HousePrecheckCheck an address

50 Matilda StToronto · zoning, lot size and permit records

Also 2 Doris Anderson Crt, 45 Carroll St, 47 Carroll St, 49 Carroll St, 4 Doris Anderson Crt and 3 more

≈ 59.6 × 94.4 m2,878 m²on Munro Stcorner, also on Matilda Stbacks onto Doris Anderson Crt

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 56 rental units, built 2008More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 253541 (Install rooftop solar panels on top of flat roof, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 270415 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 59.6 m frontage≈ 94.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (22% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 270415 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 231255 (install backflow preventor, 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 10 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 249182 HEA 00 IR (Adequate Heat, 2026); 26 194850 PRS 00 IR (Property Standards, 2026); 26 159128 PRS 00 IV (Order Issued Property Standards: Exterior door not maintained weather-tight; Fail to ta..., 2026); and 7 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 253541 (Install rooftop solar panels on top of flat roof, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 56 units, built 2008).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 253541Permit Issued

    Install rooftop solar panels on top of flat roof.

    Nov 18, 2026 · 50 MATILDA ST
  • By-law investigation26 270415 PRS 00 IRRescheduled

    Property Standards

    Nov 16, 2026 · 50 MATILDA ST
  • By-law investigation26 249182 HEA 00 IRClosed

    Adequate Heat

    Oct 5, 2026 · 50 MATILDA ST
  • By-law investigation26 194850 PRS 00 IRClosed

    Property Standards

    Jul 2, 2026 · 50 MATILDA ST
  • By-law investigation26 159128 PRS 00 IVClosed

    Order Issued Property Standards: Exterior door not maintained weather-tight; Fail to take appropriate mitigation measures; Numbering size does not meet set back requirements - single family residential; Repair(s) does not reasonably match existing wall(s); The light standard(s) supporting artificial light is not kept in good repair and in good working order.; The ventilation system or unit is not kept in good repair and maintained in good working condition at all times.; The yards and /or other part of property is not being kept clean and free from accumulation of junk, rubbish, brush, refuse, litter, garbage and/or other debris

    May 6, 2026 · 50 MATILDA ST
  • By-law investigation26 155761 PRS 00 IRClosed

    Property Standards

    May 6, 2026 · 50 MATILDA ST
  • By-law investigation26 121498 PRS 00 IRClosed

    Property Standards

    Feb 25, 2026 · 50 MATILDA ST
  • By-law investigation26 119646 WST 00 IRClosed

    Waste

    Feb 22, 2026 · 50 MATILDA ST
Show 11 older records
  • By-law investigation26 113100 PRS 00 IRClosed

    Property Standards

    Feb 4, 2026 · 50 MATILDA ST
  • By-law investigation26 108729 HEA 00 IRClosed

    Adequate Heat

    Jan 24, 2026 · 50 MATILDA ST
  • By-law investigation26 111863 PRS 00 IVClosed

    Order Issued Property Standards: Floor and/or floor covering not kept free from holes, stains, rubbish and debris. Namely: missing panels from flooring in the living room.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials. Namely: wall near entry door not in good repair.

    Jan 21, 2026 · 50 MATILDA ST
  • By-law investigation26 107392 PRS 00 IRClosed

    Property Standards

    Jan 21, 2026 · 50 MATILDA ST
  • By-law investigation25 212083 WST 00 IRClosed

    Waste

    Aug 18, 2025 · 50 MATILDA ST
  • By-law investigation25 147774 PRS 00 IRClosed

    Property Standards

    Apr 23, 2025 · 50 MATILDA ST
  • Building permit21 234456Cancelled

    Adding an elevated, photo voltaic solar panel system to the existing roof structure of the 4 storeyresidential building and connecting to the existing electrical room.

    Nov 5, 2021 · 50 MATILDA ST
  • Zoning review21 167263 ZPRClosed
    Jun 8, 2021 · 50 MATILDA ST
  • Building permit20 125724Closed

    Repairs to the fire damages to the demising wall and window lintel

    May 7, 2020 · 50 MATILDA ST
  • Building permit19 254652Closed

    Proposal for a chiller replacement.

