Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register8 building permits open, the oldest since 2000
Needs a closer lookStill open in the City's records: 19 158611 (Proposal for interior alterations to an office space on the 14th floor, 2019, status Permit Issued); 15 135360 (Proposal to install electromagnetic locks on 19th & 20th floors of existing office buil..., 2015, status Inspection); 14 266619 (Proposal for interior alterations to existing office space on the 19th and 20th floors..., 2015, status Inspection); and 5 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 196370 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 170067 (Proposed Install new cooling-only heat pump split system with 5 ceiling cassette units,..., 2026); 25 198222 (Alteration of partition walls to add one-way viewing windows into conference room for n..., 2025); 24 118172 STE 11 OZ (Official Plan Amendment application to permit a 64-storey mixed-use building, containin..., 2024); and 2 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0454/07TEY (To convert a portion of the 13th Floor mechanical space to office space, 2007).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
73 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review22 198152 PRZNot StartedOct 7, 2026 · 505 UNIVERSITY AVE
- Building permit26 170067Permit Issued
Proposed Install new cooling-only heat pump split system with 5 ceiling cassette units, 1 branch controller, and 1 condensing unit
Aug 26, 2026 · 505 UNIVERSITY AVE - Building permit25 219754Cancelled
Proposal to demolish existing office building and replace with a mixed use building.
Sep 3, 2025 · 505 UNIVERSITY AVE - Building permit25 206618Closed
Proposal to add glazed partitions and doors for mag locks to 6th, 8th and 9th elevator lobby. See permit 25 197025 FSU 00 FS
Aug 29, 2025 · 505 UNIVERSITY AVE - Building permit25 198222Permit Issued
Alteration of partition walls to add one-way viewing windows into conference room for new AV control workstations; Electrical alterations for new workstations
Aug 15, 2025 · 505 UNIVERSITY AVE - Building permit25 197025Closed
Proposal to add glazed partitions, doors, and mag locks at 6th, 8th, & 9th elevator lobby.Separate permit will be applied for other work than Mag lock. See permit 25 206618 BLD 00 BA for glazed partitions and doors.
Aug 8, 2025 · 505 UNIVERSITY AVE - By-law investigation25 196370 PRS 00 IRClosed
Property Standards
Jul 18, 2025 · 505 UNIVERSITY AVE - Development application24 118172 STE 11 OZOMB Approved
Official Plan Amendment application to permit a 64-storey mixed-use building, containing 704 dwelling units, 25,100 square metres of office and 600 square metres of retail gross floor area. A concurrent Zoning Amendment application for the same development has also previously been submitted and is under Appeal.
Feb 23, 2024 · 505 UNIVERSITY AVE · City file
Show 65 older records
- Building permit22 217216Closed
HVAC - interior alterations to existing office 7th floor "CBRE"
Nov 16, 2022 · 505 UNIVERSITY AVE - Development application22 198152 STE 11 OZOMB Approved
Zoning By-law Amendment application to permit a 64-storey mixed-use building, containing 704 dwelling units, 25,100 square metres of office and 600 square metres of retail gross floor area.
Aug 31, 2022 · 505 UNIVERSITY AVE · City file - Development application22 198151 STE 11 SAUnder Review
The redevelopment proposes a 64-storey mixed-use building with a 12-storey office podium and is inclusive of four levels of below-grade parking with a total of 171 parking spaces. The redevelopment proposes 704 dwelling units, resulting in a total residential gross floor area (GFA) of 46,683 sq. m., a total of 24,919 sq. m. of office GFA, and a total of 460 sq. m of retail GFA which results in a total Floor Space Index (FSI) of 21.65, pursuant to GFA calculations under By-law 569-2013.
Aug 31, 2022 · 505 UNIVERSITY AVE · City file - Building permit19 158611Permit Issued
Proposal for interior alterations to an office space on the 14th floor
May 31, 2019 · 505 UNIVERSITY AVE - Building permit18 268786Closed
Proposed electromagnetic locks on 7th floor.
