HousePrecheckCheck an address

50 Wilson Heights BlvdToronto · zoning, lot size and permit records

Also 50 Wilson Heights Blvd

Open space · OR≈ 54.3 × 92.4 m3,049 m²on Ansford Avecorner, also on Goodwill Ave

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 254305 (Deferred Fees from folder 24 254305 (RSN-5561213) ZoningProcess RSN 76410401, 2025); 24 254304 (Tower C - A 10 storeys residential tower above the podium with rental and affordable ho..., 2024); 24 254302 (Tower B - 10 storeys high above the podium with 116 rental dwelling units (57 Affordabl..., 2024); and 3 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • Major Transit Station Area: WilsonThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 54.3 m frontage≈ 92.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 214512 (Proposal to install geothermal piping underground for a proposed development, 2024, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 140244 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 254305 (Deferred Fees from folder 24 254305 (RSN-5561213) ZoningProcess RSN 76410401, 2025); 24 254304 (Tower C - A 10 storeys residential tower above the podium with rental and affordable ho..., 2024); 24 254302 (Tower B - 10 storeys high above the podium with 116 rental dwelling units (57 Affordabl..., 2024); and 3 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0057/26NY (To alter the development standards for the mult-tower mixed use development (Block 2),..., 2026).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

27 records on file: more than at 100% of Toronto houses (median 0).

  • Minor varianceA0378/26NYPending

    To alter the development standards for the mult-tower mixed use development, as approved under Site-Specific By-law No. 1514-2025, in order to permit an additional storey to Buildings A, B and C that are currently under construction, resulting in three 18-storey Towers, and to modify the bicycle parking requirements.

    Dec 10, 2026 · 50 WILSON HEIGHTS BLVD
  • Zoning review26 241704 ZAPNotice Sent
    Sep 22, 2026 · 50 WILSON HEIGHTS BLVD
  • Minor varianceA0057/26NYApproved

    To alter the development standards for the mult-tower mixed use development (Block 2), as approved under Site-Specific By-law No. 1514-2025.

    Mar 26, 2026 · 50 WILSON HEIGHTS BLVD
  • Building permit24 254305Closed

    Conditional Permit - Part Permit - Tower A - includes and supported by a tw levels underground parking garage, and a 7 storeys podium with ground floor retail (shell space only), day nursery, and community centre. Tower A is 10 storeys high above the podium with 286 of affordable housing of the 531 rental dwelling units . The podium will support Towers B and C as well under separate building permit applications.

    Dec 17, 2025 · 50 WILSON HEIGHTS BLVD
  • Zoning review25 229565 ZAPClosed
    Sep 23, 2025 · 50 WILSON HEIGHTS BLVD
  • Building permit25 254305Open

    Deferred Fees from folder 24 254305 (RSN-5561213) ZoningProcess RSN 76410401

    Jul 31, 2025 · 50 WILSON HEIGHTS BLVD
  • By-law investigation25 179064 LGW 00 IRClosed

    Long Grass and Weeds

    Jun 17, 2025 · 50 WILSON HEIGHTS BLVD
  • By-law investigation25 140244 PRS 00 IRClosed

    Property Standards

    Apr 5, 2025 · 50 WILSON HEIGHTS BLVD
Show 19 older records
  • Building permit24 254304Examiner's Notice Sentnew building

    Tower C - A 10 storeys residential tower above the podium with rental and affordable housing unitsNote: Tower C is supported by the podium which is part of a building permit ( #24 254305 BLD for Tower A).

    Dec 29, 2024 · 50 WILSON HEIGHTS BLVD
  • Building permit24 254302Examiner's Notice Sentnew building

    Tower B - 10 storeys high above the podium with 116 rental dwelling units (57 Affordable housing). Tower B is supported by the podium which is part of a building permit for Building A.

    Dec 29, 2024 · 50 WILSON HEIGHTS BLVD
  • Building permit24 214512Inspection

    Proposal to install geothermal piping underground for a proposed development.

    Nov 13, 2024 · 50 WILSON HEIGHTS BLVD
  • Building permit24 221908Cancellednew building

    Construct 17 storey apartment with rental and affordable housing unitsTower C is supported by the podium which is part of a building permit for Building A.

    Oct 4, 2024 · 50 WILSON HEIGHTS BLVD
  • Building permit24 221906Cancellednew building

    Tower B - 10 storeys high above the podium with 116 rental dwelling units (57 Affordable housing). Tower B is supported by the podium which is part of a building permit for Building A.

