Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (100% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation Limit13 building permits open, the oldest since 2013
Needs a closer lookStill open in the City's records: 24 117896 (REPLACE EXISTING SPRINKLER SYSTEM IN THE COVERED PARKING AND LOADING DOCK AREA INCLUDIN..., 2024, status Inspection); 24 113197 (Design for installation of three (3) electromagnetic locking devices including all life..., 2024, status Inspection); 23 201848 (Proposed renovation of existing lab / training facility to a new type of lab / training..., 2023, status Inspection); and 10 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 233891 (Proposal alterations for a new interior electrical room, 2026); 26 226329 (Proposal for interior alterations for the addition of (16) offices, 2026); 26 104816 (Proposal to upgrade fire alarm system, 2026); and 7 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
83 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 233891Permit Issued
Proposal alterations for a new interior electrical room.
Nov 17, 2026 · 500 COMMISSIONERS ST - Minor varianceA0770/26TEYPendingOct 27, 2026 · 500 COMMISSIONERS ST
- Building permit26 226329Permit Issued
Proposal for interior alterations for the addition of (16) offices
Sep 30, 2026 · 500 COMMISSIONERS ST - Building permit26 233910Examiner's Notice Sent
Proposal for addition of new electrical room to existing building.
Sep 8, 2026 · 500 COMMISSIONERS ST - Building permit26 233841Under Review
Proposal for new generator with vent pipe.
Sep 8, 2026 · 500 COMMISSIONERS ST - Building permit26 230859Ready for Issuance
Install 1 electromagnetic locking device for 2 separate single doors including all life safety requirements
Sep 1, 2026 · 500 COMMISSIONERS ST - Building permit26 104816Inspection
Proposal to upgrade fire alarm system.
Mar 9, 2026 · 500 COMMISSIONERS ST - Building permit26 110425Cancelled
Plumbing - Proposal for interior alterations.
Jan 29, 2026 · 500 COMMISSIONERS ST
Show 75 older records
- Building permit25 268232Cancelled
Proposal for fire alarm upgrades.
Dec 19, 2025 · 500 COMMISSIONERS ST - Building permit25 259406Cancelled
Proposal to upgrade fire alarm system.
Nov 27, 2025 · 500 COMMISSIONERS ST - Zoning review25 170327 ZAPApplication On HoldJun 3, 2025 · 500 COMMISSIONERS ST
- Building permit24 128608Permit Issued
Convert existing oil water separator into a containment system.
Apr 23, 2025 · 500 COMMISSIONERS ST - Building permit25 104800Permit Issued
Proposal for addition of (8) offices with full height walls.
Apr 7, 2025 · 500 COMMISSIONERS ST - Building permit24 198258Revision Issued
Revision 01 - Proposed changes to existing sprinkler system based on new layout for labs.--------------------------------------------------------------------------Renovation of existing training facility to a new type of training facility for the same owner.
Feb 14, 2025 · 500 COMMISSIONERS ST - Building permit24 146164Closed
Installation of fire sprinkler system -Toronto Hydro - Parking Floor building A B
Jun 26, 2024 · 500 COMMISSIONERS ST - Building permit24 117896Inspection
REPLACE EXISTING SPRINKLER SYSTEM IN THE COVERED PARKING AND LOADING DOCK AREA INCLUDING TIE IN TO THE FIRE ALARM SYSTEM (BLDG A and BLDG B)
Mar 26, 2024 · 500 COMMISSIONERS ST - Building permit24 113197Inspection
Design for installation of three (3) electromagnetic locking devices including all life safety requirements.
Feb 16, 2024 · 500 COMMISSIONERS ST - Building permit23 201848Inspection
Proposed renovation of existing lab / training facility to a new type of lab / training facility for the same owner.
Oct 24, 2023 · 500 COMMISSIONERS ST - Building permit23 143012Inspection
Proposal to install a VESDA replacement system.
