HousePrecheckCheck an address

50 Gerrard St EToronto · zoning, lot size and permit records

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x2017)≈ 53.0 × 62.1 m2,382 m²on Church Stcorner, also on Gerrard St E

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 12 storeys, 188 rental units, built 2007More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: B0039/26TEY (To obtain consent to sever a portion of stratified land (air-rights at-and-above an ele..., 2026); 22 227434 STE 13 SA (Site Plan application for a new 43-storey mixed-use building on the subject site. The e..., 2022); 22 227435 STE 13 OZ (Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 9 development applications open within 300 m, up to 85 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • City upkeep score: 98 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WellesleyThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
≈ 53.0 m frontage≈ 62.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: B0039/26TEY (To obtain consent to sever a portion of stratified land (air-rights at-and-above an ele..., 2026); 22 227434 STE 13 SA (Site Plan application for a new 43-storey mixed-use building on the subject site. The e..., 2022); 22 227435 STE 13 OZ (Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A1001/23TEY (To alter the development standards for a residential building approved under Site Speci..., 2024); A0907/12TEY (To change the use of a portion of the west ground floor from residential amenity space..., 2013); SYS 3269139 (ERROR - PLEASE DELETE, 2012).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 85 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 98 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (12 storeys, 188 units, built 2007).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

24 records on file: more than at 100% of Toronto houses (median 0).

  • Consent (lot split)B0039/26TEYPending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    Nov 25, 2026 · 50 GERRARD ST E
  • Zoning review26 137512 LTOClosed
    Apr 1, 2026 · 50 GERRARD ST E
  • By-law investigation25 153883 ELS 00 IRClosed

    Election Signs

    May 5, 2025 · 50 GERRARD ST E
  • Building permit23 215673Closed

    PROPOSAL: To replace existing baseboard radiators with new VRF heat pump system throughout the building. Existing air handling unit on roof will be replaced. Additional outdoor VRF units will be added on roof. New refrigerant piping on exterior of building will be clad in the same EIFS stucco facade material as existing building.

    Feb 26, 2024 · 50 GERRARD ST E
  • Minor varianceA1001/23TEYApproved

    To alter the development standards for a residential building approved under Site Specific Zoning By-law 1070-2004(OLT) by updating the mechanical systems (including new rooftop enclosed elements and conduit risers at exterior facade of building), which requires modification of the exterior cladding to extend approximately 140 mm beyond the existing cladding.

    Jan 31, 2024 · 50 GERRARD ST E
  • Development application22 227434 STE 13 SAUnder Review

    Site Plan application for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that existing student residence being demolished to accommodate the proposed new building. The redevelopment proposes 463 dwelling units, resulting in a total gross floor area (GFA) of 28,998 sq. m., a total of 28,782 sq. m. of residential GFA, and a total of 216 sq. m of retail GFA.

    Nov 8, 2022 · 50 GERRARD ST E · City file
  • Development application22 227435 STE 13 OZAppeal Received

    Zoning By-law and Official Plan amendment for a new 43-storey mixed-use building on the subject site. The existing 8-and-12-storey student residence will be retained on the subject site, with the northern-most bay of the northern 8-storey portion of that existing student residence being demolished to accommodate the proposed new building. The redevelopment proposes 463 dwelling units, resulting in a total gross floor area (GFA) of 28,998 sq. m., a total of 28,782 sq. m. of residential GFA, and a total of 216 sq. m of retail GFA.

    Nov 8, 2022 · 50 GERRARD ST E · City file
  • Building permit19 218712Closed

    REV01: Revision to permit 19-218712 BLD. Proposal for interior alterations to convert existing storage rooms into bicycle parking rooms.Proposal for interior alterations: garbage room on ground floor to be converted to be a room for bicycle parking spaces

    Feb 4, 2020 · 50 GERRARD ST E
Show 16 older records
  • Building permit14 236338Closed

    Installation of sprinkler system.

    Oct 27, 2014 · 50 GERRARD ST E
  • Building permit14 163488Closed

    To erect and display one illuminated wall sign with static copy. **Steak & Cheese Factory**

    Jul 3, 2014 · 50 GERRARD ST E
  • Building permit14 157447Closed

    Proposal to construct interior alterations to the ground floor unit 103 to complete tenant fit up for a take out restaurant. Note related base build permit is 14-134245.

    Jun 20, 2014 · 50 GERRARD ST E
  • Building permit14 134245Closed

    To complete interior alterations to the existing multi-use building to allow for a base building fit up for a future restaurant tenant. Note: This is soley for base work. The future tenant will have to apply for a building permit to complete interior alterations to open the restaurant.

    May 15, 2014 · 50 GERRARD ST E
  • Zoning review14 125423 LTOClosed
    Mar 6, 2014 · 50 GERRARD ST E
  • Minor varianceA0907/12TEYApproved

    To change the use of a portion of the west ground floor from residential amenity space to a commercial takeout restaurant of 69 m² in the existing 12-storey apartment building.

