HousePrecheckCheck an address

50 Emblem CrtToronto · zoning, lot size and permit records

Employment · EH 0.7 (x30)≈ 193.7 × 82.0 m11,130 m²on Emblem Crt

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 15 168416 (TO ADD SOLAR ROOF GENERATION TO THE EXISTING INDUSTRIAL BUILDING OF 300KWAC MAXIMUM RATING, 2015, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • Major Transit Station Area: AgincourtThe City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 193.7 m frontage≈ 82.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (21% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2015

    Needs a closer look

    Still open in the City's records: 15 168416 (TO ADD SOLAR ROOF GENERATION TO THE EXISTING INDUSTRIAL BUILDING OF 300KWAC MAXIMUM RATING, 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (37% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A059/05SC (The owner proposes to expand the existing recycling facility to include a 566.4 square..., 2005).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit20 205869Closed

    To erect and display one illuminated wall sign with first party static copy measuring 0.71 meters by 5.18 meters at the height of 3.26 meters from the grade. ****Y.M. YEUNG TRADING CO. LTD.****

    Oct 22, 2020 · 50 EMBLEM CRT
  • Building permit15 168416Permit Issued

    TO ADD SOLAR ROOF GENERATION TO THE EXISTING INDUSTRIAL BUILDING OF 300KWAC MAXIMUM RATING.

    Jul 9, 2015 · 50 EMBLEM CRT
  • Zoning review10 304859 ZPUClosed
    Nov 29, 2010 · 50 EMBLEM CRT
  • Zoning review10 212845 ZALCancelled
    Jul 6, 2010 · 50 EMBLEM CRT
  • Building permit10 212850Cancelled

    interior alterations to existing warehouse/office, construction of new mezzanine, interior alterations NO EXTERIOR WORK (E.O., Aug12/10)

    Jul 6, 2010 · 50 EMBLEM CRT
  • Building permit10 143299Closed - Dormant

    Enlarge 2 loading bay doors and 2 man doors

    May 21, 2010 · 50 EMBLEM CRT
  • Zoning review10 108160 ZALClosed
    Jan 22, 2010 · 50 EMBLEM CRT
  • Building permit05 150028Closed

    2 door lintels and retaining wall

    Jun 27, 2005 · 50 EMBLEM CRT
Show 8 older records
  • Building permit05 132658Closed

    expand retail component of Goodwill see C of A, final & binding

    Jun 6, 2005 · 50 EMBLEM CRT
  • Building permit05 130218Cancelled

    INSTALL DOUBLE DOORS AT NEW COMPACTOR AND NEW POURED CONCRETE ON GRADE RETAINING WALL

    May 9, 2005 · 50 EMBLEM CRT
  • Minor varianceA059/05SCApproved

    The owner proposes to expand the existing recycling facility to include a 566.4 square metre (6,096.9 square feet) retail space for the resale of the recyclable goods. In order to permit the proposed ancillary retail space the owner is seeking relief from the Zoning By-law's allowable gross floor area and maximum percentage permitted for the proposed ancillary retail space.

    Apr 20, 2005 · 50 EMBLEM CRT
  • Building permit05 110117Closed

    Goodwill store, being relocated from Jaarvis St., small retail area

    Apr 12, 2005 · 50 EMBLEM CRT
  • Zoning review05 113546 ZPRClosed
    Mar 7, 2005 · 50 EMBLEM CRT
  • Building permit04 184341Closed

    install 2 loading doors

    Oct 25, 2004 · 50 EMBLEM CRT
  • Building permit00 346609Closed

    SCRAP PAPER COLLECTION, EXTERIOR COMPACTOR SYSTEM

    Nov 7, 2000 · 50 EMBLEM CRT
  • Building permit00 327862Closed

    RENOVATE WASHROOMS, GENERAL OFFICE AND PRODUCTION OFFICE Plumber-"seven star"-John-416-606-3852

    Sep 11, 2000 · 50 EMBLEM CRT

Check before you build

  • Site-specific exception 900.22.10(30)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(30)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The basements of all buildings must be a minimum of 1.8 metres above the invert of the West Branch of the Highland Creek