    Oct 4, 2024 · 50 WILSON HEIGHTS BLVD
  • Building permit24 221869Cancellednew building

    Tower A - includes and supported by a tw levels underground parking garage, and a 7 storeys podium with ground floor retail (shell space only), day nursery, and community centre. Tower A is 10 storeys high above the podium with 286 of affordable housing of the 531 rental dwelling units . The podium will support Towers B and C as well under separate building permit applications.

    Oct 4, 2024 · 50 WILSON HEIGHTS BLVD
  • Development application24 211509 NNY 06 OZClosed

    NOTICE OF PASSING OF ZONING BY-LAW 1514-2025 City Initiated revision to Zoning Bylaw No. 228-2020 impacting only Block 1development as follows: reduction in height from 47.2 metres to 44.3 metres; reduced storeys from 12 to 10; removal of office component; increase to residential units from 206 to 209; reduction in parking spaces from 159 to 155; reduced bicycle parking from 230 to 209; removal of publicly accessible open space; creation of a new Block "9" for the existing sewer lands running along Allen Road; revised westside setback. Related Wilson Heights OPA not impacted: (1298-2015 (OPA 309) & SASP 387). TAKE NOTICE that the City of Toronto passed Zoning By-law 1514-2025 on December 17, 2025, with respect to the lands known as 50 Wilson Heights Boulevard (Block 1).

    Sep 11, 2024 · 50 WILSON HEIGHTS BLVD · City file
  • Building permit23 157501Cancelled

    A stage and about 100 tents will be built for the 2 day special event - Toronto Fiesta Extravaganza - onFriday, June 23rd, 2023 midnight and will be taken down on Sunday, June 25th at around 7PM.

    Jun 7, 2023 · 50 WILSON HEIGHTS BLVD
  • Zoning review21 250768 PSPClosed
    Jan 26, 2022 · 50 WILSON HEIGHTS BLVD
  • Zoning review21 250736 PSPClosed
    Jan 26, 2022 · 50 WILSON HEIGHTS BLVD
  • Development application21 250736 NNY 06 SANOAC Issued

    To construct a mixed-use building with three 17 storey towers on a shared podium. Block 2 will provide 782 rentail units with 383 of those unit being affordable rental housing, day care, community spaceand retail space. Concurrent subdivision application (File # 19 232756 NNY 06 SB).

    Dec 22, 2021 · 50 WILSON HEIGHTS BLVD · City file
  • Development application21 250768 NNY 06 SAUnder Review

    Site plan approval application for the lands at 50 Wilson Heights Boulevard (Block 1). Proposed mixed-use 13 storey building (Block 1) on southerly portion of the overall development..

    Dec 22, 2021 · 50 WILSON HEIGHTS BLVD · City file
  • Zoning review21 229317 ZPRClosed
    Oct 22, 2021 · 50 WILSON HEIGHTS BLVD
  • Zoning review19 114174 PRZClosed
    Jan 29, 2020 · 50 WILSON HEIGHTS BLVD
  • Development application19 232756 NNY 06 SBClosed

    Housing Now subdivision application, paired with OZ File #19 114174 NNY 06 OZ. Zoning By-law #228-2020 & OPA 309 & SASP 387 - AT 6696914; Registration Date: November 13, 2024.

    Oct 7, 2019 · 50 WILSON HEIGHTS BLVD · City file
  • Development application19 114174 NNY 06 OZClosed

    Zoning By-law #228-2020 & OPA 309 & SASP 387City-initiated (Housing Now) zoning by-law amendment proposing a transit-oriented, mixed use development at 50 Wilson Heights Blvd. The proposed redevelopment of the commuter parking facility is comprised of the following: 73,864 square metres (791,250 square feet) of residential gross floor area, a portion of which would be dedicated to affordable housing; 623 square metres (6,704 square feet) of indoor and outdoor amenity space; 4,260 square metres (45,859 square feet) of office space; 1,867 square metres (20,096 square feet) of community use; and 672 square metres (7,229 square feet) of retail space. On a block by block basis the proposed mixed-use development consists of: Block 1 would contain a 12 storey commercial and residential building; Block 2 would contain two 16-storey and one 14-storey tall buildings connected by a 6-storey podium building; Block 3 would would contain a 7-storey mid-rise residential building; Block 4 would contain a 2-storey community use with an adjacent community green space; 2 levels of underground parking are proposed; and Park - proposal would also contain a 3,070 square metre (0.76 acre) public park. A draft plan of subdivision application will follow in the near future to create the proposed development blocks, the roads and the public park.