    Feb 6, 2013 · 50 GERRARD ST E
  • Minor varianceSYS 3269139Pending

    ERROR - PLEASE DELETE

    Dec 18, 2012 · 50 GERRARD ST E
  • Zoning review12 226537 ZPRClosed
    Aug 9, 2012 · 50 GERRARD ST E
  • Building permit11 304943Closed

    Alter portion of ground floor for creation of 1 additonal dwelling unit, 3 bedroom unit, in place of existing bicycle storage facility. The existing bicycle facility is to be relocated elsewhere on the ground floor and as shown on plans.

    Nov 14, 2011 · 50 GERRARD ST E
  • Building permit11 163781Closed

    This is for the installation of a BELL telecommunications cabinet and antennae on the roof of this apartment building.

    Apr 29, 2011 · 50 GERRARD ST E
  • Zoning review07 264543 ZPRClosed
    Sep 25, 2007 · 50 GERRARD ST E
  • Building permit06 180136Closed

    To install a new sprinkler system and standpipe to a new apartment building

    Oct 19, 2006 · 50 GERRARD ST E
  • Building permit05 133340Closednew building

    Construct new 12-storey apartment building; (187 Dwelling units) in connection with permit #05-131995 DEM.

    Jul 20, 2006 · 50 GERRARD ST E
  • Building permit05 131995Closeddemolition

    Demolish detached apartment building consisting of 28 dwelling units..

    Mar 13, 2006 · 50 GERRARD ST E
  • Zoning review03 200299 PSPClosed
    Dec 12, 2003 · 50 GERRARD ST E
  • Building permit97 012487Closed

    CARRY OUT REMEDIAL WORK TO COMPLY WITH THE RETROFIT PROVISIONS OF THE FIRE CODE. /LM

    Jan 24, 1997 · 50 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(2017)

    Needs a closer look

    2 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2017)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  2. Rule B

    On the lands, the minimum front yard or side yard setback from a lot line abutting Church St. is 2.5 metres. [TO: 438-86; 12(2) 286]

  3. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 260 of former City of Toronto By-law 438-86

  5. Older by-law C

    On 50 Gerrard St. E., City of Toronto by-law 1070-04.

By-law 569-2013, Chapter 900

Lot facts

Area
2,382 m²
Frontage
53 mestimated, irregular lot
Depth
62.1 mestimated, irregular lot
Street
Church St
Corner lot
Yes, also on Gerrard St E62.1 m along it
Public lane
None
House footprint
1,351 m²
Back yard
0.6 mhouse to rear lot line
Side yards
0 m and 0.5 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
13house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 151. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 3.0 (c2.0; r3.0) SS1 (x2017) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust skyline (70 cm), honey locust (14 cm), honey locust (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
94%15 of 16 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
2
Development applications
21

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 360 m away
  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 473 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1017-2022), for the 53-storey mixed-use building, by reducing the non-residential space, and the number of short-term bicycle parking spaces required on-site. There will be a total of 591 residential dwelling units on this site. This is currently under the review of Site Plan Control (File No. 21 206338 STE 13 SA).

    241 CHURCH ST · Jul 30, 2025 · 408 m away
  • Minor varianceApproved

    To alter the existing three-storey apartment building (containing 35 rental dwelling units) by converting the basement level (storage rooms and building management office) and a portion of the ground floor (vacant space) into an additional 11 rental dwelling units. There will be a total of 46 rental dwelling units on this lot.

    134 CARLTON ST · Jul 9, 2025 · 450 m away
  • Minor varianceApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    145 MUTUAL ST · Feb 26, 2025 · 261 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 16 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 261 m away
  • Building permit

    1 Wall Sign***** T-DOT DENTAL*****

    306 JARVIS ST · Nov 17, 2026 · 282 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 36 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 36 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 70 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 70 m away
  • Building permitsecondary suite

    Interior alteration, second floor additional unit

    27 MCGILL ST · Oct 27, 2026 · 149 m away
  • Zoning review

    Closed

    27 CARLTON ST · Oct 26, 2026 · 202 m away
  • Zoning review

    Closed

    30 CARLTON ST · Oct 20, 2026 · 234 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
College Station4 min walk
Nearest TTC stop
Carlton St at Church St3 min walk
Nearest cycling route
Gerrard St ECycle Track, 1 min walk
Nearest traffic count
8,027 vehicles in 8 hGerrard St E: Victoria St - Church St, 60 m away, Feb 17, 2005
Serious collisions within 500 m
152021–2026, killed or seriously injured: 2 fatal, 10 with pedestrians, 4 with cyclists
Parks
Joseph Sheard Parkette3 min walk
Toronto Metropolitan University Square4 min walk
College Park4 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 1 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 3 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
  • LE COLLEGE FRANCAIS - CARLTON CAMPUS Private 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.