Jun 12, 2023 · 500 COMMISSIONERS ST - Building permit22 206248Inspection
HVAC addition to electrical room - Building D - Level 1 - Service Garage - Toronto Hydro
Jan 11, 2023 · 500 COMMISSIONERS ST - Building permit22 101052Closed
Addition of three (3) mag locks and three (3) turnstiles
Jan 31, 2022 · 500 COMMISSIONERS ST - Building permit21 137340Closed
In conjunction with a multi-storey building on the premises, proposal to erect and display two non-illuminated wall signs, displaying static copy at the uppermost storey on the west and east elevations.*****TORONTO HYDRO*****
May 18, 2021 · 500 COMMISSIONERS ST - Zoning review21 109978 ZSVClosedJan 28, 2021 · 500 COMMISSIONERS ST
- Building permit20 222589Permit Issued
Proposal to install turnstiles for increased security Toronto hydro office building.
Dec 23, 2020 · 500 COMMISSIONERS ST - Zoning review20 225647 ZPRClosedDec 4, 2020 · 500 COMMISSIONERS ST
- Building permit20 185863Permit Issued
PROPOSED ROOFTOP UNIT REPLACEMENT AT NORTH SIDE OF BUILDING B
Sep 30, 2020 · 500 COMMISSIONERS ST - Building permit18 168214Permit Issued
Installation of a backflow preventer in the mechanical room.
Jun 26, 2018 · 500 COMMISSIONERS ST - Building permit16 208601Closed
Proposal to replace mechanical rooftop units and add new ductwork, this permit is for the structural component.
Sep 15, 2016 · 500 COMMISSIONERS ST - Building permit16 164671Closed
Proposal to install 2 maglocks in existing office space on the 1st floor - Toronto Hydro
Jun 27, 2016 · 500 COMMISSIONERS ST - Building permit16 155481Closed
Proposal to install 1 mag lock in Building D.
Jun 13, 2016 · 500 COMMISSIONERS ST - Building permit15 163253Inspection
To construct at 13 sm HUB room in existing Electrical Room, new lighting, security camera and door
Jun 15, 2015 · 500 COMMISSIONERS ST - Building permit15 123079Closed
RENOVATION TO TORONTO HYDRO - 500 COMMISSIONERS ST - PARTIAL 2ND FLOOR-NORTH
Mar 16, 2015 · 500 COMMISSIONERS ST - Building permit14 170782Closed
Revision 01: Install electric strikes in lieu of maglocks on three (3) separate doors (Doors #1, 4 and 5). Proposal to install 15 maglocks in 2nd floor office space - Toronto Hydro See related building permit 14 170775 BLD.
Jan 21, 2015 · 500 COMMISSIONERS ST - Building permit14 240483Closed
Revsion to add 1 additional electromagnetic lock in warehouse area.
Dec 22, 2014 · 500 COMMISSIONERS ST - Building permit14 253166Closed
interior alterations from men's w/c to construct women's changeroom
Dec 1, 2014 · 500 COMMISSIONERS ST - Building permit14 240645Closed
Proposal for the installation of (6) maglocks within the security office
Nov 19, 2014 · 500 COMMISSIONERS ST - Building permit14 232528Closed
Installation of 3 tree pre-action sprinkler systems for CCR, Telecom and UPS computer rooms on second floor (building B) and modification to existing wet-pipe sprinkler in new control centre (building A)
Nov 4, 2014 · 500 COMMISSIONERS ST - Building permit14 240657Closed
To complete interior alterations to the existing office to the reception desk and constructing a new hub room.
Nov 3, 2014 · 500 COMMISSIONERS ST - Building permit14 223090Closed
Proposal for interior alterations to existing office space on the 3rd floor.
Oct 2, 2014 · 500 COMMISSIONERS ST - Building permit14 170775Closed
Proposal for interior alterations to existing office space on the 2nd floor (control centre) - Toronto Hydro
Jul 3, 2014 · 500 COMMISSIONERS ST - Building permit14 123085Closed
REVISION: Alterations to proposed layout of first floor. Proposal for interior alterations to the 1st floor of existing office building for "Toronto Hydro". Proposal to include for HVAC, PLB and 1 Electromagnetic Lock.
Jun 26, 2014 · 500 COMMISSIONERS ST - Building permit14 168605Closed
Proposed alterations to first floor (99m2) data storage and IT data rooms for Toronto Hydro.
