HousePrecheckCheck an address

50 Earl StToronto · zoning, lot size and permit records

Residential · R (d2.0) (x504)23.5 × 24.1 m565 m²on Earl Stcorner, also on Sherbourne St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 22 rental units, built 1993More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 14 development applications open within 300 m, up to 69 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
23.5 m frontage24.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 266069 PRS 00 IR (Property Standards, 2026); 26 223221 PRS 00 IV (Order Issued Property Standards: Dwelling unit is not connected by two way voice commun..., 2026); 26 220477 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0630/21TEY (To convert a semi-enclosed storage area on the ground floor of the existing apartment b..., 2021); SYS 4927587 (2021); A0600/20TEY (To convert a semi-enclosed storage area on the ground floor to a commercial kitchen, 2020).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 22 units, built 1993).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 266069 PRS 00 IRClosed

    Property Standards

    Nov 5, 2026 · 50 EARL ST
  • By-law investigation26 223221 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit is not connected by two way voice communication system and security locking release mechanism to the principle entrance of the building.Namely, th

    Aug 16, 2026 · 50 EARL ST
  • By-law investigation26 220477 PRS 00 IRClosed

    Property Standards

    Aug 16, 2026 · 50 EARL ST
  • By-law investigation26 146128 GRA 00 IRClosed

    Graffiti

    Apr 17, 2026 · 50 EARL ST
  • Building permit21 148865Closed

    Revision to Plumbing - hot water tank relocated in mechanical room, sump pump addition, drainage layout revised, fire protection plan revised, sprinklers in food processing room changed from dry to wet sprinklers - Homes First Society

    Jun 9, 2023 · 50 EARL ST
  • Minor varianceA0630/21TEYApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    Sep 15, 2021 · 50 EARL ST
  • Minor varianceSYS 4927587Pending
    May 17, 2021 · 50 EARL ST
  • Zoning review21 129698 ZZCClosed
    Mar 20, 2021 · 50 EARL ST
Show 5 older records
  • Minor varianceA0600/20TEYApproved

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    Dec 4, 2020 · 50 EARL ST
  • Building permit20 136174Closed

    PROPOSAL FOR AN INSTALLATION OF A DCVA BACKFLOW PREVENTER

    Jun 12, 2020 · 50 EARL ST
  • Zoning review20 106875 ZPRClosed
    Jan 21, 2020 · 50 EARL ST
  • Building permit17 275530Cancelled

    Installation of 2" backflow preventor for premise isolation.

    Dec 14, 2017 · 50 EARL ST
  • Building permit17 107853Cancelled

    Proposal to install a 2" back flow preventor.

    Jan 23, 2017 · 50 EARL ST

Check before you build

  • Site-specific exception 900.2.10(504)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(504)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
565 m²
Frontage
23.5 m
Depth
24.1 m
Street
Earl St
Corner lot
Yes, also on Sherbourne St24.1 m along it
Public lane
None
House footprint
423 m²roof up to 19.4 m
Back yard
3.9 mhouse to rear lot line
Side yards
0 m and 1.8 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
18 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.0) (x504) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: elm, siberian (27 cm), tree of heaven (18 cm), elm, siberian (17 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
28

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey office building with a third storey roof terrace.

    555 BLOOR ST E · Aug 30, 2023 · 395 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.

    50 EARL ST · Sep 15, 2021 · 2 m away
  • Minor varianceApproved

    To construct new rear exterior stairs and add the use "Rooming House".

    600 PARLIAMENT ST · Jul 22, 2021 · 459 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 414 m away
  • Minor varianceApproved

    To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.

    50 EARL ST · Dec 4, 2020 · 2 m away

Latest activity nearby

  • Building permit

    Proposal for interior alteration to fit the nails salon

    4 HOWARD ST · Oct 30, 2026 · 293 m away
  • Building permit

    Replacement of existing fire damaged balcony railings and repair of existing balconies for unit 2307 & 2407.

    375 BLEECKER ST · Oct 30, 2026 · 208 m away
  • Building permit

    Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

    666 ONTARIO ST · Oct 16, 2026 · 206 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    37 LINDEN ST · Oct 9, 2026 · 203 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units

    29 LINDEN ST · Oct 9, 2026 · 199 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    574 SHERBOURNE ST · Oct 9, 2026 · 188 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    572 SHERBOURNE ST · Oct 9, 2026 · 181 m away
  • Building permit

    Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.

    570 SHERBOURNE ST · Oct 9, 2026 · 176 m away
  • Building permit

    Construct a 61 storey market rental tower, with 4 levels of below grade parking. Proposed rental unit count is 716 units.Scope: to alter Designated Heritage houses in accordance with building design and Heritage Conservation Plan for integration with main tower.

    576 SHERBOURNE ST · Oct 9, 2026 · 196 m away
  • Zoning review

    Closed

    209 WELLESLEY ST E · Oct 8, 2026 · 273 m away

Neighbourhood: North St.James Town

About the area around the lot, not the lot itself.

Nearest station
Sherbourne Station6 min walk
Nearest TTC stop
Sherbourne St at Earl St North Side1 min walk
Nearest cycling route
Sherbourne StCycle Track, 1 min walk
Nearest traffic count
8,127 vehicles in 14 hSherbourne St / Earl St, 30 m away, Jan 31, 2024
Serious collisions within 500 m
92021–2026, killed or seriously injured: 1 fatal, 6 with pedestrians, 2 with cyclists
Parks
Wellesley - Magill Park2 min walk
St. James Town West Park3 min walk
Bleecker Parkette6 min walk

Schools within 1 km

  • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 2 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 3 min walk
  • ROSE AVENUE JR PUBLIC SCHOOL English Public 5 min walk
  • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 6 min walk
  • WINCHESTER JR & SR PUBLIC SCHOOL English Public 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth St.James TownMedian neighbourhood
Median household income (2020)$59,200$84,500
Households that own their home11%54%
Population (2021)18,53516,813
Homes built in 1960 or before19%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth St.James TownCity median
Assault1281.6636.3
Robbery76.969.5
Shootings4.310.5
Auto theft85.4192.6
Theft over $5,00038.446.1
Break and enter153.8172.8
Theft from vehicles136.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.