HousePrecheckCheck an address

500 Murray Ross PkwyToronto · zoning, lot size and permit records

Residential apartment · RA (f30.0; a1375) (x776)≈ 166.4 × 351.1 m20,407 m²on Murray Ross Pkwy

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 19 storeys, 390 rental units, built 1978More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 24 126671 (Proposal for underground Parking Garage Repairs, 2024, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • 3 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 263240 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 220460 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 197839 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: York UniversityThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 166.4 m frontage≈ 351.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (30% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (24% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 3 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 263240 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 220460 PRS 00 IR (Property Standards, 2026, status Rescheduled); 26 197839 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 126671 (Proposal for underground Parking Garage Repairs, 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (58% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 146437 PRS 00 IR (Property Standards, 2026); 26 127693 HEA 00 IR (Adequate Heat, 2026); 26 118131 PRS 00 IR (Property Standards, 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (19 storeys, 390 units, built 1978).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 265575 WST 00 IRRescheduled

    Waste

    Nov 4, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 263240 PRS 00 IRRescheduled

    Property Standards

    Nov 1, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 220460 PRS 00 IRRescheduled

    Property Standards

    Aug 16, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 197839 PRS 00 IRRescheduled

    Property Standards

    Jul 7, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 146437 PRS 00 IRClosed

    Property Standards

    Apr 19, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 127693 HEA 00 IRClosed

    Adequate Heat

    Mar 10, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation26 118131 PRS 00 IRClosed

    Property Standards

    Feb 17, 2026 · 500 MURRAY ROSS PKWY
  • By-law investigation25 243039 PRS 00 IRClosed

    Property Standards

    Oct 21, 2025 · 500 MURRAY ROSS PKWY
Show 14 older records
  • By-law investigation25 234718 PRS 00 IRClosed

    Property Standards

    Oct 3, 2025 · 500 MURRAY ROSS PKWY
  • By-law investigation25 189351 WST 00 IRClosed

    Waste

    Jul 7, 2025 · 500 MURRAY ROSS PKWY
  • Zoning review24 142150 LPRClosed
    Apr 30, 2024 · 500 MURRAY ROSS PKWY
  • Building permit24 126671Permit Issued

    Proposal for underground Parking Garage Repairs

    Apr 18, 2024 · 500 MURRAY ROSS PKWY
  • Zoning review23 140044 LPRCancelled
    May 1, 2023 · 500 MURRAY ROSS PKWY
  • Building permit14 259699Closed

    Proposal to install 1 premise isolation backflow preventor in existing apartment,

    Dec 17, 2020 · 500 MURRAY ROSS PKWY
  • Building permit20 138080Closed

    Proposal for new emergency generator to provide life safety systems.

    May 26, 2020 · 500 MURRAY ROSS PKWY
  • Building permit18 126726Closed

    Localised concrete repairs in underground parking garage and exterior walls.

    Apr 11, 2018 · 500 MURRAY ROSS PKWY
  • Building permit14 161854Closed

    Exterior repairs to balconies and walls

    Jun 19, 2014 · 500 MURRAY ROSS PKWY
  • Building permit13 172142Closed

    MGO APT 1518

    Jul 22, 2013 · 500 MURRAY ROSS PKWY
  • Building permit13 141288Closed

    Garage slab repair to existing apartment building

    Apr 26, 2013 · 500 MURRAY ROSS PKWY
  • Building permit12 259178Closed

    Garage vent shaft repairs.

    Oct 23, 2012 · 500 MURRAY ROSS PKWY
  • Building permit07 219048Closed

    Install fire alarm system upgrade for audiblity.

