HousePrecheckCheck an address

50 High Park AveToronto · zoning, lot size and permit records

68.8 × 29.8 m2,024 m²on High Park Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 25 storeys, 264 rental units, built 2021More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 5 development applications open within 300 m, up to 30 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
68.8 m frontage29.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards, Zoning): 26 171808 000 00 IR (Adequate Heat, 2026); 26 171807 000 00 IR (Property Standards, 2026); 25 130753 ZON 00 IR (Zoning, 2025); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 30 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (25 storeys, 264 units, built 2021).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 171808 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 50 HIGH PARK AVE
  • By-law investigation26 171807 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 50 HIGH PARK AVE
  • By-law investigation25 130753 ZON 00 IRClosed

    Zoning

    Mar 18, 2025 · 50 HIGH PARK AVE
  • By-law investigation24 248606 HEA 00 IRClosed

    Adequate Heat

    Dec 9, 2024 · 50 HIGH PARK AVE
  • By-law investigation24 246962 PRS 00 IRClosed

    Property Standards

    Dec 4, 2024 · 50 HIGH PARK AVE
  • Zoning review20 141347 ZSVCancelled
    May 1, 2020 · 50 HIGH PARK AVE
  • Development application16 115443 WET 13 SAClosed

    Proposed development of two 25-storey (rental) apartment buildings containing 528 units in conjunction with two existing 20-storey (rental) apartment buildings. Two existing blocks of townhouses are to be demolished

    Feb 10, 2016 · 52-66 HIGH PARK AVE · City file
  • Development application13 101816 WET 13 OZClosed

    This address covers 51 - 77 Quebec Avenue and 40 - 66 High Park Avenue. Propose to remove (2) blocks of townhouses and construct (2) new residential use only apartment buildingsof Bldg A and B and a (2) storey amenity block building. (2) existing residential apartment towers to remain.

    Jan 7, 2013 · 52-66 HIGH PARK AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,024 m²
Frontage
68.8 m
Depth
29.8 m
Street
High Park Ave
Corner lot
No
Public lane
None
House footprint
527 m²
Back yard
0 mhouse to rear lot line
Side yards
3.2 m and 35.2 mhouse to side lot lines
Buildings on the lot
7house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ash, green marshall's seedless (29 cm), oak, white (15 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
91%20 of 22 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
6
Development applications
10

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.

    61 PINE CREST RD · Aug 12, 2026 · 300 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 107-2015(OMB)), for the existing 11-storey mixed-use building, by permitting clinic and office uses (physician(s) and healthcare practitioner(s)), to be located on a portion of the first level. There is a total of 104 residential dwelling units on this lot.

    1990 BLOOR ST W · Aug 12, 2026 · 362 m away
  • Minor varianceRefused

    To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.

    61 PINE CREST RD · Aug 12, 2026 · 300 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing a front second and third storey addition, and a rear third storey addition. Also, to construct a rear covered basement walkout extension, and to enlarge the rear ground floor covered deck with stairs, currently under construction with a building permit (No. 26 100682 BLD 00 SR), at the southwest corner of the dwelling.

    140 QUEBEC AVE · Aug 5, 2026 · 193 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey detached dwelling by constructing front and rear third storey additions (dormers), a rear third storey balcony, and a rear ground floor deck with stairs. Also, to permit and maintain the existing front one storey addition (front porch enclosure). The existing rear one-storey ancillary building (garage/storage) will be altered within the limits of the zoning by-law(s).

    165 HIGH PARK AVE · Jun 3, 2026 · 418 m away

Latest activity nearby

  • Building permit

    Proposal for interior alterations throughout detached SFD.

    161 PACIFIC AVE · Nov 16, 2026 · 299 m away
  • Building permit

    GARAGE ROOF SLAB REPAIRS

    299 GLENLAKE AVE · Nov 10, 2026 · 172 m away
  • Building permit

    Proposal for interior alterations within the basement, ground and second floor

    161 PACIFIC AVE · Oct 23, 2026 · 299 m away
  • Building permit

    B1/P1 Level Sanitary Drainage Headers/Stacks Offsets Replacement. The scope of work includes piping replacement within the B1 level as well as a section of pipe within the underground garage.

    50 QUEBEC AVE · Oct 23, 2026 · 169 m away
  • Building permit

    Plumbing - Renovation of the existing condo unit. Reconfiguring kitchen and laundry machine; renovating thebathrooms; transforming a tub into a shower.

    50 QUEBEC AVE · Oct 13, 2026 · 169 m away
  • Building permit

    Deferred Fees from folder 22 242061 (RSN-5211408) ZoningProcess RSN 72030215

    111 PACIFIC AVE · Sep 30, 2026 · 201 m away
  • Building permit

    Deferred Fees from folder 22 241802 (RSN-5211094) ZoningProcess RSN 72029985

    111 PACIFIC AVE · Sep 30, 2026 · 201 m away
  • Building permit

    Proposal for a front deck with a shade structure

    350 GLENLAKE AVE · Sep 29, 2026 · 204 m away
  • Consent (lot split)Refused

    To obtain consent to sever the property into two residential lots.

    61 PINE CREST RD · Aug 12, 2026 · 300 m away
  • Minor varianceRefused

    To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.

    61 PINE CREST RD · Aug 12, 2026 · 300 m away

Neighbourhood: High Park North

About the area around the lot, not the lot itself.

Nearest station
High Park Station5 min walk
Nearest TTC stop
High Park Ave at Glenlake Ave3 min walk
Nearest cycling route
High Park AveSharrows, 1 min walk
Nearest traffic count
5,782 vehicles in 14 hGlenlake Ave / High Park Ave, 180 m away, May 28, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
Parks
Bennett Park3 min walk
High Park4 min walk
Parkview Gardens Parkette5 min walk

Schools within 1 km

  • KEELE ST JR SCHOOL English Public 7 min walk
  • HUMBERSIDE COLLEGIATE INSTITUTE English Public 10 min walk
  • THE STUDENT SCHOOL English Public 10 min walk
  • WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 11 min walk
  • URSULA FRANKLIN ACADEMY English Public 11 min walk
  • ANNETTE ST JR SR & HIGH PARK ALTERNATIVE JR English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHigh Park NorthMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home33%54%
Population (2021)21,85516,813
Homes built in 1960 or before38%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHigh Park NorthCity median
Assault677.9636.3
Robbery43.169.5
Homicide3.95.3
Shootings3.910.5
Auto theft74.5192.6
Theft over $5,00027.446.1
Break and enter133.2172.8
Theft from vehicles152.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.