HousePrecheckCheck an address

50 Heath St ERosedale-Moore Park, Toronto · City records before you offer

Residential · R (d0.6) (x922)9.2 × 40.3 m368 m²on Heath St E

1 thing to check before you offer, including records mention garden suite, multiplex, second unit
N20 m
9.2 m frontage40.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 50 Heath St E

50 Heath St E is on a 9.2 m by 40.3 m lot on Heath St E in Rosedale-Moore Park. The zoning is R. A site-specific exception, 900.2.10(922), changes some of the usual rules for this address.

The City has 11 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Revision 01 - minor revision to site plan.proposal to convert existing garage into garden suite". Status: closed. In 2024, a Committee of Adjustment application was filed: "To alter the existing two-storey ancillary building (semi-detached garage in the rear yard) by constructing a rear partial second storey addition. this…". Status: closed. In 2023, a building permit was filed: "Rev 01: changes to building/addition length and third floor terrace". Status: closed. Nothing on file is open right now.

Within 300 m, 5 development applications are open (the tallest up to 13 storeys). St. Clair station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Records mention garden suite, multiplex, second unitModerateFree check
  • Site-specific exception 900.2.10(922)Moderate
  • 5 development applications open within 300 mLowFree check
  • Yonge-St. Clair Secondary PlanLow
  • 4 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Records mention garden suite, multiplex, second unit
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Records mention garden suite, multiplex, second unit

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 4 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

11 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-08-20Building permit
24 248510
Revision 01 - Minor revision to site plan.Proposal to convert existing garage into garden suiteClosed
2024-10-16Minor variance
A0719/24TEY
To alter the existing two-storey ancillary building (semi-detached garage in the rear yard) by constructing a rear partial second storey addition. This building will be converted into one garden suite (containing an integral garage, and habitable space on the first and second levels). There will be a total of two residential dwelling units on this lot (one dwelling unit within the main house and one dwelling unit within the ancillary building).Approved
2024-07-31Zoning review
24 191356 ZAP
No description on fileClosed
2023-02-02Building permit
22 155208
Rev 01: Changes to building/addition length and third floor terraceClosed
2022-07-27Minor variance
A0436/22TEY
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition with front and rear terraces, a partial fourth storey addition with a front terrace, and a front covered porch and stairs.Approved
2022-06-10Building permit
21 124082
Rev 01: change to layout, underpinning added to basement alterationsClosed
2022-03-11Zoning review
22 122179 ZAP
No description on fileClosed
2008-07-23Consent (lot split)
B0102/08TEY
To create an easement/right-of-way for the purpose of extending the existing mutual driveway located between No. 50 and 52 Heath Street East. Easement/Right-of-Way - Part 1, Draft R-Plan 50 Heath Street East Part 1 will be subject to an easement/right-of-way in favour of 52 Heath Street East for the purpose of extending the existing mutual driveway located between 50 and 52 Heath Street East. Part 1 has a width of 1.829 m and a depth of 13.184 m and an area of 24.11 m2. Approved
2001-07-25Building permit
01 134796
Demolish and build semi-detached garage at rear.see c. of a. decision (refer to bp 01-134783 for plans of garage, 52 Heath st E.)Closed
2001-04-03Minor variance
A0059/01TO
Construct a semi-detached garage and storage structure at the rear of the property. The garage and storage structure will have dimensions of approximately 8.99 by 6.30 metres and a floor area of approximately 56.65 square metres.Approved
2001-01-09Zoning review
01 101510 000
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(922)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(922)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Yonge-St. Clair Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(922)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: multiplex, garden suite, second unit
  • No public lane, so no laneway suite

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
9.2 m frontage40.3 m deepon Heath St E
Zone
R (d0.6) (x922)
Height limit
13 m
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
108 m²
Back yard
20.1 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 6 units

    On record

    Already permitted: 21 124082 (closed).

  • Secondary suite

    On record

    Already permitted: 21 124082 (closed).

  • Garden suite

    On record

    Already permitted: 24 248510 (closed).

  • Laneway suite

    Not possible

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 5 development applications open within 300 m, up to 13 storeys
  • In the St Clair station area
  • 8 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 5 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime above median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 1 of 6 categories
  • Break and enter: 2.6 times the Toronto median
  • Assault: 1.7 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Rosedale-Moore Park neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$122,000median $84,500
Households that own their home58%median 54%
Population (2021)20,080median 16,813
Homes built in 1960 or before46%median 29%
Homes needing major repairs6%median 7%

Getting around and schools

  • St. Clair StationNearest station5 min walk
  • Yonge St at Heath St EastNearest TTC stop3 min walk
  • Yonge StNearest cycling route3 min walk
  • Deer Park Jr & Sr Public SchoolSchool2 min walk
  • The York School - Jr CampusSchool4 min walk
  • The Linden SchoolSchool8 min walk
  • The York School - Mdl and Sr CampusSchool11 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31080.4
  • Robberycity median 69.586.8
  • Auto theftcity median 192.6199.6
  • Theft over $5,000city median 46.165.1
  • Break and entercity median 172.8455.6
  • Theft from vehiclescity median 188.1182.2

More about Rosedale-Moore Park

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 50 Heath St E

1 thing to check at 50 Heath St E before you offer

  • Records mention garden suite, multiplex, second unitModerate
  • Site-specific exception 900.2.10(922)Moderate
  • 5 development applications open within 300 mLow
  • Yonge-St. Clair Secondary PlanLow
  • and 1 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 5 steps to take before you offer, so nothing slips
  • What each of the 5 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.