Jun 19, 2014 · 500 COMMISSIONERS ST - Building permit14 154441Closed
To complete interior alterations to second floor of the existing office building.
Jun 12, 2014 · 500 COMMISSIONERS ST - Building permit14 163597Closed
To complete interior alterations to the storage room on the second floor of the existing office building.
Jun 11, 2014 · 500 COMMISSIONERS ST - Building permit14 162326Closed
Proposed alteration to third floor storage room (31.77m2) to convert into new radio equipment room for Toronto Hydro.
Jun 11, 2014 · 500 COMMISSIONERS ST - Building permit14 144529Closed
Proposal to replace the interior air curtains at the entranceway of the fleet garage for Toronto Hydro.
May 20, 2014 · 500 COMMISSIONERS ST - Building permit14 144539Closed
Proposal for interior alterations to convert existing warehouse to a glove cleaning and testing plant.
May 15, 2014 · 500 COMMISSIONERS ST - Building permit13 278271Closed
Revision #1 to layout and structure of building for complete interior alterations the first floor of the existing office data centre.
May 2, 2014 · 500 COMMISSIONERS ST - Building permit14 123074Closed
Proposal for interior alterations to the 3rd floor of existing office building for "Toronto Hydro". Proposal to include for HVAC.
Apr 7, 2014 · 500 COMMISSIONERS ST - Building permit14 123120Closed
install 1 maglock in data centre
Mar 27, 2014 · 500 COMMISSIONERS ST - Building permit14 123086Closed
Proposal for interior alterations to the 1st floor of existing office building for "Toronto Hydro". Proposal to include for HVAC, PLB and 1 Electromagnetic Lock.
Mar 27, 2014 · 500 COMMISSIONERS ST - Building permit14 115753Closed
Installation of ten (10) electromagnetic locks.
Mar 13, 2014 · 500 COMMISSIONERS ST - Zoning review14 120321 ZPRClosedFeb 21, 2014 · 500 COMMISSIONERS ST
- Building permit13 268936Closed
Proposal for interior alterations to 2nd floor of existing office building for "Toronto Hydro" (1825m2). Proposal also includes HVAC.
Dec 19, 2013 · 500 COMMISSIONERS ST - Building permit13 271936Closed
Proposal for interior alterations to ground floor of existing office building for new computer room(Point of Presence) - "Toronto Hydro"
Dec 5, 2013 · 500 COMMISSIONERS ST - Building permit13 260102Inspection
HVAC - To complete interior alterations (180 m2) to the servary area of the Toronto Hydro Office. A Kitchen Exhaust fan will also be installed in the servery.
Nov 28, 2013 · 500 COMMISSIONERS ST - Building permit13 226026Permit Issued
HVAC - Proposal for interior alterations to 1st floor of existing office building (3566m2) "Toronto Hydro"
Sep 24, 2013 · 500 COMMISSIONERS ST - Building permit13 194568Permit Issued
HVAC - Proposal for interior alterations to existing office space on the 2nd floor - Toronto Hydro (Supply Chain)
Jul 24, 2013 · 500 COMMISSIONERS ST - Building permit13 169086Permit Issued
HVAC - Proposal for interior alterations to convert storage space to office space on the 1st floor of existing office building (83m2).
Jun 19, 2013 · 500 COMMISSIONERS ST - Building permit10 286105Closed
HVAC - Proposal to construct a concrete pad to house a new backup generator for Toronto Hydro building.
Dec 3, 2010 · 500 COMMISSIONERS ST - Building permit10 295879Closed
Concrete repairs to portions of sections A, B, and C.
Nov 17, 2010 · 500 COMMISSIONERS ST - Building permit10 285324Closed
Reroofong and Installation of photovoltaic panels on the roof of Building "A" for Toronto Hydro. There are many arrays and approx 1980 panels installed on the roof.
Nov 8, 2010 · 500 COMMISSIONERS ST - Building permit10 264819Closed
Proposal to install 2 back flow preventors for incoming water. Toronto Hydro Building.
Oct 21, 2010 · 500 COMMISSIONERS ST - Building permit10 127284Closed
Proposal to install sprinklers on the ground floor, ground level parking garage and ground level loading dock in an existing multi use commercial building.
