HousePrecheckCheck an address

50 Panorama CrtToronto · zoning, lot size and permit records

Residential apartment commercial · RAC (f24.0; au67.0) (x96)≈ 299.2 × 87.8 m11,299 m²on Panorama Crt

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 19 storeys, 223 rental units, built 1976More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 145224 (Proposed complete localized concrete repairs within the garbage room (estimated concret..., 2026); 24 220297 (Proposal to reconstruct a portion of the slab in the underground parking garage of an e..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount OliveThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 299.2 m frontage≈ 87.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (65% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (54% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Environmentally Significant Area: Rowntree Mill Swamp

    Needs a closer look

    The lot touches an Environmentally Significant Area shown on Official Plan Map 12.

    What it means. Development in or next to the area needs an impact study and may be limited.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 12
  • 5 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 24 156425 (Structural impact damage restoration, 2024, status Permit Issued); 17 254574 (Proposed fire panel replacement, 2017, status Inspection); 16 140004 (To repair roof deck of an existing underground Parking Garge stucture, 2016, status Inspection); and 2 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (60% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 212479 ZON 00 IR (Zoning, 2026); 25 175731 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 145224 (Proposed complete localized concrete repairs within the garbage room (estimated concret..., 2026); 24 220297 (Proposal to reconstruct a portion of the slab in the underground parking garage of an e..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (19 storeys, 223 units, built 1976).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 212479 ZON 00 IRClosed

    Zoning

    Jul 31, 2026 · 50 PANORAMA CRT
  • Building permit26 145224Permit Issued

    Proposed complete localized concrete repairs within the garbage room (estimated concrete repair area = 10.5m2). Replace stairwell guards and handrails.

    May 22, 2026 · 50 PANORAMA CRT
  • By-law investigation25 175731 PRS 00 IRClosed

    Property Standards

    Jun 11, 2025 · 50 PANORAMA CRT
  • Building permit25 133862Closed

    Replace sprinkler system on p1 and p2

    Mar 31, 2025 · 50 PANORAMA CRT
  • Building permit24 220297Permit Issued

    Proposal to reconstruct a portion of the slab in the underground parking garage of an existing apartment building.

    Feb 3, 2025 · 50 PANORAMA CRT
  • Building permit24 156425Permit Issued

    Structural impact damage restoration

    Jul 17, 2024 · 50 PANORAMA CRT
  • Zoning review20 150011 ZPRClosed
    May 28, 2020 · 50 PANORAMA CRT
  • Zoning review19 182659 ZPRClosed
    Jul 4, 2019 · 50 PANORAMA CRT
Show 13 older records
  • Building permit18 164220Closed

    Proposal to erect and display one non-illuminated ground sign identifying the apartment building on the premises located on the westerly property frontage, displaying static copy and measuring 2.13 metres by 1.22 metres at a height of 2.44 metres. See assoicated Sign Variance Application No. 17-213254 (FP-17-00198).**HRPM RENTAL INQUIRIES**

    Jun 8, 2018 · 50 PANORAMA CRT
  • Building permit17 254574Inspection

    Proposed fire panel replacement

    Dec 15, 2017 · 50 PANORAMA CRT
  • Building permit17 254332Cancelled

    Proposal to erect and display one non-illuminated ground sign identifying the apartment building on the premises located on the westerly property frontage, displaying static copy and measuring 2.13 metres by 1.22 metres at a height of 2.44 metres already approved by variance No. 17-213254.**HRPM RENTAL INQUIRIES** **HILLTOP HEIGHTS**

    Nov 6, 2017 · 50 PANORAMA CRT
  • Zoning review17 213254 ZSVClosed
    Aug 9, 2017 · 50 PANORAMA CRT
  • Building permit16 140004Inspection

    To repair roof deck of an existing underground Parking Garge stucture.

    Apr 29, 2016 · 50 PANORAMA CRT
  • Building permit11 197400Closed

    Proposed repairs to concrete slab roof of existing parking garage at apartment building.

    Jun 15, 2011 · 50 PANORAMA CRT
  • Building permit11 208708Closed

    Proposed balcony and guard replacement to (108) balconies on the south side of the high-rise apartment building only.

    Jun 3, 2011 · 50 PANORAMA CRT
  • Building permit10 185188Inspection

    Underground parking garage intermediate slab reconstruction, repair and wateproofing.

