Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- Building permit18 159751Closed
Proposal to add a second domestic water line and isolation vales for the existing university building.
Jun 13, 2018 · 50 SUSSEX AVE - Building permit12 216971Closed
permit to install one back flow preventor in basement of existing university building
Aug 20, 2012 · 50 SUSSEX AVE - Building permit09 113337Closed
Proposal to replace and add new cooling tower in existing University of Toronto Chilling Plant. Northwest Chillers Plant. Convenience address - 55 Sussex Ave. _ (Structural modification at the roof )
Mar 9, 2009 · 50 SUSSEX AVE
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,913 m²
- Frontage
- 38.9 m
- Depth
- 49.7 m
- Street
- Sussex Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 879 m²roof up to 19.5 m
- Back yard
- 4.5 mhouse to rear lot line
- Side yards
- 0.2 m and 15.4 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: maple, norway (55 cm), honey locust (10 cm), kentucky coffeetree (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 97%28 of 29 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 3
- Multiplex permits
- 5
- Development applications
- 22
Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.
240 MAJOR ST · May 13, 2026 · 288 m away - Minor varianceApproved
To alter the existing three-storey semi-detached dwelling by constructing a two-storey addition (including a basement level) to a portion of the rear south wall. Also, to construct a rear second storey addition (enclosing the balcony into habitable space), and a rear third storey addition with a balcony. The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.
147 MAJOR ST · Apr 1, 2026 · 426 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front covered porch with stairs.
225 1/2 BORDEN ST · Feb 25, 2026 · 441 m away - Minor varianceApproved
To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).
356 HURON ST · Dec 10, 2025 · 183 m away - Minor varianceRefused
To alter the development standards (as approved under Site Specific By-law 750-2023) for the 12-storey apartment building by increasing building heights and gross floor area, and reducing building setbacks and amenity gross floor area. A related Site Plan Application (21 155930 STE 11 SA) is currently under review.
145 ST GEORGE ST · Sep 3, 2025 · 493 m away
Latest activity nearby
- Zoning review
Not Started
700 SPADINA AVE · Nov 24, 2026 · 70 m away - Zoning review
Application On Hold
356 HURON ST · Nov 12, 2026 · 183 m away - Building permit
Proposal to replace existing roof mounted life-safety natural gas emergency generator with a new outdoor life-safety natural gas generator.
341 BLOOR ST W · Nov 4, 2026 · 243 m away - Building permit
Proposed 3 storey entrance Addition to north elevation of existing Bissell Building. Addition to contain new accessible at-grade primary entrance, academic and office programed spaces and a new roof terrace. Scope of work includes renovations and alterations to existing Bissell Building levels 1 to 4 including new window openings at the ground level. The Project will also include landscaping.
130-140 ST GEORGE ST · Nov 2, 2026 · 264 m away - Building permit
Proposal to replace existing fire pump
140 ST GEORGE ST · Oct 29, 2026 · 244 m away - Building permit
Proposal for existing fire-pump replacement
120 ST GEORGE ST · Oct 29, 2026 · 295 m away - Building permit
Proposal for existing fire-pump replacement, replacement of all existing hose valves in every existing fire hose cabinet.
130 ST GEORGE ST · Oct 29, 2026 · 264 m away - Building permit
Proposal for installation of roof edge railings, roof mounted stair, fixed ladder and ladder port at TTC's Spadina Stn -Main Entrance
7 SPADINA RD · Oct 28, 2026 · 282 m away - Minor variancePending
To alter the development standards for the eight-storey residential apartment building (approved under Site Specific Zoning By-Laws 879-2009(OMB) and 880-2009(OMB)), increasing the height (from 25.5 m to 26.1 m), and reducing the rear projection (at the rear of the building at levels three to eight). A Site Plan Control application (File Number 20 20 162492 STE 11 SA) is currently under review. There will be a total of 16 residential dwelling units within the apartment building on this lot.
15 GLEN MORRIS ST · Oct 21, 2026 · 146 m away - Building permit
1 OVERHANGING STRUCTURE SIGN + 1 PROJECTING SIGN**SMASH BUDDY**
708 SPADINA AVE · Oct 13, 2026 · 68 m away
Neighbourhood: University
About the area around the lot, not the lot itself.
- Nearest station
- St George Station7 min walk
- Nearest TTC stop
- Spadina Ave at Sussex Ave1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 3 min walk
- Nearest traffic count
- 10,680 vehicles in 8 hSpadina Ave / Sussex Ave, 50 m away, Nov 15, 2011
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
- Parks
- Matt Cohen Park1 min walk
- Huron - Washington Parkette2 min walk
- Paul Martel Park4 min walk
Schools within 1 km
- UNIVERSITY OF TORONTO SCHOOLS Private 3 min walk
- PAUL PENNA DOWNTOWN JEWISH DAY SCHOOL & MILES NADAL JEWISH COMMUNITY CENTRE Private 3 min walk
- SCHOOL OF CONTINUING STUDIES - U OF T, BLDG 103 University 4 min walk
- ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 5 min walk
- HOWLETT ACADEMY SCHOOL Private 5 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | University | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 39% | 54% |
| Population (2021) | 6,435 | 16,813 |
| Homes built in 1960 or before | 59% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | University | City median |
|---|---|---|
| Assault | 1740.5 | 636.3 |
| Robbery | 133.9 | 69.5 |
| Homicide | 12.2 | 5.3 |
| Auto theft | 182.6 | 192.6 |
| Theft over $5,000 | 121.7 | 46.1 |
| Break and enter | 730.3 | 172.8 |
| Theft from vehicles | 353 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.