Apr 8, 2010 · 500 COMMISSIONERS ST - Building permit09 128731Closed
Proposal for interior alterations to office area located on the third floor. This is the Toronto Hydro Electric System, Building B. This proposal is for the creation of some new offices and interior partition layout changes and will include HVAC.
May 22, 2009 · 500 COMMISSIONERS ST - Building permit09 129333Closed
Proposal for the structural reinforcement of areas in the roof that will be affected from the new installation of HVAC equipment on the roof of building "B". The HVAC equipment includes two(2) make up air units and two(2) exhuast fans.
May 7, 2009 · 500 COMMISSIONERS ST - Building permit05 180283Closed
Replace defective main fire alarm panel no alterations to wiring or devices in the building
Sep 19, 2005 · 500 COMMISSIONERS ST - Building permit05 151286Closed
Construct raised storage platform inside maintenance building.
Aug 30, 2005 · 500 COMMISSIONERS ST - Building permit04 150807Closed
To increase load on south facade by installing Solar panels on passive solar shading device.(see drawings).
Jun 30, 2004 · 500 COMMISSIONERS ST - Building permit03 173691Closed
To erect a pre- fabricated steel aggregate storge building at the outdoor storage facility .
Apr 13, 2004 · 500 COMMISSIONERS ST - Zoning review01 013386 LTOClosedOct 24, 2001 · 500 COMMISSIONERS ST
- Zoning review01 012814 LTOClosedJun 15, 2001 · 500 COMMISSIONERS ST
- Building permit01 135818Closed
Install one maglock on ground floor
May 10, 2001 · 500 COMMISSIONERS ST - Zoning review01 035310 ZSVClosedMar 26, 2001 · 500 COMMISSIONERS ST
- Zoning review00 356214 000ClosedNov 21, 2000 · 500 COMMISSIONERS ST
- Building permit97 012327Closed
INSTALL MAGLOCKS IN PARKING LEVEL, LEVEL 1, LEVEL 2, LEVEL 3. EDC
Jan 15, 1997 · 500 COMMISSIONERS ST - Building permit96 020479Closed
INSTALL MAGLOCKS ON ALL LEVELS. BP
Sep 9, 1996 · 500 COMMISSIONERS ST - Zoning review96 025386 LTOClosedAug 26, 1996 · 500 COMMISSIONERS ST
- Building permit95 022511Closed
MAKE INTERIOR ALTERATIONS ON 1ST FLOOR AND CREATE MEZZANINE SHELVING LEVEL. (BUILDING D)
Dec 11, 1995 · 500 COMMISSIONERS ST - Building permit94 024331Closed
BUILD WAREHOUSE-SINGLE STOREY WITH MEZZANINES--BLD A; OFFICES & WORKSHOPS 3 STOREYS--BLD B; FLEET PARKING TWO LEVELS-BLD C; SERVICE GARAGE TWO STOREYS-BLD D LP
Aug 9, 1995 · 500 COMMISSIONERS ST - Building permit95 015976Closed
PARTIAL PERMIT APPLICATION RELATED TO PERMIT APPLN # 368949 SUPERSTRUCTURE & BUILDING ENVELOPE IN CONJUNCTION WITH BUILDINGS C AND D ( STRUCTURAL ONLY) COST INCL. 368949 /LM
May 12, 1995 · 500 COMMISSIONERS ST - Building permit95 012461Closed
PARTIAL PERMIT APPLICATION RELATED TO PERMIT APPLN # 368949 EXCAVATION AND FOUNDATIONS IN CONJUNCTION WITH BUILDINGS A B, C AND D COST INCLUDED IN 368949 DB
Mar 8, 1995 · 500 COMMISSIONERS ST - Building permit92 022813Closed
DEMOLISH 11 BUILDINGS & 75 ABOVE GROUND TANKS. AREA OF BUILDING 91496 SQ.FT. AREA OF TANKS 91496 SQ.FT. TOTAL FEE $ 1830.00
Dec 2, 1992 · 500 COMMISSIONERS ST
Check before you build
Site-specific exception 900.21.10(9)
Needs a closer look26 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In addition to uses permitted in Clause 60.10.20.10, the following additional uses are permitted: (i) district heating and cooling plant ; (ii) public works yard
- Rule B
Despite the uses listed in Clause 60.10.20.10 and 60.10.20.20, the following uses are not permitted: (i) dry cleaning or laundry plant; (ii) self-storage warehouse ; (iii) crematorium ; (iv) plastic product manufacturing use
- Rule C
Despite Regulation 60.12.20.100 (19), a Transportation Use is only permitted if it is operated by the Toronto Transit Commission
- Rule D
In addition to Regulation 60.10.20.100 (7), a Contractor's Establishment may not store loose materials such as sand, gravel or concrete on the lot unless enclosed in a building
- Rule F
In addition to Clause 60.10.20.100, the following conditions apply to Open Storage : (i) on a lot with Open Storage , an opaque visual barrier, such as a fence, must be provided: (a) Along all lot lines that abut a street , except for the portions used for vehicle and pedestrian access; or (b) Along the entire perimeter of the portion of the lot that is used for Open Storage ; and (c) Along all lot lines that abut a lot in the Open Space Zone Category
