HousePrecheckCheck an address

51 Claireville DrToronto · zoning, lot size and permit records

Employment · E 1.036.6 × 228.8 m7,838 m²on Claireville Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
36.6 m frontage228.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (17% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (15% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (29% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Zoning review09 125619 ZPRClosed
    Apr 14, 2009 · 51 CLAIREVILLE DR
  • Zoning review07 257569 ZPRClosed
    Aug 29, 2007 · 51 CLAIREVILLE DR

Lot facts

Area
7,838 m²
Frontage
36.6 m
Depth
228.8 m
Street
Claireville Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust (33 cm), honey locust (29 cm), honey locust (24 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To create 17 additional parking spaces located at the front of the existing building.

    41 CLAIREVILLE DR · Aug 1, 2024 · 114 m away
  • Minor varianceApproved

    To permit a parking deficiency for a Software Development and Processing use.

    310 HUMBERLINE DR · Nov 22, 2018 · 455 m away

Latest activity nearby

  • Building permit

    Proposed installation of spray paint booth, prep.station, mixing room and makeup air unit, no other changes to the building.(USE = Vehicle Repair Shop)

    41 CLAIREVILLE DR · May 28, 2026 · 114 m away
  • Building permit

    Proposal to replace 2 overhead doors with larger ones, with associated structural work. For tenant (HERC Rentals)

    35 CLAIREVILLE DR · Nov 14, 2025 · 237 m away
  • Minor varianceApproved

    To create 17 additional parking spaces located at the front of the existing building.

    41 CLAIREVILLE DR · Aug 1, 2024 · 114 m away
  • Building permit

    Installation of one 80'x220' temporary tent for a dining tent. Tent will be staked into the ground. Installation to begin June 28th And removal is scheduled for July 28th.

    61 CLAIREVILLE DR · Jul 22, 2024 · 143 m away
  • Zoning review

    Closed

    41 CLAIREVILLE DR · Dec 6, 2023 · 114 m away
  • Building permit

    Proposed installation of 2 temporary tents (20m x 20m clearspan - cert #14-219337 & 30m x 35m Losberger) at BAPS Shri Swarminarayan Mandir anchored with stakes for Diwali. Installation proposed for Nov 3, 2023 and removeal will begin on Nov 16, 2023.

    61 CLAIREVILLE DR · Nov 14, 2023 · 143 m away
  • Zoning review

    Closed

    61 CLAIREVILLE DR · Sep 12, 2023 · 143 m away
  • Building permit

    Install various temporary tents at BAPS Shri Swaminarayan Mandir for religious ceremony from May 8th, 2023 to July 13th 2023

    61 CLAIREVILLE DR · May 12, 2023 · 143 m away
  • Building permit

    Installation of 25Mx50M Clearspan (CERT #14-219388) + 25Mx40M Clearspan (CERT #14-219388) + 20'x40' Frame tent (all anchored using stakes) for Diwali at BAPS Etobicoke. Installation on Oct 11, 2022 and removal on Oct 26, 2022

    61 CLAIREVILLE DR · Oct 14, 2022 · 143 m away
  • Building permit

    Proposed repair of water related damages

    30 CLAIREVILLE DR · Oct 28, 2020 · 267 m away

Neighbourhood: West Humber-Clairville

About the area around the lot, not the lot itself.

Nearest station
Westmore Station32 min walk
Nearest TTC stop
Opposite 90 Claireville Dr2 min walk
Nearest cycling route
West Humber TrlMulti-Use Trail, 4 min walk
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Trca Lands ( 1)1 min walk
Claireville Conservation Area5 min walk
Humber Arboretum6 min walk

2021 Census

FigureWest Humber-ClairvilleMedian neighbourhood
Median household income (2020)$92,000$84,500
Households that own their home65%54%
Population (2021)33,30016,813
Homes built in 1960 or before13%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Humber-ClairvilleCity median
Assault933636.3
Robbery152.469.5
Homicide2.75.3
Shootings26.710.5
Auto theft1320.6192.6
Theft over $5,000245.946.1
Break and enter347.5172.8
Theft from vehicles545.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.