Dec 18, 2018 · 505 UNIVERSITY AVE - Building permit18 137342Closed
In conjunction with a one storey building on the premises, proposal to erect and display two illuminated wall signs displaying static copy, located on the south and west elevations. The proposed signs are 0.87 metres vertically by 9.14 metres horizontally at a height of 4.07 metres above grade.*****THE PRINTING HOUSE*****
May 29, 2018 · 505 UNIVERSITY AVE - Building permit18 129276Closed
Proposal for interior alterations to office space on 7th floor. Tenant- CBRE Limited
Apr 9, 2018 · 505 UNIVERSITY AVE - Building permit18 114169Closed
Plumbing - Proposal for interior alterations to existing retail space "The Printing House"
Mar 7, 2018 · 505 UNIVERSITY AVE - Building permit17 278203Closed
HVAC - Proposal for interior aterations to existing office space on floors 10 and 11 - Infrastructure Ontario
Jan 24, 2018 · 505 UNIVERSITY AVE - Zoning review17 258167 ZSVClosedNov 6, 2017 · 505 UNIVERSITY AVE
- Building permit16 243137Closed
HVAC - Proposal for interior alterations tot he 8th floor of the existing office building. The scope of work includes demo and construction of partitions, new finishes and HVAC.
Nov 23, 2016 · 505 UNIVERSITY AVE - Building permit15 135360Inspection
Proposal to install electromagnetic locks on 19th & 20th floors of existing office building.
Apr 30, 2015 · 505 UNIVERSITY AVE - Building permit14 266619Inspection
Proposal for interior alterations to existing office space on the 19th and 20th floors - Ministry of Labour
Jan 21, 2015 · 505 UNIVERSITY AVE - Building permit10 312235Closed
Proposal to replace 1 chiller in eisting office building.
Dec 16, 2010 · 505 UNIVERSITY AVE - Building permit10 297542Inspection
permit for 2 maglocks on ground floor of existing office space.
Dec 1, 2010 · 505 UNIVERSITY AVE - Building permit10 256887Closed
Proposal to install one back flow prevention device to main line. Building comprised of offices.
Sep 22, 2010 · 505 UNIVERSITY AVE - Building permit09 170917Closed
Replacement of existing fire alarm control equipment. Major control panels on 3rd, 11th and 18th floor.
Sep 23, 2009 · 505 UNIVERSITY AVE - Building permit09 125657Closed
Minor interior alterations to exsting office space on the 20th floor.
Apr 16, 2009 · 505 UNIVERSITY AVE - Building permit09 109069Inspection
Proposal for the installation of one(1) maglock on the 14th floor for tenant "Cancer Care Ontario"
Mar 6, 2009 · 505 UNIVERSITY AVE - Building permit08 172308Closed - Dormant
HVAC - Interior alterations to existing office space - floor 14 - Cancer Care Ontario
Jul 11, 2008 · 505 UNIVERSITY AVE - Building permit07 287827Closed - Dormant
HVAC - Make interior alterations to office.
Dec 31, 2007 · 505 UNIVERSITY AVE - Building permit07 282565Closed
Sprinkler shop drawings for existing Interior alterations.
Dec 18, 2007 · 505 UNIVERSITY AVE - Building permit07 277765Closed - Dormant
HVAC - Interior alterations to portion of existing office on 16th floor. Phase 2. Single tenant Floor.
Nov 21, 2007 · 505 UNIVERSITY AVE - Building permit07 274407Closed
Install maglock on office floor.
Nov 15, 2007 · 505 UNIVERSITY AVE - Building permit07 260246Closed - Dormant
HVAC - Int alterations to office on 16th floor
Sep 17, 2007 · 505 UNIVERSITY AVE - Building permit07 213711Closed - Dormant
Interior alterations to existing office space - floor 13 - Cancer Care Ontario
Aug 2, 2007 · 505 UNIVERSITY AVE - Minor varianceA0454/07TEYApproved
To convert a portion of the 13th Floor mechanical space to office space.
Jul 4, 2007 · 505 UNIVERSITY AVE - Building permit07 213853Closed - Dormant
Plumbing - Interior Alterations to existing office space - floor 15 - Cancer Care Ontario
May 16, 2007 · 505 UNIVERSITY AVE - Building permit07 115210Inspection
Make interior alterations to second floor office on single tenant floor.
Mar 22, 2007 · 505 UNIVERSITY AVE - Building permit07 108742Closed - Dormant
Make interior alterations to single tenant office floor.