- Rule G
Despite Clause 60.10.20.10, a Warehouse use is permitted if the use does not exceed the lesser of: (i) 50 percent of the interior floor area of the building ; or (ii) 2,000 square meters of interior floor area of the building
- Rule H
Despite Clause 60.10.20.10, a Warehouse use may not be used for the purposes of, or in association with, a postal or courier service
- Rule I
Despite (H) above, on 600 Commissioners Street, a Warehouse may be used for the purposes of, or in association with a postal or courier service
- Rule J
Despite Clause 60.10.20.10, a Wholesaling Use is permitted if the use does not exceed the lesser of: (i) 50 percent of the interior floor area of the building ; or (ii) 2,000 square meters of interior floor area of the building
- Rule K
Despite (G) and (H) above, the cumulative interior floor area of all portions of a building used for Wholesaling Use and Warehouse use within a building may not exceed 50 percent of the interior floor area of the building
- Rule L
Despite Clause 60.10.20.10, an Office use is permitted if the use does not exceed 75 percent of the interior floor area of a building
- Rule M
Despite Regulation 60.10.20.20.(1), a Marihuana Production Facility is a permitted use if it complies with the specific use regulations in Section 150.60
- Rule N
Despite Regulation 60.10.20.20(1), all Manufacturing Uses are permitted, except: (i) abattoir, Slaughterhouse or Rendering of Animals Factory; Ammunition, Asphalt Plant; Cement Plant; Concrete Batching Plant; Firearms or Fireworks Factory; Crude Petroleum Oil or Coal Refinery; Explosives Factory; Industrial Gas Manufacturing ; Large Scale Smelting or Foundry Operations for the Primary Processing of Metals; Pesticide or Fertilizer Manufacturing ; Petrochemical Manufacturing ; Plastic Product manufacturing use , Primary Processing of Gypsum; Primary Processing of Limestone; Primary Processing of Oil-based Paints, Oil-based Coatings or Adhesives; Pulp Mill, using pulpwood or other vegetable fibres; Resin, Natural or Synthetic Rubber Manufacturing ; and Tannery; and (ii) a Manufacturing Use may not exceed 5,000 square metres of interior floor area of the building
- Rule O
Despite Regulation 60.10.20.100 (5) and (6), a Retail Store, Eating Establishment and Take-out Eating Establishment are permitted, if they do not exceed 3,500 square metres of interior floor area of a building , comply with (T) and (U) below, and any eating establishment must comply with the specific use regulations in 150.100
- Rule P
Despite Clause 60.10.20.10, a Financial Institution is not permitted within 20 metres of a an intersection of streets and must comply with (T) and (U) below
- Rule Q
Despite Regulation 60.10.20.20(1), the following additional uses are permitted if they comply with the conditions set out (T) and (U) below: (i) art gallery ; (ii) personal service shop ; (iii) pet services ; (iv) amusement arcade ; (v) library ; (vi) museum ; (vii) performing arts studio ; and (viii) recreation use
- Rule R
Despite Regulation 60.10.20.100(11), an outdoor patio must: (i) be combined with the following uses: (a) Cabaret ; (b) Place of Assembly ; (c) Entertainment Place of Assembly ; (d) Nightclub ; (e) Recreation Use ; or (f) Take-out Eating Establishment ; (ii) not be used to provide entertainment such as performances, music and dancing; (iii) be located entirely within 5 metres of a lot line abutting Leslie Street, Commissioners Street or Carlaw Avenue; and (iv) comply with the conditions set out in (T) and (U) below
- Rule S
Despite Clause 60.10.20.20 , Place of Assembly , Entertainment Place of Assembly , Cabaret and Nightclub are permitted uses, if the cumulative area of these uses does not exceed 600 square metres of interior floor area of a building and they comply with the conditions set out in
- Rule T
- Rule U