    Jun 3, 2010 · 50 PANORAMA CRT
  • Building permit09 163125Closed

    1 Backflow preventor

    Sep 29, 2009 · 50 PANORAMA CRT
  • Building permit09 104295Inspection

    Repair to existing balconies (47) on the north elevation of a high-rise apartment building. The repair includes railing replacement.

    Feb 2, 2009 · 50 PANORAMA CRT
  • Building permit01 176817Closed

    HVAC to Interior alterations to penthouse + adding four antenas to roof - Apartment Bldg. HVAC included.

    Oct 12, 2001 · 50 PANORAMA CRT
  • Building permit01 176814Closed

    Interior alterations to penthouse + adding four antenas to roof - Apartment Bldg. HVAC included.

    Oct 12, 2001 · 50 PANORAMA CRT
  • Building permit98 083649Closed

    STORAGE TANKS TO ROOF OF APARTMENT BLDG.

    Sep 10, 1998 · 50 PANORAMA CRT

Check before you build

  • Site-specific exception 900.8.10(96)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(96)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Former City of Etobicoke By-law Nos. 1766 and 1805.

By-law 569-2013, Chapter 900

Lot facts

Area
11,299 m²
Frontage
299.2 mestimated, irregular lot
Depth
87.8 mestimated, irregular lot
Street
Panorama Crt
Corner lot
No
Public lane
None
House footprint
1,660 m²roof up to 61.4 m
Back yard
47.2 mhouse to rear lot line
Side yards
40.6 m and 182.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
20%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
  • Minimum frontage 24 m. Frontage is about 299.2 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RAC (f24.0; au67.0) (x96) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing storage space into seven new dwelling units. A total of 235 dwelling units will be provided as well as a new fitness room and multipurpose room.

    46 PANORAMA CRT · Nov 16, 2021 · 116 m away

Latest activity nearby

  • Building permit

    Proposed complete localized concrete repairs within the garbage room (estimated concrete repair area = 10.5m2). Replace stairwell guards and handrails.

    50 PANORAMA CRT · May 22, 2026 · 19 m away
  • Building permit

    Replace sprinkler system on p1 and p2

    50 PANORAMA CRT · Mar 31, 2025 · 19 m away
  • Building permitdemolition

    Building #15 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Mar 3, 2025 · 138 m away
  • Building permitdemolition

    Building #18 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 138 m away
  • Building permitdemolition

    Building #17 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 138 m away
  • Building permitdemolition

    Building #16 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 138 m away
  • Building permitdemolition

    Building #7 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 28, 2025 · 138 m away
  • Building permitdemolition

    Building #11 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 138 m away
  • Building permitdemolition

    Building #8 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 27, 2025 · 138 m away
  • Building permitdemolition

    Building #13 - Proposal for Demolition of nineteen buildings, including ten residence structures and nine institutional buildings, at the former Thistletown Regional Centre. Demolition is intended to clear land - no development is proposed as part of this project.

    51 PANORAMA CRT · Feb 26, 2025 · 138 m away

Neighbourhood: Mount Olive-Silverstone-Jamestown

About the area around the lot, not the lot itself.

Nearest station
Mount Olive Station10 min walk
Nearest TTC stop
Finch Ave West at Walkway to Farr Ave8 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 4 min walk
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Rowntree Mills Park1 min walk
Panorama Park3 min walk
Humberview Park4 min walk

Schools within 1 km

  • ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • BEAUMONDE HEIGHTS JR MDL SCHOOL English Public 10 min walk
  • NORTH ALBION COLLEGIATE INSTITUTE English Public 10 min walk
  • NORTH KIPLING JR MDL SCHOOL English Public 12 min walk
  • ALBION LINC English Public 15 min walk
  • VENERABLE JOHN MERLINI CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Olive-Silverstone-JamestownMedian neighbourhood
Median household income (2020)$76,500$84,500
Households that own their home46%54%
Population (2021)31,34516,813
Homes built in 1960 or before14%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Olive-Silverstone-JamestownCity median
Assault788.6636.3
Robbery107.369.5
Homicide2.95.3
Shootings20.310.5
Auto theft275.4192.6
Theft over $5,00026.146.1
Break and enter55.1172.8
Theft from vehicles130.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.