Mar 19, 2007 · 505 UNIVERSITY AVE - Building permit06 180764Closed - Dormant
HVAC - alterations to 19th and 20th floor
Oct 10, 2006 · 505 UNIVERSITY AVE - Building permit06 178800Inspection
Interior alterations to entire existing Office on 18th floor . New WC's Single Tenant Floor.
Oct 10, 2006 · 505 UNIVERSITY AVE - Building permit06 131868Closed
Interior alterations to existing office on the 17th floor.
May 12, 2006 · 505 UNIVERSITY AVE - Building permit06 107707Closed - Dormant
Install roof top makeup air unit with exhaust fan in connection with #05-198648 BLD & HVA.
Feb 13, 2006 · 505 UNIVERSITY AVE - Zoning review05 211352 LTOClosedDec 21, 2005 · 505 UNIVERSITY AVE
- Building permit05 198648Closed
Interior alterations to existing restaurant on ground floor. Renovate counter & kitchen areas, new & relocated plumbing fixtures, new grease interceptor, new kitchen exhaust.
Dec 21, 2005 · 505 UNIVERSITY AVE - Zoning review05 192748 ZSVClosedOct 12, 2005 · 505 UNIVERSITY AVE
- Zoning review05 178969 ZPRClosedSep 9, 2005 · 505 UNIVERSITY AVE
- Building permit03 103331Closed - Dormant
install 2 mag locks on 5th floor
Jan 27, 2003 · 505 UNIVERSITY AVE - Building permit02 192662Closed - Dormant
relocate 1 ks on 8th floor
Dec 5, 2002 · 505 UNIVERSITY AVE - Building permit02 143241Closed
make interior alterations by installing partitions on 15th, 17th and 18th floor existing offices. tenant: immigration refugee board.
Jun 19, 2002 · 505 UNIVERSITY AVE - Building permit02 122328Closed - Dormant
Install 2 maglocks on the seventh floor.
Mar 28, 2002 · 505 UNIVERSITY AVE - Building permit02 119358Closed
make interior alterations to portion of 7th floor tenant: wsiat
Mar 21, 2002 · 505 UNIVERSITY AVE - Building permit01 169453Closed
install fixtures on 6th floor- 1 k.s., 1 slop sink.. tenant: WSIAT see bp#01-169447
Aug 29, 2001 · 505 UNIVERSITY AVE - Building permit01 169447Closed
install paritions on 6th floor. tenant: WSIAT
Aug 28, 2001 · 505 UNIVERSITY AVE - Building permit00 324179Closed
Install 1-1/2" waste pipe to the 8th floor and portion of 9th floor ;also 1-2comp.ks on 8th fl & 1-2comp.ks on 9th fl; also remove 1 drinking fountain & 1 janitor sink ( office use). See Plans.Tenant: Workplace Safety & Insurance Appeal office. (w24) Cost included in BP00324164.
Oct 16, 2000 · 505 UNIVERSITY AVE - Building permit00 324164Closed
install partitions on all of the 8th floor and portion of 9th floor for office use. Tenant: Workplace Safety & Insurance Appeal office. (w24)
Sep 21, 2000 · 505 UNIVERSITY AVE - Building permit00 324173Closed - Dormant
Install HVAC ductwork on all of the 8th floor and portion of 9th floor for office use. Tenant: Workplace Safety & Insurance Appeal office. (w24) Cost included in BP00324164.