below; (T) No building or structure with a lot line abutting Carlaw Avenue may be erected or used on a lot unless the following conditions are satisfied: (i) despite Clauses 60.10.20.10 and 60.10.20.20, a minimum of 60 percent of the cumulative length of the exterior main walls of the building or structure at the first storey above ground must be used for the purpose of one or more of the following: (a) Art Gallery ; (b) Artist Studio ; (c) Financial Institution ; (d) Personal Service Shop ; (e) Pet Services ; (f) Retail Store ; (g) Eating Establishment ; (h) Take-out Eating Establishment ; (i) Amusement Arcade ; (j) Custom Workshop ; (k) Library; (l) Museum ; (m) Performing Arts Studios ; (n) Recreation Use ; (o) Place of Assembly ; (p) Entertainment Place of Assembly ; (q) Cabaret; and (r) Nightclub ; (ii) of the uses set out in (T)(i), a lobby of a building may be used for up to 20 percent of the required 60 percent of the cumulative length of the exterior main walls of the building or structure at the first storey above ground; (iii) the permitted maximum unit widths for uses on the first storey above ground is: (a) 7.0 metres for uses listed in (T)(i) above; and (b) A total of one unit may be 14.0 metres for the uses listed in (T) above, provided this unit is able to be demised into two 7.0 metre wide units at a future date; and (iv) the uses in (T)(i) above are permitted on any storey of a building , if the use is located entirely within 30.0 metres of a lot line abutting Carlaw Avenue, except that this location restriction does not apply to any artist studio , custom workshop or performing arts studio use; (v) the floor level of the first storey of a building must be within 0.2 metres of the ground measured at the lot line abutting the street directly opposite each pedestrian entrance; and (vi) any use located in the first storey must have a principal entrance accessed from Carlaw Avenue which, if not level with the public sidewalk closest to the entrance, is accessed by a ramp which rises no more than 0.04 metres vertically for every 1.0 metre horizontally; (U) Despite Clauses 60.10.20.10 and 60.10.20.20, the following additional uses are permitted on any storey of a building , if the use is located entirely within 30.0 metres of a lot line abutting Lake Shore Boulevard East, Leslie Street, Commissioners Street, or the future Caroline Extension: (i) art gallery ; (ii) artist studio ; (iii) financial institution ; (iv) personal service shop ; (v) pet services ; (vi) retail store ; (vii) eating establishment ; (viii) take-out eating establishment ; (ix) amusement arcade ; (x) custom workshop ; (xi) library; (xii) museum ; (xiii) performing arts studios ; (xiv) recreation use ; (xv) post secondary school ; (xvi) place of assembly ; (xvii) entertainment place of assembly ; (xviii) cabaret ; and (xix) nightclub
- Rule V
Despite (U) above, and Clauses 60.10.20.10 and 60.10.20.20, no building or structure with a lot line abutting Lake Shore Boulevard East, Leslie Street, Commissioners Street or a future extension of Caroline Avenue may be erected or used on a lot unless the following conditions are satisfied: (i) the 30.0 metre location restriction for uses described in (U) above does not apply to Artist Studio , Custom Workshop or Performing Arts Studio uses; (ii) the permitted maximum unit widths for uses described in (U) above on the first storey above ground must be: (a) 7.0 metres for uses listed in (U) above; (b) A total of one unit may be 14.0 metres for the uses listed in (U) above, provided this unit is able to be demised into two 7.0 metre wide units at a future date; and (c) Unit width restrictions in (a) and (b) in do not apply to Artist Studio , Custom Workshop or Performing Arts Studio uses; (iii) the floor level of the first storey must be within 0.2 metres of the ground measured at the lot line abutting the street directly opposite each pedestrian entrance; and (iv) any use located in the first storey must have principal entrances accessed from Lake Shore Boulevard East, Leslie Street, Commissioners Street, or a future extension of Caroline Avenue which, if not level with the public sidewalk closest to the entrance, is accessed by a ramp which rises no more than 0.04 metres vertically for every 1.0 metre horizontally