    Jun 13, 2007 · 500 MURRAY ROSS PKWY
  • Building permit06 172922Closed

    Construt garage repair to an existing apt. building (3550m2)

    Sep 21, 2006 · 500 MURRAY ROSS PKWY

Check before you build

  • Site-specific exception 900.7.10(776)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(776)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
20,407 m²
Frontage
166.4 mestimated, irregular lot
Depth
351.1 mestimated, irregular lot
Street
Murray Ross Pkwy
Corner lot
No
Public lane
None
House footprint
2,297 m²roof up to 62.8 m
Back yard
181.7 mhouse to rear lot line
Side yards
26.1 m and 78.7 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: York University. The lot is inside the York University Major Transit Station Area approved by the Province (Site and Area Specific Policy 642). Source
  • Minimum frontage 30 m. Frontage is about 166.4 m (estimated, irregular lot): meets the zone minimum. Source
  • Minimum lot area 1375 m². Lot area is 20,407 m²: meets the minimum. Source
  • Zone RA (f30.0; a1375) (x776) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source
  • 9 City trees in front of this lot. The City's street tree inventory lists 9 trees at this address: pine, austrian (45 cm), pine, austrian (43 cm), pine, austrian (37 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
5
Multiplex permits
2
Development applications
3

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitlaneway suite

    REV01: Revision as bubbled.Proposal to convert the existing detached garage to a one storey Laneway Suite.

    59 DELABO DR · Oct 27, 2026 · 133 m away
  • Building permitmultiplex

    Proposal for interior alterations to convert the SFD dwelling to a multiplex (4 units)

    59 DELABO DR · Oct 1, 2026 · 133 m away
  • Building permitmultiplex

    Proposal to legalize interior alteration to convert a single family semi-detached house to a 3 unit dwelling

    20 KIDD TER · Mar 16, 2026 · 193 m away
  • Building permit

    Proposal to finish the basement with the addition of three new windows and laundry added to main floor.

    23 DELABO DR · Jan 27, 2026 · 239 m away
  • Building permitlaneway suite

    Proposal to alter existing detached garage converting to a laneway suite

    26 ALDWINCKLE HTS · Jan 22, 2026 · 268 m away
  • Building permit

    Proposal to finish the basement with the addition of three new windows

    23 DELABO DR · Dec 11, 2025 · 239 m away
  • Building permitlaneway suite

    To alter existing detached garage to include a laneway suite

    26 ALDWINCKLE HTS · Dec 10, 2025 · 268 m away
  • Building permitsecondary suite

    REVISION 3 - remove exit to public lane, no new work in existing garage, install new door connecting primary unit and second unit at first floor, reconfigure new basment entry door below existing porchProposal for interior alterations to reconstruct interior stairs, new basement egress window and add a 2nd suite in the basement.

    53 DELABO DR · Oct 8, 2025 · 145 m away
  • Building permitlaneway suite

    Proposal to convert detached garage to a laneway suite.

    59 DELABO DR · Jul 11, 2025 · 133 m away
  • Building permit

    Rev 02 - Front secondary entranceProposal to construct a new front yard basement walkout staircase with a new canopy above for the existing detached single family dwelling.

    389 MURRAY ROSS PKWY · Jul 11, 2025 · 240 m away

Neighbourhood: York University Heights

About the area around the lot, not the lot itself.

Nearest station
Sentinel Station9 min walk
Nearest TTC stop
Sentinel Rd at Murray Ross Pkwy South Side5 min walk
Nearest cycling route
Finch Corridor TrlMulti-Use Trail, 2 min walk
Nearest traffic count
5,714 vehicles in 8 hSentinel Rd / Murray Ross Pkwy, 330 m away, Feb 10, 2022
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Dan Iannuzzi Park1 min walk
Black Creek Parkland1 min walk
Driftwood Park3 min walk

Schools within 1 km

  • ST WILFRID CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • DRIFTWOOD PUBLIC SCHOOL English Public 13 min walk
  • C W JEFFERYS COLLEGIATE INSTITUTE English Public 13 min walk
  • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 15 min walk
  • JAMES CARDINAL MCGUIGAN CATHOLIC HIGH SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYork University HeightsMedian neighbourhood
Median household income (2020)$76,000$84,500
Households that own their home47%54%
Population (2021)28,25516,813
Homes built in 1960 or before14%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYork University HeightsCity median
Assault1274.1636.3
Robbery12869.5
Shootings11.910.5
Auto theft634.1192.6
Theft over $5,000178.646.1
Break and enter375.1172.8
Theft from vehicles312.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.