HousePrecheckCheck an address

50 Cabernet CrclToronto · zoning, lot size and permit records

Open space · OR132.2 × 138.6 m15,763 m²on Cabernet Crcl

Not a home

Royal Crest Park

The City of Toronto's real estate inventory lists Royal Crest Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
132.2 m frontage138.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    15,763 m²
    Frontage
    132.2 m
    Depth
    138.6 m
    Street
    Cabernet Crcl
    Corner lot
    No
    Public lane
    None
    House footprint
    388 m²roof up to 5.1 m
    Back yard
    94.2 mhouse to rear lot line
    Side yards
    26.8 m and 80.3 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
    • 12 City trees in front of this lot. The City's street tree inventory lists 12 trees at this address: alder, european (10 cm), buckeye, ohio (9 cm), hazel, turkish (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Proposal to repair metal hangar. Install a new I beam building footprint- replace the damaged Quonset and construct an adjoining steel structure, identified on the drawings as the Building to restore this area back to operation.

      35 LEADING RD · Nov 4, 2026 · 205 m away
    • Zoning review

      Notice Sent

      27 ST EMILION WAY · Nov 2, 2026 · 208 m away
    • Building permit

      Proposal to construct a deck at the rear yard and an unenclosed covered shed.

      9 BAROLO RD · Aug 28, 2026 · 245 m away
    • Building permit

      REV 01: Revision to permit # 26 151219 BLD 00 SR - Change in LVL -B Length & Addition of LVL -CProposal to remove load bearing wall on main floor

      9 BAROLO RD · Aug 6, 2026 · 245 m away
    • Building permitsecondary suite

      Proposed addition to an existing building and creation of second dwelling unit in the basement (secondary suite)

      143 CABERNET CRCL · Mar 27, 2026 · 286 m away
    • Minor varianceApproved

      To construct a one storey rear and side addition to the existing dwelling.

      143 CABERNET CRCL · Feb 26, 2026 · 286 m away
    • Building permit

      Proposal for new steel structure for storage area to be rebuilt replacing damaged one. 190 sq.m. area of new structure.

      31 LEADING RD · Jan 6, 2026 · 190 m away
    • Building permitsecondary suite

      Interior alterations to accommodate a secondary suite in the basement, window to be enlarged

      16 ST EMILION WAY · May 29, 2025 · 194 m away
    • Zoning review

      Closed

      53 GUIDED CRT · Dec 19, 2023 · 252 m away
    • Zoning review

      Cancelled

      75 CABERNET CRCL · Nov 24, 2023 · 230 m away

    Neighbourhood: West Humber-Clairville

    About the area around the lot, not the lot itself.

    Nearest station
    Stevenson Station30 min walk
    Nearest TTC stop
    Royalcrest Rd at Cabernet Cir3 min walk
    Nearest traffic count
    3,570 vehicles in 8 hRoyalcrest Rd / Cabernet Crcl, 200 m away, Jun 23, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Royal Crest Park1 min walk
    Plowshare Park11 min walk
    Colony Park12 min walk

    Schools within 1 km

    • MONSIGNOR JOHN CORRIGAN CATHOLIC ELEMENTARY SCHOOL English Separate 2 min walk
    • HOPE ACADEMY Private 9 min walk
    • ST ANGELA CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
    • JOHN D PARKER JR SCHOOL English Public 12 min walk
    • CLAIREVILLE JR SCHOOL English Public 12 min walk
    • SMITHFIELD MDL SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWest Humber-ClairvilleMedian neighbourhood
    Median household income (2020)$92,000$84,500
    Households that own their home65%54%
    Population (2021)33,30016,813
    Homes built in 1960 or before13%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWest Humber-ClairvilleCity median
    Assault933636.3
    Robbery152.469.5
    Homicide2.75.3
    Shootings26.710.5
    Auto theft1320.6192.6
    Theft over $5,000245.946.1
    Break and enter347.5172.8
    Theft from vehicles545.4188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.