Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2016
Needs a closer lookStill open in the City's records: 16 109777 (Site srevicing permit for water and sanitary connections for a new "Spalsh Pad" at an e..., 2016, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 24 252430 NNY 18 OZ (OPA & Rezoning to permit the redevelopment of the subject site with a 46-storey (152.55..., 2024).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- By-law investigation25 153898 ELS 00 IRClosed
Election Signs
May 5, 2025 · 50 HENDON AVE - Development application24 252430 NNY 18 OZOMB Appeal
OPA & Rezoning to permit the redevelopment of the subject site with a 46-storey (152.55-metre) purpose built rental apartment building, comprised of a 6- storey podium element and a 40-storey tower element, containing a total of 433 rental dwelling units. The proposal will have a gross floor area of approximately 30,696 square metres, resulting in a density equivalent to 22.9 times the gross area of the subject site.
Dec 20, 2024 · 36 HENDON AVE · City file - Building permit16 109777Inspection
Site srevicing permit for water and sanitary connections for a new "Spalsh Pad" at an existing park - Hendon Park
Feb 19, 2016 · 50 HENDON AVE
Lot facts
- Area
- 35,040 m²
- Frontage
- 185.6 mestimated, irregular lot
- Depth
- 340.7 mestimated, irregular lot
- Street
- Eldora Ave
- Corner lot
- Yes, also on Hendon Ave340.7 m along it
- Public lane
- None
- House footprint
- 211 m²roof up to 4.9 m
- Back yard
- 88.6 mhouse to rear lot line
- Side yards
- 62.9 m and 102.2 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Finch. The lot is inside the Finch Major Transit Station Area approved by the Province (Site and Area Specific Policy 727). Source
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 16 City trees in front of this lot. The City's street tree inventory lists 16 trees at this address: elm, siberian (68 cm), oak, bur (43 cm), oak, bur (41 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 86%6 of 7 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 14
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposal for complete demolition and removal of five (5) vacant 1-storey single-family detached residential dwellings located at 40, 42, 44, 46, and 48 Hendon Avenue, including all associated foundations, accessory structures, and utility disconnections. Demolition is required to facilitate the future construction of a proposed 14-storey purpose-built rental building (Site Plan Control File No. 26 179698 NNY 18 SA).
46 HENDON AVE · Nov 6, 2026 · 78 m away - Zoning review
Closed
28 KENSINGTON AVE · Nov 3, 2026 · 145 m away - Zoning review
Notice Sent
28 KENSINGTON AVE · Nov 3, 2026 · 145 m away - Building permit
Complete demolition and removal of a vacant 1-storey single-family detached dwelling at 42 Hendon Avenue, including all associated foundations, accessory structures, and utility disconnections. Demolition is required to facilitate the future construction of a proposed 14-storey purpose-built rental building.
42 HENDON AVE · Nov 3, 2026 · 97 m away - Building permit
Complete demolition and removal of a vacant 1-storey single-family detached dwelling at 48 Hendon Avenue, including all associated foundations, accessory structures, and utility disconnections. Demolition is required to facilitate the future construction of a proposed 14-storey purpose-built rental building.
48 HENDON AVE · Nov 2, 2026 · 71 m away - Building permit
Complete demolition and removal of a vacant 1-storey single-family detached dwelling at 44 Hendon Avenue, including all associated foundations, accessory structures, and utility disconnections. Demolition is required to facilitate the future construction of a proposed 14-storey purpose-built rental building.
44 HENDON AVE · Nov 2, 2026 · 86 m away - Building permit
Complete demolition and removal of five (5) vacant 1-storey single-family detached residential dwellings located at 40, 42, 44, 46, and 48 Hendon Avenue, including all associated foundations, accessory structures, and utility disconnections. Demolition is required to facilitate the future construction of a proposed 14-storey purpose-built rental building (Site Plan Control File No. 26 179698 NNY 18 SA).
40 HENDON AVE · Nov 2, 2026 · 107 m away - Building permit
INSTALL BACK WATER VALVE
55 HENDON AVE · Oct 19, 2026 · 111 m away - Building permit
Proposal to convert Single Family dwelling to Triplex.
119 HENDON AVE · Oct 1, 2026 · 254 m away - Building permit
Proposal for replacement of pit hatch and ladder at TTC's Finch Substation.
24 HENDON AVE · Sep 14, 2026 · 218 m away
Neighbourhood: Newtonbrook West
About the area around the lot, not the lot itself.
- Nearest station
- Finch Station8 min walk
- Nearest TTC stop
- Finch Ave West at Greenview Ave5 min walk
- Nearest cycling route
- Finch Corridor TrlMulti-Use Trail, 1 min walk
- Nearest traffic count
- 5,640 vehicles in 14 hEldora Ave / Hendon Ave / Hendon Park Trl, 90 m away, Nov 25, 2025
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- Hendon Park1 min walk
- Beecroft Linear Park5 min walk
- Fairchild Parkette7 min walk
Schools within 1 km
- TFS Private 7 min walk
- R J LANG ELEMENTARY & MDL SCHOOL English Public 9 min walk
- ST CYRIL CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
- DARYK HIGH Private 10 min walk
- DREWRY SECONDARY SCHOOL English Public 10 min walk
- MONSEIGNEUR DE CHARBONNEL CATHOLIC SECONDARY SCHOOL French Separate 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Newtonbrook West | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $79,000 | $84,500 |
| Households that own their home | 50% | 54% |
| Population (2021) | 23,805 | 16,813 |
| Homes built in 1960 or before | 18% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Newtonbrook West | City median |
|---|---|---|
| Assault | 710.6 | 636.3 |
| Robbery | 94.5 | 69.5 |
| Auto theft | 442.2 | 192.6 |
| Theft over $5,000 | 75.6 | 46.1 |
| Break and enter | 192.8 | 172.8 |
| Theft from vehicles | 253.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.