Sep 14, 2000 · 505 UNIVERSITY AVE - Building permit00 176064Closed
install fixtures -replace 3 washbasins in washrooms, add 1 new 1-comp.kit.sink on the 15th floor for office use (no plans). Tenant: nortel networks. (w24) Cost included in BP00176062
Aug 23, 2000 · 505 UNIVERSITY AVE - Building permit00 176062Closed
install partitions on the 15th floor for office use. Tenant: nortel networks. (w24)
Aug 18, 2000 · 505 UNIVERSITY AVE - Building permit00 173290Closed
Install fixtures on 13th floor office: 1 kitchen sink, 4 w.b. cost incl. 00 - 173248
Jul 20, 2000 · 505 UNIVERSITY AVE - Building permit00 173248Closed
Make alterations to 13th floor of existing office for new tenant Nortel Networks
Jul 20, 2000 · 505 UNIVERSITY AVE - Building permit00 162030Inspection
Alterations to existing retail occupancy- ground floor
Jun 15, 2000 · 505 UNIVERSITY AVE - Building permit00 149894Closed
Installation of telecommunications equipment in existing room- basement floor area
May 11, 2000 · 505 UNIVERSITY AVE - Building permit00 138070Closed
Install fixtures: 17th floor: 2 kitchen sinks cost incl. 00138062 Tenant: Nortec Networks
Apr 13, 2000 · 505 UNIVERSITY AVE - Building permit00 138062Closed
Install partitions on the 17th floor and a portion of the 19th floor office. Tenant: Nortec Networks
Apr 7, 2000 · 505 UNIVERSITY AVE - Building permit00 126793Closed
make interior alterations to portion of 9th floor existing office. tenant: Wsiat. edc *** This floor shall be restricted to be used by a single tenant only ***
Feb 28, 2000 · 505 UNIVERSITY AVE - Building permit00 120215Closed
make interior alterations to portion of 16th floor existing office. tenant: financial planners standard council.
Jan 13, 2000 · 505 UNIVERSITY AVE - Building permit99 015447Closed
ERECT PARTITIONS ON PORTION OF 16TH FLOOR TENANT:PROPERTY SERVICES SS
May 13, 1999 · 505 UNIVERSITY AVE - Building permit99 013434Closed
INSTALL FIXTURE ON 18TH FLOOR OFFICE: 1 KITCHEN SINK /LM
Feb 17, 1999 · 505 UNIVERSITY AVE - Building permit98 020068Closed
H.V.A.C. ALTER DUCTWORK ON 2ND, 3RD, 4TH, 5TH, 10TH, 11TH AND 12TH FLOOR EXISTING OFFICES FOR NEW TENANT. REFER TO APPLICATION NUMBER: 415663 COST INCLUDED EDC
Oct 1, 1998 · 505 UNIVERSITY AVE - Building permit98 020065Closed
INSTALL ON 2ND FLOOR: 1 W.C., 1 W.B., 1 BAR SINK, ON 4TH FLOOR: 1 W.C., 1 W.B., 1 BAR SINK, ON 5TH FLOOR: 1 W.C., 1 W.B., 1 BAR SINK, 1 DRINKING FOUNTAIN, ON 11TH FLOOR: 1 K.S., SEE 415663 TENANT: ONTARIO LABOUR RELATIONS BOARD. COST INCLUDED EDC
Oct 1, 1998 · 505 UNIVERSITY AVE - Building permit98 020064Closed
MAKE INTERIOR ALTERATIONS TO 2ND, 3RD, 4TH, 5TH, 10TH, 11TH AND 12TH FLOOR EXISTING OFFICE FOR NEW TENANT. TENANT; ONTARIO LABOUR RELATIONS BOARD EDC
Oct 1, 1998 · 505 UNIVERSITY AVE - Building permit98 015751Closed
INSTALL PLUMBING FIXTURES ON PORTION OF 14TH FL.1-1COMP.KS FOR OFFICE. TENANT: PAIRO REFER TO APPLICATION NUMBER: 411335 COST INCLUDED (W24)/SP (NO PLANS)
May 12, 1998 · 505 UNIVERSITY AVE - Zoning review95 025804 LTOClosedNov 8, 1995 · 505 UNIVERSITY AVE
Check before you build
Site-specific exception 900.11.10(2197)
Needs a closer look1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On a lot , public parking as a principal use in a building or structure is not permitted. [TO: 438-86; 12(2) 132]
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 256 of former City of Toronto By-law 438-86
- Older by-law C
City of Toronto by-law 593-06
1 part for other addresses
- D On 525 University Ave., former City of Toronto by-law 367-84.
Lot facts
- Area
- 3,287 m²
- Frontage
- 48.2 m
- Depth
- 68.9 m
- Street
- University Ave
- Corner lot
- Yes, also on Edward St68.9 m along it
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- 76 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 7.8 (c4.5; r7.8) SS1 (x2197) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 8 City trees in front of this lot. The City's street tree inventory lists 8 trees at this address: ginkgo (13 cm), ginkgo (13 cm), yew (12 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 90%9 of 10 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 27
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the parking length standard for one residential parking space (Unit 11) on Parking Level 1 of the 32-storey mixed-use building, containing three levels of below grade parking.
