HousePrecheckCheck an address

51 Panorama CrtToronto · zoning, lot size and permit records

Also 11 Farr Ave

Institutional · I (x67)≈ 372.6 × 851.1 m196,876 m²on Farr Avecorner, also on Panorama Crt

Not a home

An institution

The zoning by-law sets this parcel aside for an institution. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An institutionVisitors, traffic and parking in its busy hours.
  • Permits or applications open on this parcelRecent records on this lot: 24 246205 (Building #4 - Proposal for Demolition of nineteen buildings, including ten residence st..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Mount OliveThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 372.6 m frontage≈ 851.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • TRCA regulated area (58% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (48% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Rowntree Mill Swamp

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • Building permit open since 2010

    Needs a closer look

    Still open in the City's records: 10 220084 (To install a new 150 mm PVC watermain service, 2010, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (53% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 246205 (Building #4 - Proposal for Demolition of nineteen buildings, including ten residence st..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A102/02E (To legalize and to maintain the existing group home located in Unit/Cottage 19 at the T..., 2002).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

30 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 246336Closeddemolition

    Building #15 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Mar 3, 2025 · 51 PANORAMA CRT
  • Building permit24 246357Closeddemolition

    Building #18 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 28, 2025 · 51 PANORAMA CRT
  • Building permit24 246347Closeddemolition

    Building #17 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 28, 2025 · 51 PANORAMA CRT
  • Building permit24 246343Closeddemolition

    Building #16 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 28, 2025 · 51 PANORAMA CRT
  • Building permit24 246221Closeddemolition

    Building #7 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 28, 2025 · 51 PANORAMA CRT
  • Building permit24 246238Closeddemolition

    Building #11 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 27, 2025 · 51 PANORAMA CRT
  • Building permit24 246225Closeddemolition

    Building #8 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 27, 2025 · 51 PANORAMA CRT
  • Building permit24 246325Closeddemolition

    Building #13 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 26, 2025 · 51 PANORAMA CRT
Show 22 older records
  • Building permit24 246240Closeddemolition

    Building #12 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 26, 2025 · 51 PANORAMA CRT
  • Building permit24 246360Closeddemolition

    Building #19 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246333Closeddemolition

    Building #14 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246230Closeddemolition

    Building #10 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246228Closeddemolition

    Building #9 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246218Closeddemolition

    Building #6 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246213Closeddemolition

    Building #5 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246205Inspectiondemolition

    Building #4 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246197Closeddemolition

    Building #3 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 246194Closeddemolition

    Building #2 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit24 213025Closeddemolition

    Building #1 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    Feb 24, 2025 · 51 PANORAMA CRT
  • Building permit11 137448Closed

    Proposal to install two backflow prevention devices.

    Mar 14, 2011 · 51 PANORAMA CRT
  • Building permit10 220084Inspection

    To install a new 150 mm PVC watermain service.

    Jul 19, 2010 · 51 PANORAMA CRT
  • Building permit09 189570Closed

    Removal of an existing rooftop wooden storage shed, replace roof membrane to an office building for Ministry of Children and Youth Services maintenance building. revision to construct a new deck on roof

    Jan 27, 2010 · 51 PANORAMA CRT
  • Building permit04 135598Cancelled

    2 new mag locks to exist. group home

    May 17, 2004 · 51 PANORAMA CRT
  • Building permit03 160678Closed - Dormant

    Replacement of 118 windows in elementary school

    Aug 29, 2003 · 51 PANORAMA CRT
  • Building permit00 140023Closed

    Interior alterations to group home. HVAC & Plumbing included. UNIT 19

    May 2, 2003 · 51 PANORAMA CRT
  • Minor varianceA102/02EApproved

    To legalize and to maintain the existing group home located in Unit/Cottage 19 at the Thistletown Regional Centre.

    May 16, 2002 · 51 PANORAMA CRT
  • Building permit01 100026Closed

    Upgrade to mechanical room for pool. HVAC included.

    Jan 30, 2001 · 51 PANORAMA CRT
  • Building permit00 361146Closed

    New balcony railings to institutional building.

    Dec 22, 2000 · 51 PANORAMA CRT
  • Building permit00 146706Closed

    Mezzanine addition and interior alterations to government building. HVAC permit included. Plumbing drawings to follow

    Jul 18, 2000 · 51 PANORAMA CRT
  • Building permit99 116689Closed

    Balcony repairs, railing and canopy to an apartment building.

    Feb 11, 2000 · 51 PANORAMA CRT

Check before you build

  • Site-specific exception 900.30.10(67)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.30.10(67)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The only use permitted on the lands covered by this exception is a detention facility operated by the Government of Canada or the Province of Ontario.

By-law 569-2013, Chapter 900

Lot facts

Area
196,876 m²
Frontage
372.6 mestimated, irregular lot
Depth
851.1 mestimated, irregular lot
Street
Farr Ave
Corner lot
Yes, also on Panorama Crt851.1 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
  • Zone I (x67) (Institutional). Chapter 80, section 80.10 of the by-law. Source
  • 81 City trees in front of this lot. The City's street tree inventory lists 81 trees at this address: spruce, norway (39 cm), spruce, norway (35 cm), pine scots (32 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to constuct new front porch and interior alterations to an existing 1 storey SFD-detached dwelling. See also 25 206556 ZAP.

    31 TAYSHAM CRES · Nov 27, 2025 · 247 m away
  • Building permitsecondary suite

    Proposal for interior alterations to convert basement to secondary suite

    55 TAYSHAM CRES · Nov 18, 2025 · 192 m away
  • Zoning review

    Application On Hold

    31 TAYSHAM CRES · Aug 7, 2025 · 247 m away
  • Building permitdemolition

    Building #15 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Mar 3, 2025 · 225 m away
  • Building permitdemolition

    Building #18 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 225 m away
  • Building permitdemolition

    Building #17 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 225 m away
  • Building permitdemolition

    Building #16 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 225 m away
  • Building permitdemolition

    Building #7 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 225 m away
  • Building permitdemolition

    Building #11 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 225 m away
  • Building permitdemolition

    Building #8 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 225 m away

Neighbourhood: Mount Olive-Silverstone-Jamestown

About the area around the lot, not the lot itself.

Nearest station
Rowntree Mills Station7 min walk
Nearest TTC stop
Finch Ave West and Islington Ave7 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 4 min walk
Nearest traffic count
1,425 vehicles in 14 hAmaron Ave / Monterrey Dr, 380 m away, Nov 25, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Rowntree Mills Park2 min walk
Finch - Islington Park4 min walk
Panorama Park6 min walk

Schools within 1 km

  • BEAUMONDE HEIGHTS JR MDL SCHOOL English Public 6 min walk
  • ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
  • NORTH ALBION COLLEGIATE INSTITUTE English Public 14 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 15 min walk
  • ALBION LINC English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Olive-Silverstone-JamestownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home46%54%
Population (2021)31,34516,813
Homes built in 1960 or before14%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Olive-Silverstone-JamestownCity median
Assault788.6636.3
Robbery107.369.5
Homicide2.95.3
Shootings20.310.5
Auto theft275.4192.6
Theft over $5,00026.146.1
Break and enter55.1172.8
Theft from vehicles130.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.