- Rule W
Any portion of a building or structure located within 30.0 metres of a lot line abutting Leslie Street, Commissioners Street, Carlaw Avenue and a future extension of Caroline Avenue must: (i) have a required minimum height of 12.0 metres and have at least 3 storeys ; and (ii) have a required minimum first storey height of 5.0 metres, measured between the top of the floor of the first storey and the underside of the ceiling of the first store y
- Rule X
Despite Regulation 60.10.40.70 (1) for a building located on a lot with a front lot line abutting Carlaw Avenue, Leslie Street, Commissioners Street and a future extension of Caroline Avenue, a minimum of 60 percent of the total width of the front walls meeting the height requirements in (W)(i) above must be located within 0 metre of the front lot line
- Rule Y
Despite Regulation 60.10.40.70 (1), above, any main wall of a building not exceeding 12.0 metres in height and facing a lot line abutting one of the streets below must be located within 0 metre of the portion of a lot line located less than 30.0 metres from the intersections of the following streets : (i) Lake Shore Boulevard East and Carlaw Avenue; (ii) Lake Shore Boulevard East and Leslie Street; (iii) Lake Shore Boulevard East and a future extension of Caroline Avenue; (iv) Commissioners Street and Carlaw Avenue; (v) Commissioners Street and a future extension of Caroline Avenue; and (vi) Commissioners Street and Leslie Street
- Rule Z
Despite Regulation 60.10.40.70 (2), the required minimum building setback from a side lot line excludes any part of the building or structure that is less than 30.0 metres from a lot line abutting a street , in which case no side yard setback is required. Regulation 60.10.40.70(2) continues to apply to any part of a building or structure that is further than 30 metres from a lot line abutting a street
- Rule AA
Despite Clause 60.10.40.70, on any lot abutting Carlaw Avenue or Caroline Avenue, the required minimum building setback from a lot line that abuts that street is 5.0 metres for any portion of the building or structure which exceeds a height of 18.0 metres; (BB) Despite Regulation 60.10.50.10(1), a lot abutting Carlaw Avenue, Leslie Street, Commissioners Street or a future extension of Caroline Avenue are not subject to minimum front yard landscaping requirements; (CC) Despite Clause 60.5.80.10, a parking space may not be in: (i) a front yard ; or (ii) a side yard abutting a street ; or (iii) be located in a side yard not abutting a street , if the parking space is set back a minimum of 5.0 metres from a front lot line ; (DD) Despite Regulation 60.10.94.40(1): (i) where a lot abuts a lane , vehicle access to a loading space or parking space must be from the lane ; (ii) if the corner lot does not abut a lane and has at least one lot line abutting a street which is not a major street on the Policy Overlay Map, vehicle access to a loading space or a parking space must be from the street which is not a major street ; and (iii) only one vehicle access is permitted; (EE) Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, for a Bindery , Building Supply Yard , Carpenter's Shop, Cold Storage, Custom Workshop , Laboratory , Manufacturing Use , Marijuana Production Facility, Metal Factory , Printing Establishment , Cold Storage , Production Studio , Public Works Yard , Warehouse and Wholesaling Use, parking spaces must be provided at a minimum rate of 0.15 for each 100 square metres of gross floor area and a maximum rate of 0.75 for each 100 square metres of gross floor area ; and (FF) Despite Regulation 230.5.10.1(1) and Table 230.5.10.1(1), a Bindery , Building Supply Yard , Carpenter's Shop, Cold Storage, Custom Workshop , Laboratory , Manufacturing Use , Marijuana Production Facility, Metal Factory , Printing Establishment , Cold Storage , Production Studio , Public Works Yard , Warehouse and Wholesaling Use must provide 0.25 bicycle parking spaces per 100 square metres of interior floor area , with the following allocated as follows: (i) 10 percent short-term bicycle parking spaces ; and (ii) 90 percent long-term bicycle parking spaces .