    Dec 23, 2019 · 50 MATILDA ST
  • Building permit14 231255Inspection

    install backflow preventor

    Nov 3, 2014 · 50 MATILDA ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,878 m²
Frontage
59.6 mestimated, irregular lot
Depth
94.4 mestimated, irregular lot
Street
Munro St
Corner lot
Yes, also on Matilda St94.4 m along it
Public lane
Doris Anderson Crt, 64.9 m along it
House footprint
1,195 m²roof up to 17.5 m
Back yard
1 mhouse to rear lot line
Side yards
6.8 m and 32.2 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    94%15 of 16 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    5
    Development applications
    13

    Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

      60 WASCANA AVE · Oct 14, 2026 · 370 m away
    • Minor varianceRefused

      To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

      45 BASEBALL PL · May 13, 2026 · 312 m away
    • Minor varianceApproved

      To construct a new two-storey detached rear ancillary building (containing one laneway suite), with a partially cantilevered (west) second storey, a covered (west) porch with stairs, and a side (north) second storey balcony. Also, to construct one rear parking space abutting the public lane. There will be a total of two residential dwelling units on this lot (one unit occupying the existing two-and-one-half-storey townhouse main dwelling and one unit occupying the ancillary building).

      25 GRANT ST · Apr 1, 2026 · 365 m away
    • Minor varianceApproved

      To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

      111 RIVER ST · Jan 28, 2026 · 373 m away
    • Minor varianceApproved

      To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

      131 RIVER ST · Oct 29, 2025 · 403 m away

    Latest activity nearby

    • Zoning review

      Not Started

      9 DAVIES AVE · Nov 23, 2026 · 211 m away
    • Building permit

      Proposal to add and relocate sprinklers and fire hose cabinets within Shoppers Drug Mart #9490.

      661 QUEEN ST E · Nov 23, 2026 · 268 m away
    • Building permit

      Foundation Wall Underpinning

      685 QUEEN ST E · Nov 20, 2026 · 293 m away
    • Building permit

      Install rooftop solar panels on top of flat roof.

      50 MATILDA ST · Nov 18, 2026 · 22 m away
    • Zoning review

      Not Started

      7 LABATT AVE · Oct 21, 2026 · 295 m away
    • Development application

      Official Plan and Zoning By-law Amendment application for two 46-storey residential buildings containing approximately 1,170 dwelling units and a 2-storey non-residential building containing 1,111 square metres of non-residential space.

      5 DEFRIES ST · Sep 30, 2026 · 260 m away · City file
    • Building permit

      Proposal to replace front porch with new.

      157 MUNRO ST · Sep 29, 2026 · 264 m away
    • Zoning review

      Notice Sent

      12 KINTYRE AVE · Sep 28, 2026 · 279 m away
    • Building permit

      Revision 1: Proposal for interior alterations to an existing retail store - "Shoppers Drug Mart"

      661 QUEEN ST E · Sep 28, 2026 · 268 m away
    • Building permit

      HVAC permit required to close out Plumbing Permit.Related 26-155352 BLD 00 BA

      632 QUEEN ST E · Sep 25, 2026 · 234 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest station
    Broadview Station31 min walk
    Nearest TTC stop
    Dundas St East at Broadview Ave4 min walk
    Nearest cycling route
    Dundas St ECycle Track, 3 min walk
    Nearest traffic count
    601 vehicles in 8 hMatilda St / Carroll St / Joel Weeks Park Trl, 40 m away, Nov 22, 2022
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 3 with cyclists
    Parks
    Joel Weeks Park1 min walk
    Thompson Street Parkette3 min walk
    Riverside Common Park4 min walk

    Schools within 1 km

    • QUEEN ALEXANDRA MDL SCHOOL English Public 5 min walk
    • SEED ALTERNATIVE SCHOOL English Public 5 min walk
    • DUNDAS JR PUBLIC SCHOOL English Public 7 min walk
    • NELSON MANDELA PARK PUBLIC SCHOOL English Public 11 min walk
    • EASTDALE COLLEGIATE INSTITUTE English Public 11 min walk
    • INGLENOOK COMMUNITY SCHOOL English Public 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.