  2. Rule B

    Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

  3. Older by-law A

    The basements of all buildings must be a minimum of 1.8 metres above the invert of the West Branch of the Highland Creek

  4. Older by-law B

    Despite regulation 60.30.20.10(1) the following uses are not permitted: Asphalt Plant; Hazardous substance manufacturing, processing or warehousing; Abattoir, Slaughterhouse or Rendering of Animals Factory; and Waste Transfer Station . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
11,130 m²
Frontage
193.7 mestimated, irregular lot
Depth
82 mestimated, irregular lot
Street
Emblem Crt
Corner lot
No
Public lane
None
House footprint
4,793 m²roof up to 10.8 m
Back yard
16.2 mhouse to rear lot line
Side yards
10.6 m and 74.9 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Agincourt. The lot is inside the Agincourt Major Transit Station Area approved by the Province (Site and Area Specific Policy 694). Source
  • Agincourt Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone EH 0.7 (x30) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Zoning review

    Closed

    2370 MIDLAND AVE · Oct 8, 2026 · 211 m away
  • Building permit

    Proposal for ground and first floor public areas and lobby alterations.

    2035 KENNEDY RD · Oct 30, 2025 · 289 m away
  • Building permit

    Proposal for guest rooms interior renovation of the West Wing

    2035 KENNEDY RD · Jun 27, 2025 · 289 m away
  • Building permit

    Proposed - Fire Alarm Retrofit - Addition of Mag-locks and the replacement and new installations of manual pull stations.

    125 VILLAGE GREEN SQ · Jun 18, 2025 · 188 m away
  • Building permit

    Proposal for commercial kitchen ventilation and fire suppression systems

    2370 MIDLAND AVE · Jun 2, 2025 · 211 m away
  • Building permit

    Proposal for interior alterations from the 2nd to the 15th floor guest rooms of an existing hotel - East Wing Tower

    2035 KENNEDY RD · May 21, 2025 · 289 m away
  • Zoning review

    Closed

    2370 MIDLAND AVE · Jan 11, 2024 · 211 m away
  • Building permit

    Proposal for interior alterations to existing warehouse to create a washroom.

    60 EMBLEM CRT · Jun 26, 2023 · 152 m away
  • Building permit

    Proposed construction of an engineered retaining wall, required to hold up the road at the loading dock of the Ksquare project. This retaining wall butts up against the foundation wall of the Ksquare project but has its own independent footing for support and is designed to be self supporting.

    2035 KENNEDY RD · Aug 10, 2022 · 289 m away
  • Zoning review

    Closed

    2035 KENNEDY RD · Mar 3, 2022 · 289 m away

Neighbourhood: Agincourt South-Malvern West

About the area around the lot, not the lot itself.

Nearest station
Agincourt GO Station12 min walk
Nearest TTC stop
Midland Ave at Emblem Crt5 min walk
Nearest traffic count
13,361 vehicles in 8 hMidland Ave / Goodland Gt, 320 m away, Apr 15, 2009
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Metrogate Park3 min walk
335 Village Green Square Park5 min walk
Collingwood Park8 min walk

Schools within 1 km

  • UNIQUE CHINESE SCHOOL - MIDLAND CAMPUS Private 14 min walk
  • AGINCOURT MONTESSORI SCHOOL Private 14 min walk
  • ENQUIRING MINDS MONTESSORI AND LONDON SCHOOL OF DANCE Private 15 min walk
  • MAPLE LEAF COLLEGIATE SCHOOL Private 15 min walk
  • CANADA INTERNATIONAL COLLEGE SCHOOL Private 15 min walk
  • BLUE GENE EDUCATION SCHOOL Private 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt South-Malvern WestMedian neighbourhood
Median household income (2020)$79,500$84,500
Households that own their home70%54%
Population (2021)24,17016,813
Homes built in 1960 or before10%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt South-Malvern WestCity median
Assault467636.3
Robbery94.869.5
Homicide75.3
Shootings21.110.5
Auto theft273.9192.6
Theft over $5,00038.646.1
Break and enter259.9172.8
Theft from vehicles242.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.