- Older by-law A
Section 12(1) 221 of the former City of Toronto By-law 438-86
3 parts for other addresses
- E On 650 Commissioners Street, despite Regulation 60.10.20.100(12), Open Storage : (i) may be associated with a permitted use; (ii) may be greater than 10% of …
- B On 1025 Lake Shore Blvd E, former City of Toronto by-law 198-2005
- C On 675 Commissioners St, former City of Toronto by-law 522-2018.
Lot facts
- Area
- 50,142 m²
- Frontage
- 152.5 m
- Depth
- 335.2 m
- Street
- Carlaw Ave
- Corner lot
- Yes, also on Commissioners St335.2 m along it
- Public lane
- None
- House footprint
- 18,685 m²roof up to 24.3 m
- Back yard
- 102.5 mhouse to rear lot line
- Side yards
- 0 m and 46.6 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 4house, garage, sheds
- Max height
- 30 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Central Waterfront Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone EL 2.5 (x9) (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust skyline (3 cm), honey locust skyline (3 cm), honey locust skyline (3 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal alterations for a new interior electrical room.
500 COMMISSIONERS ST · Nov 17, 2026 · 25 m away - Minor variancePending
Postponed
500 COMMISSIONERS ST · Oct 27, 2026 · 25 m away - Building permit
Proposal for interior alterations for the addition of (16) offices
500 COMMISSIONERS ST · Sep 30, 2026 · 25 m away - Building permit
Proposal for addition of new electrical room to existing building.
500 COMMISSIONERS ST · Sep 8, 2026 · 25 m away - Building permit
Proposal for new generator with vent pipe.
500 COMMISSIONERS ST · Sep 8, 2026 · 25 m away - Building permit
Install 1 electromagnetic locking device for 2 separate single doors including all life safety requirements
500 COMMISSIONERS ST · Sep 1, 2026 · 25 m away - Building permit
Proposal to upgrade fire alarm system.
500 COMMISSIONERS ST · Mar 9, 2026 · 25 m away - Building permit
1 GROUND SIGN**MAYFAIR CLUBS**
801 LAKE SHORE BLVD E · Mar 6, 2026 · 291 m away - Building permit
Plumbing - Proposal for interior alterations.
500 COMMISSIONERS ST · Jan 29, 2026 · 25 m away - Zoning review
Closed
801 LAKE SHORE BLVD E · Dec 22, 2025 · 291 m away
Neighbourhood: South Riverdale
About the area around the lot, not the lot itself.
- Nearest station
- Pape Station48 min walk
- Nearest TTC stop
- Carlaw Ave at Commissioners St North Side3 min walk
- Nearest cycling route
- Carlaw AveMulti-Use Trail - Boulevard, 3 min walk
- Nearest traffic count
- 7,375 vehicles in 14 hCarlaw Ave / Commissioners St, 200 m away, Oct 6, 2026
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
- Parks
- McCleary Park7 min walk
- Morse Street Playground8 min walk
- Tommy Thompson Park11 min walk
Schools within 1 km
- BRUCE JR PUBLIC SCHOOL English Public 12 min walk
- MORSE STREET JR PUBLIC SCHOOL English Public 13 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Riverdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $100,000 | $84,500 |
| Households that own their home | 57% | 54% |
| Population (2021) | 27,815 | 16,813 |
| Homes built in 1960 or before | 52% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Riverdale | City median |
|---|---|---|
| Assault | 828.7 | 636.3 |
| Robbery | 69.3 | 69.5 |
| Shootings | 3.2 | 10.5 |
| Auto theft | 217.4 | 192.6 |
| Theft over $5,000 | 88.2 | 46.1 |
| Break and enter | 264.7 | 172.8 |
| Theft from vehicles | 349.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.