HousePrecheckCheck an address

50 Leigh StToronto · zoning, lot size and permit records

78.0 × 170.5 m12,141 m²on Leigh Stcorner, also on McCormack St

Not a home

Harwood Public School

The City's school locations place Harwood Public School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 06 151720 (Interior alterations to an existing school, room 21, 2006, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
78.0 m frontage170.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2006

    Needs a closer look

    Still open in the City's records: 06 151720 (Interior alterations to an existing school, room 21, 2006, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit18 115851Closed

    Proposal for window replacements , rebuilding a parapet and demolishing part of a coal bunker/storage room (underground) and construction of new foundation wall.

    Mar 21, 2018 · 50 LEIGH ST
  • Building permit16 205212Closed

    Installation of a rooftop photovoltaic array on an existing building

    Aug 25, 2016 · 50 LEIGH ST
  • Building permit11 220421Closed

    To install 1 Backflow Prevention Device to Public Elementary School to ground floor level - in a water meter room.

    Jul 4, 2011 · 50 LEIGH ST
  • Building permit06 151720Inspection

    Interior alterations to an existing school, room 21.

    Jul 24, 2006 · 50 LEIGH ST
  • Building permit02 160504Closed

    BOILER REPLACEMENT

    Aug 6, 2002 · 50 LEIGH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
12,141 m²
Frontage
78 m
Depth
170.5 m
Street
Leigh St
Corner lot
Yes, also on McCormack St170.5 m along it
Public lane
None
House footprint
1,256 m²roof up to 12.9 m
Back yard
120.7 mhouse to rear lot line
Side yards
4.1 m and 10 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%15 of 15 decisions
    Garden suite permits
    1
    Laneway suite permits
    1
    Multiplex permits
    1
    Development applications
    2

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a second storey addition above the existing detached garage. The altered garage will be converted into a garden suite.

      20 BLAKLEY AVE · May 28, 2026 · 475 m away
    • Minor varianceApproved

      To construct an ancillary structure (shed) in the rear yard.

      130 SPEARS ST · Feb 12, 2026 · 238 m away
    • Minor varianceApproved

      To legalize and to maintain a second and third storey addition above the existing dwelling and the conversion into a duplex dwelling. This application is being considered as a new duplex dwelling.

      39 SENECA AVE · Oct 9, 2025 · 443 m away
    • Minor varianceApproved

      To legalize and to maintain the existing Entertainment Place of Assembly.

      131 MC CORMACK ST · Jul 10, 2025 · 86 m away
    • Minor varianceApproved

      To construct a new detached dwelling. The existing detached garage in the rear yard will be maintained.

      22 FELTHAM AVE · Aug 1, 2024 · 124 m away

    Latest activity nearby

    • Building permit

      Proposal for conversion of five side windows into five sectional overhead garage doors.

      115 MC CORMACK ST · Oct 16, 2026 · 186 m away
    • Building permit

      Revision to - sealing an existing basement window in the laundry room areaProposal for interior alterations to main floor and basement, including plumbing and drain.

      2 HILLDALE RD · Oct 5, 2026 · 232 m away
    • Building permitmultiplex

      Proposal to legalize and maintain the 3 unit semi dwelling.See also 22 212670 ZAP

      111 CAYUGA AVE · Sep 17, 2026 · 269 m away
    • Building permit

      Proposal for removing an exterior wall at rear and adding new windows, patio door. New roof over the rear patio

      140 SPEARS ST · Jul 29, 2026 · 272 m away
    • Building permit

      Proposal to remove an exterior wall at rear and add new windows and patio door. New roof over the rear patio.

      140 SPEARS ST · Jun 19, 2026 · 272 m away
    • Building permit

      Proposal for alterations to dwelling due to fire damage.

      114 LEIGH ST · Apr 17, 2026 · 166 m away
    • Minor varianceApproved

      To construct an ancillary structure (shed) in the rear yard.

      130 SPEARS ST · Feb 12, 2026 · 238 m away
    • Zoning review

      Closed

      115 MC CORMACK ST · Oct 24, 2025 · 186 m away
    • Building permit

      Proposal for interior alterations to basement.

      2 HILLDALE RD · Oct 14, 2025 · 232 m away
    • Building permit

      Replace interior waterproofing, install deltawrap, weeping tile, and sump pump. Replace plumbing to basement bathroom, replace support beam in basement. Finish basement with laundry room, bathroom, utility room, and rec room. Increase front window. Add wall to main floor bedroom.

      2 HILLDALE RD · Sep 30, 2025 · 232 m away

    Neighbourhood: Rockcliffe-Smythe

    About the area around the lot, not the lot itself.

    Nearest station
    Mount Dennis Station26 min walk
    Nearest TTC stop
    Humber Blvd at Cliff St8 min walk
    Nearest cycling route
    Lavender Creek TrlMulti-Use Trail, 2 min walk
    Nearest traffic count
    449 vehicles in 8 hFeltham Ave / Spears St, 130 m away, Sep 10, 2003
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Harwood Park2 min walk
    Cayuga Park5 min walk
    Black Creek Site East5 min walk

    Schools within 1 km

    • HARWOOD PUBLIC SCHOOL English Public 1 min walk
    • IQRA NEJASHI ISLAMIC SCHOOL Private 2 min walk
    • ST OSCAR ROMERO CATHOLIC SECONDARY SCHOOL English Separate 8 min walk
    • SANTA MARIA CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
    • CORDELLA JR PUBLIC SCHOOL English Public 13 min walk
    • FRANK OKE SECONDARY SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRockcliffe-SmytheMedian neighbourhood
    Median household income (2020)$69,000$84,500
    Households that own their home56%54%
    Population (2021)22,23516,813
    Homes built in 1960 or before45%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRockcliffe-SmytheCity median
    Assault742.7636.3
    Robbery74.769.5
    Shootings16.610.5
    Auto theft157.7192.6
    Theft over $5,00037.346.1
    Break and enter132.8172.8
    Theft from vehicles224188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.