    Feb 11, 2019 · 50 WILSON HEIGHTS BLVD · City file
  • Development application16 181970 NNY 09 SAClosed

    Proposed residential commplex comprising an 11-storey condominium apartment building (237 units), an 8-storey condominium apartment building (151 units) and a 4-storey rental apartment building (53 units) on Block 'A' of the Stanley Greene Subdivision.

    Jun 28, 2016 · 50 WILSON HEIGHTS BLVD · City file
  • Development application10 289554 NNY 10 OZClosed

    OPA submitted by Build Toronto to implement a new Downsview Area Secondary Plan on the same lands subject of the City-initiated Downsview Area Secondary Plan Review. These lands are also subject of an OPA submitted by Parc Downsview Park Inc. to also implement a new Downsview Area Secondary Plan.

    Nov 2, 2010 · 50 WILSON HEIGHTS BLVD
  • Development application10 163808 NNY 10 OZClosed

    OPA submitted by Parc Downsview Park Inc. to implement a new Downsview Area Secondary Plan on the same lands subject of the City-initiated Downsview Area Secondary Plan Review. These lands are also subject of an OPA submitted by Build Toronto to also implement a new Downsview Area Secondary Plan .

    Apr 26, 2010 · 50 WILSON HEIGHTS BLVD

Lot facts

Area
3,049 m²
Frontage
54.3 mestimated, irregular lot
Depth
92.4 mestimated, irregular lot
Street
Ansford Ave
Corner lot
Yes, also on Goodwill Ave92.4 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Site and Area Specific Policy 387. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wilson. The lot is inside the Wilson Major Transit Station Area approved by the Province (Site and Area Specific Policy 712). Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 29 City trees in front of this lot. The City's street tree inventory lists 29 trees at this address: willow, black (87 cm), ash (33 cm), honey locust skyline (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%4 of 4 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
1
Development applications
13

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To alter the development standards for the mult-tower mixed use development, as approved under Site-Specific By-law No. 1514-2025, in order to permit an additional storey to Buildings A, B and C that are currently under construction, resulting in three 18-storey Towers, and to modify the bicycle parking requirements.

    50 WILSON HEIGHTS BLVD · Dec 10, 2026 · 32 m away
  • Zoning review

    Closed

    500 WILSON AVE · Oct 14, 2026 · 291 m away
  • Zoning review

    Notice Sent

    50 WILSON HEIGHTS BLVD · Sep 22, 2026 · 32 m away
  • Building permitdemolition

    Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

    24 GOODWILL AVE · Sep 8, 2026 · 124 m away
  • Building permitmultiplex, new building, new house

    Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

    24 GOODWILL AVE · Sep 8, 2026 · 124 m away
  • Building permitgarden suite

    Building a garden suite in the back yard

    24 GOODWILL AVE · Sep 4, 2026 · 124 m away
  • Building permit

    Proposed interior alterations. Scope of work includes partition walls, appliances and equipment, sinks, finish floor, walls, and ceiling - unit 33 (Nails Salon)

    500 WILSON AVE · Aug 18, 2026 · 291 m away
  • Building permit

    Proposal for multiple projects (one storey rear/side addition (with basement) and rear yard deck).

    4 MODEL AVE · Jun 11, 2026 · 280 m away
  • Building permit

    Proposed interior renovation (conversion from office to retail store).

    500 WILSON AVE · May 7, 2026 · 291 m away
  • Building permitsecondary suite

    Proposal to construct sunroom addition.

    9 MODEL AVE · Apr 28, 2026 · 215 m away

Neighbourhood: Clanton Park

About the area around the lot, not the lot itself.

Nearest station
Wilson Station3 min walk
Nearest TTC stop
Wilson Station - Northbound Platform2 min walk
Nearest cycling route
Faywood BlvdSharrows, 3 min walk
Nearest traffic count
7,936 vehicles in 8 hWilson Heights Blvd / Goodwill Ave, 80 m away, Feb 2, 2017
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Faywood Park3 min walk
Milton Berger Park5 min walk
Champlain Parkette8 min walk

Schools within 1 km

  • YESHIVA DARCHEI TORAH SCHOOL Private 6 min walk
  • FAYWOOD ARTS BASED CURRICULUM SCHOOL English Public 8 min walk
  • YESHIVA BNEI TZION OF BOBOV SCHOOL Private 8 min walk
  • ST MARGARET - BEATRICE CAMPUS AND BAYCREST PUBLIC English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClanton ParkMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home54%54%
Population (2021)17,62016,813
Homes built in 1960 or before25%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClanton ParkCity median
Assault584.1636.3
Robbery9569.5
Shootings4.710.5
Auto theft185.2192.6
Theft over $5,00090.246.1
Break and enter133172.8
Theft from vehicles194.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.