HousePrecheckCheck an address

50 Fairfax CresToronto · zoning, lot size and permit records

68.6 × 118.7 m7,510 m²on Fairfax Cres

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 15 126347 (Proposed construction of full-height wall to divide recreational area into 2, increasin..., 2015, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
N50 m
68.6 m frontage118.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2015

    Needs a closer look

    Still open in the City's records: 15 126347 (Proposed construction of full-height wall to divide recreational area into 2, increasin..., 2015, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit19 209335Closed

    INTERIOR ALTERATIONS FOR COMMUNITY LIVING TORONTO

    Sep 11, 2019 · 50 FAIRFAX CRES
  • Building permit15 126347Inspection

    Proposed construction of full-height wall to divide recreational area into 2, increasing height of wall surrounding arts & crafts area, and new sink in existing institutional building.

    May 15, 2015 · 50 FAIRFAX CRES

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,510 m²
Frontage
68.6 m
Depth
118.7 m
Street
Fairfax Cres
Corner lot
No
Public lane
None
House footprint
3,923 m²roof up to 7.6 m
Back yard
15.4 mhouse to rear lot line
Side yards
4.7 m and 6.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    7

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new building with Electronic Gaming and Bingo Hall uses on the site. Cross reference related Site Plan Application File No. 2024 240873 ESC 20 SA.

      756 WARDEN AVE · Sep 9, 2026 · 403 m away
    • Minor varianceApproved

      To alter the existing one-storey detached dwelling by constructing a two-storey addition at the rear and north side of the existing dwelling and a new front porch.

      6 FAIRFAX CRES · Apr 8, 2026 · 324 m away
    • Minor varianceApproved

      To alter the development standards for the 9-storey mixed-use building by increasing the maximum permitted number of dwelling units, reducing the minimum required floor area of commercial uses required at grade and reducing the minimum required parking supply for commercial and restaurant uses. Cross-reference Site Plan Control Application 22 24108 ESC 20 and previous Minor Variance Application A0171/21SC.

      743 WARDEN AVE · Jul 9, 2025 · 307 m away
    • Minor varianceRefused

      To construct a new building with Electronic Gaming and Bingo Hall uses on the site. A previous minor variance application was approved to construct a new one storey industrial condominium (A0269/22SC). Cross reference related Site Plan Application File No. 2021 197589 ESC 20 SA. This application was previously deferred at the November 2023 & January 2024 hearing.

      756 WARDEN AVE · Apr 3, 2024 · 403 m away
    • Minor varianceApproved

      To construct a six storey Dymon Storage Centre. A Site Plan Approval application has been received for this property (File # SA). This property was also subject to previous Committee of Adjustment hearings. Cross-Reference previous applications A0287/20SC, A0286/20SC, A0171/21SC and B020/10SC.

      743 WARDEN AVE · Jun 28, 2023 · 307 m away

    Latest activity nearby

    • Building permit

      Proposal for site development (landscaping, grading, retaining wall) to accomodate 35-40 people during ceremony), pergola/shade structure.

      3276 ST CLAIR AVE E · Sep 17, 2026 · 291 m away
    • Building permit

      Proposal for interior alterations for new dental office - UNIT 2Convenience address is 735 Warden Ave

      725 WARDEN AVE · Sep 16, 2026 · 278 m away
    • Building permit

      Proposal to install maglock locking devices as per the electrical drawings.

      61 FAIRFAX CRES · Aug 18, 2026 · 137 m away
    • Building permit

      Proposal for a door widening at 3rd and 4th floors, B Wing

      3276 ST CLAIR AVE E · Jul 14, 2026 · 291 m away
    • Development application

      Draft Plan of Condominium for 211 units

      743 WARDEN AVE · Apr 14, 2026 · 290 m away · City file
    • Zoning review

      Closed

      720-726 WARDEN AVE · Jul 25, 2025 · 167 m away
    • Zoning review

      Cancelled

      4 MONASTERY LANE · Feb 21, 2025 · 127 m away
    • Building permitsecondary suite

      REV - Reviosn are relocation of walkout stair, kitchen and bed room Proposed below grade entrance and basement 2nd unit to the existing house

      20 MONASTERY LANE · Oct 18, 2024 · 185 m away
    • Building permit

      REVISION - revised locationfor the DCW line complete with new shaft wall outside of Stairwell 208Relocation of assembly kitchen and gym

      3276 ST CLAIR AVE E · Oct 17, 2024 · 291 m away
    • Building permit

      Proposal for interior alterations - washroom renovations

      3276 ST CLAIR AVE E · Aug 2, 2024 · 291 m away

    Neighbourhood: Clairlea-Birchmount

    About the area around the lot, not the lot itself.

    Nearest station
    Warden Station11 min walk
    Nearest TTC stop
    Warden Ave at Fairfax Cres3 min walk
    Nearest cycling route
    Gus Harris TrlMulti-Use Trail, 10 min walk
    Nearest traffic count
    20,886 vehicles in 14 hWarden Ave / Deans Dr / Fairfax Cres, 200 m away, Sep 24, 2025
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Clairlea Park2 min walk
    Warden Hilltop Community Centre Park6 min walk
    Geco Park8 min walk

    Schools within 1 km

    • SATEC AT W A PORTER COLLEGIATE INSTITUTE English Public 3 min walk
    • GENERAL BROCK PUBLIC SCHOOL English Public 14 min walk
    • ST JOACHIM CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
    • CLAIRLEA PUBLIC SCHOOL English Public 14 min walk
    • OUR LADY OF FATIMA CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureClairlea-BirchmountMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home64%54%
    Population (2021)26,84016,813
    Homes built in 1960 or before39%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleClairlea-BirchmountCity median
    Assault1303.8636.3
    Robbery4969.5
    Shootings9.810.5
    Auto theft287.6192.6
    Theft over $5,0008546.1
    Break and enter189.5172.8
    Theft from vehicles290.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.