HousePrecheckCheck an address

50 Regent Park BlvdToronto · zoning, lot size and permit records

Also 205 Sackville St, 207 Sackville St, 209 Sackville St, 211 Sackville St, 213 Sackville St and 14 more

49.9 × 84.8 m4,155 m²on Regent Park Blvdcorner, also on St David St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 9 storeys, 155 rental units, built 2018More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 17 223825 (Proposal to install one mag lock on ground floor of existing apartment building, 2017, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
49.9 m frontage84.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 223825 (Proposal to install one mag lock on ground floor of existing apartment building, 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 197325 PRS 00 IR (Property Standards, 2026); 26 172234 000 00 IR (Adequate Heat, 2026); 26 172233 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (9 storeys, 155 units, built 2018).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • By-law investigation26 197325 PRS 00 IRClosed

    Property Standards

    Jul 7, 2026 · 50 REGENT PARK BLVD
  • By-law investigation26 172234 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 50 REGENT PARK BLVD
  • By-law investigation26 172233 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 50 REGENT PARK BLVD
  • Building permit17 223825Inspection

    Proposal to install one mag lock on ground floor of existing apartment building.

    Sep 13, 2017 · 50 REGENT PARK BLVD
  • Building permit16 254969Approved

    Alternative solution for standpipes and a hose system

    Nov 23, 2016 · 50 REGENT PARK BLVD
  • Building permit14 267277Cancelled

    Part Permit - Proposal to construct two 9 storey TCHC rental apartment buildings with, 155 residential units and 1 level of below grade parking. Convenience address - 581 Dundas St E (Regent Park Block 24 South)

    Jan 18, 2016 · 50 REGENT PARK BLVD
  • Development application14 133926 STE 13 SAClosed

    Proposal for Site Plan Control for the development of two mid-rise buildings that anchor the east (9 storeys) and west (9 storeys) side of the site. The two mid rise buildings connect by a row of two storey townhouse units which have no direct interior connection. There is a four storey podium that connects into the mid-rise building. Total development would consist of 18147m2 of residential gross floor area with a total of 155 rental units (15 - one bedroom, 33 - two bedroom, 107 - three or more bedrooms). There will be one level of below grade parking wich would accommodate 77 parking spaces and provision made to include bicycle parking throughout the space.

    Mar 26, 2014 · 50 REGENT PARK BLVD · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,155 m²
Frontage
49.9 m
Depth
84.8 m
Street
Regent Park Blvd
Corner lot
Yes, also on St David St84.8 m along it
Public lane
None
House footprint
1,093 m²
Back yard
3.6 mhouse to rear lot line
Side yards
0.1 m and 32.2 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: planetree, london (10 cm), planetree, london (10 cm), planetree, london (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
83%20 of 24 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
17

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 441 m away
  • Minor varianceApproved

    To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

    111 RIVER ST · Jan 28, 2026 · 381 m away
  • Minor varianceApproved

    To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

    131 RIVER ST · Oct 29, 2025 · 404 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

    325 GERRARD ST E · Oct 1, 2025 · 397 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.

    337 SACKVILLE ST · Mar 19, 2025 · 466 m away

Latest activity nearby

  • Zoning review

    Not Started

    480 SHUTER ST · Nov 19, 2026 · 219 m away
  • Building permit

    REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

    650 DUNDAS ST E · Nov 10, 2026 · 235 m away
  • Building permit

    A proposal to erect and display two wall signs and three window signs all displaying static copy..***TACO BELL***

    620 DUNDAS ST E · Nov 6, 2026 · 300 m away
  • Building permit

    Proposal to install new smoke alarms and monitoring modules to provide individual suite nnunciation on the fire alarm system.

    146 SUMACH ST · Oct 30, 2026 · 174 m away
  • Zoning review

    Closed

    650 DUNDAS ST E · Oct 29, 2026 · 235 m away
  • Zoning review

    Notice Sent

    20 REGENT ST · Oct 27, 2026 · 226 m away
  • Building permit

    Proposed one maglock to hallway door.

    465 DUNDAS ST E · Sep 4, 2026 · 295 m away
  • Zoning review

    Closed

    620 DUNDAS ST E · Aug 25, 2026 · 300 m away
  • Building permit

    The installation of two 5500 MBH condensing gas-fired boilers, one 1500 ton chiller and cooling towers, and ancillary equipment in the penthouse mechanical room. Additionally, the installation of pressure break heat exchangers in the P1 level, as well as distribution pumps and piping to interconnect with RPEI's existing district energy system.

    620 DUNDAS ST E · Aug 21, 2026 · 300 m away
  • Building permit

    The addition of office space (i.e. fit up) adjacent to the RPEI penthouse district energy centre, including washroom and kitchen.

    620 DUNDAS ST E · Aug 20, 2026 · 300 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station25 min walk
Nearest TTC stop
Dundas St East at Regent Park Blvd2 min walk
Nearest cycling route
Dundas St ECycle Track, 2 min walk
Nearest traffic count
6,456 vehicles in 8 hDundas St E / Sackville St, 120 m away, Mar 1, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 2 with cyclists
Parks
Regent Park Boulevard Park1 min walk
Regent Park2 min walk
Regent Park Athletic Grounds3 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 3 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 7 min walk
  • LIBERTY PREP SCHOOL Private 8 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 10 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.