards
- 0.6 m and 2.3 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 13 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d1.0) (x644) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 91%10 of 11 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 7
- Development applications
- 31
Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 325 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 194 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
50 EARL ST · Dec 4, 2020 · 325 m away - Minor varianceApproved
To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.
66 GLOUCESTER ST · Oct 8, 2020 · 245 m away - Minor varianceApproved
To alter the existing seven-storey institutional building by constructing two ground level rear canopies.
30 ISABELLA ST · Dec 4, 2019 · 413 m away
Latest activity nearby
- Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 169 m away - Zoning review
Cancelled
584 CHURCH ST · Sep 22, 2026 · 209 m away - Zoning review
Closed
137 ISABELLA ST · Aug 24, 2026 · 272 m away - Building permit
Proposal to demolish the existing detached dwelling with 2 units.See 24 216579 STE 13 SA for future development
5 HUNTLEY ST · Aug 7, 2026 · 182 m away - Building permit
REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.
109 GLOUCESTER ST · Jul 24, 2026 · 34 m away - Zoning review
Closed
66 WELLESLEY ST E · Jul 14, 2026 · 261 m away - Zoning review
Closed
25 LOURDES LANE · Jun 19, 2026 · 271 m away - Building permit
Proposed temporary event structures for Green Space Festival 2026. The build date is on June 22, 2026 and the dismantle date is on June 29, 2026.
519 CHURCH ST · Jun 18, 2026 · 169 m away - Zoning review
Closed
10 HUNTLEY ST · Jun 2, 2026 · 150 m away - Building permit
Proposal to replace existing stairwell railings.
100 WELLESLEY ST E · Jun 1, 2026 · 105 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station7 min walk
- Nearest TTC stop
- Wellesley St East at Jarvis St2 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 2 min walk
- Nearest traffic count
- 8,530 vehicles in 8 hJarvis St / Earl Pl / Gloucester St, 50 m away, Dec 10, 2022
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 1 with cyclists
- Parks
- Barbara Hall Park1 min walk
- Wellesley - Magill Park4 min walk
- Charles Street Parkette4 min walk
Schools within 1 km
- THE ABELARD CENTRE FOR EDUCATION Private 3 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 3 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 5 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 6 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.