292 DUNDAS ST W · Mar 4, 2026 · 299 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 588-2025) for a new 15-storey mixed-use building (East Block fronting Bay Street), by increasing the podium portions of the building heights, equipment height projections, and reducing the minimum height of the first storey. Also, the new 43-storey mixed-use building (West Block fronting Elizabeth Street) will be reducing the size of one parking space length. This is currently being reviewed under Site Plan Control (File Number 20 25 197844 STE 11 SA). There will be a total of 827 purpose-built rental units on this lot (617 residential dwelling units, and 210 affordable dwelling units).
130 ELIZABETH ST · Jan 14, 2026 · 174 m away - Minor varianceApproved
To convert the existing three-storey mixed-use building (containing four residential dwelling units and non-residential uses within the basement and on the ground floor) into a hotel building (containing 10 units). There will be non-residential uses on the ground level with an outdoor patio, and a second level terrace.
168 MC CAUL ST · Oct 23, 2024 · 350 m away - Minor varianceApproved
To construct a new 12-storey mixed-use building with a total of 30 residential dwelling units and two non-residential (commercial) units on this lot. The property owner will be undergoing a Site Plan Control application.
203 DUNDAS ST W · Oct 16, 2024 · 131 m away - Minor varianceApproved
To alter the development standards for a 32-storey mixed-use building (as approved under Site Specific Zoning By-laws 441-2021 and 442-2021 (LPAT), and By-Laws 438-86 and 569-2013), to increase the gross floor area, the building height, and the mechanical equipment area, as well as to reduce the outdoor amenity space and width of bicycle parking spaces.
292 DUNDAS ST W · Dec 13, 2023 · 299 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two lots and to create new easements/rights-of-way.
123 EDWARD ST · Oct 2, 2027 · 97 m away - Zoning review
Application On Hold
522 UNIVERSITY AVE · Nov 24, 2026 · 116 m away - Building permit
Proposal for interior alterations to existing office suite. To include HVAC, sprinkler alterations.
393 UNIVERSITY AVE · Nov 23, 2026 · 221 m away - Building permit
Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.
600 UNIVERSITY AVE · Nov 19, 2026 · 270 m away - Building permit
Proposal for interior alterations for Suite 2105 &2103
180 DUNDAS ST W · Nov 18, 2026 · 127 m away - Building permit
Interior alteration to existing office space (Unit 2200)
400 UNIVERSITY AVE · Nov 18, 2026 · 270 m away - Building permit
Revision No.1: To change Occupancy Type to B1, No new constructionProposal for interior renovation to room 7A refresh mental health pod - 2hr rating and door/hardware replacement, 1 new toilet and 1 fire damper
170 ELIZABETH ST · Nov 18, 2026 · 203 m away - Building permit
INTERIOR ALTERATIONS AND CHANGE OF USE FROM YOGA STUDIO TO DANCE STUDIO
121 DUNDAS ST W · Nov 17, 2026 · 289 m away - Building permit
Tenant improvement to existing office suite located on the 8th floor of 375 University Avenue. No changes of use or exterior work proposed. No change to existing demising walls of suite.
375 UNIVERSITY AVE · Nov 17, 2026 · 268 m away - Building permit
Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.
600 UNIVERSITY AVE · Nov 10, 2026 · 270 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- St Patrick Station2 min walk
- Nearest TTC stop
- Elm St at University Ave East Side1 min walk
- Nearest cycling route
- University AveCycle Track, 1 min walk
- Nearest traffic count
- 27,805 vehicles in 14 hUniversity Ave / Elm St, 90 m away, Oct 15, 2025
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Gallery Park5 min walk
- Larry Sefton Park6 min walk
- McCaul - Orde Parkette6 min walk
Schools within 1 km
- CONTACT ALTERNATIVE SCHOOL English Public 5 min walk
- OCAD UNIVERSITY - THE LEARNING ZONE University 5 min walk
- OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 5 min walk
- OCAD UNIVERSITY - ANNEX BUILDING University 5 min walk
- OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 7 min walk
- OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.