Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2016
Needs a closer lookStill open in the City's records: 23 190605 (Proposal to install a backflow preventor in an existing warehouse, 2023, status Inspection); 14 268817 (Interior alterations to existing warehouse/manufacuring space into warehouse/office spa..., 2016, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A098/02NY (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2002).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- Building permit23 190605Inspection
Proposal to install a backflow preventor in an existing warehouse.
Sep 19, 2023 · 50-52 ARROW RD - Building permit14 268817Permit Issued
Interior alterations to existing warehouse/manufacuring space into warehouse/office space on ground floor only.
Nov 22, 2016 · 50-52 ARROW RD - Zoning review12 236143 ZZCCancelledAug 27, 2012 · 50-52 ARROW RD
- Zoning review08 202520 LPRClosedSep 11, 2008 · 50-52 ARROW RD
- Zoning review08 181288 LPRClosedJul 14, 2008 · 50-52 ARROW RD
- Zoning review08 178117 ZPUClosedJul 4, 2008 · 50-52 ARROW RD
- Zoning review07 254153 ZPUClosedAug 17, 2007 · 50-52 ARROW RD
- Zoning review07 182608 ZPUClosedApr 30, 2007 · 50-52 ARROW RD
Show 1 older records
- Minor varianceA098/02NYApproved
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a one storey addition attached to the rear of the existing building and a one storey addition attached to the east of the existing building.
May 2, 2002 · 50-52 ARROW RD
Lot facts
- Area
- 9,916 m²
- Frontage
- 112.5 mestimated, irregular lot
- Depth
- 122.5 mestimated, irregular lot
- Street
- Gail Grv
- Corner lot
- Yes, also on Arrow Rd122.5 m along it
- Public lane
- None
- House footprint
- 5,188 m²roof up to 7.9 m
- Back yard
- 6.1 mhouse to rear lot line
- Side yards
- 9 m and 32.7 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone EH 1.0 (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
- Building permit
Proposed interior alterations for existing office on ground floor and mezzanine floor
64 ARROW RD · Nov 20, 2026 · 217 m away - Building permit
Proposal for the installation of a rooftop 321kW-DC solar photovoltaic system at Univar Solutions,
64 ARROW RD · Aug 31, 2026 · 217 m away - Building permit
Part Permit - Proposed two-phase expansion to the exiting industrial facility with an approximate gross floor area of 5700 sqm. Scope includes construction of a new addition with loading docks and doors, mezzanine levels, freezer and cooler room, designated alcohol concentrated storage room, chemical storage room, and retail storefront, along with associated structural, mechanical, electrical, and life safety system.
24 ARROW RD · Apr 23, 2026 · 197 m away - Building permit
Demolition of one-storey steel-clad workshop located at 30 Arrow Road and one-storey brick building located at 24 Arrow Road. Demolition includes removal of building envelope, structural framing, slabs, foundations, and footings. See 25 144000 WET 07 SA for future development.
24 ARROW RD · Feb 27, 2026 · 197 m away - Zoning review
Applicable Law Pending
10 GAIL GRV · Feb 19, 2026 · 56 m away - Building permit
Proposal to demolish the 1.5 storey storage building.See 25 144000 WET 07 SA for future development.
28 ARROW RD · Jan 29, 2026 · 149 m away - Zoning review
Closed
28 ARROW RD · Dec 5, 2025 · 149 m away - Minor varianceApproved
To construct a two-storey south side addition.
24 ARROW RD · Jul 10, 2025 · 197 m away - Development application
Phased Site Plan Control application to construct a two-storey warehouse addition to the existing industrial building. Phase 1 will have a GFA of 2,410m² and Phase 2 will have a GFA of 3,294m². The total GFA, including the existing industrial building, will be 10,780m².
30 ARROW RD · Apr 14, 2025 · 106 m away · City file - Zoning review
Applicable Law Pending
28 ARROW RD · Dec 10, 2024 · 149 m away
Neighbourhood: Humbermede
About the area around the lot, not the lot itself.
- Nearest station
- Signet Arrow Station27 min walk
- Nearest TTC stop
- Arrow Rd at Gail Grove South Side2 min walk
- Nearest cycling route
- Humber River Recreational TrlMulti-Use Trail, 16 min walk
- Nearest traffic count
- 15,310 vehicles in 14 hBartor Rd / Arrow Rd, 190 m away, Oct 15, 2025
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- Silvio Colella Park11 min walk
- Joseph Bannon Park11 min walk
- Humber Sheppard Park13 min walk
Schools within 1 km
- ST JUDE CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- GULFSTREAM PUBLIC SCHOOL English Public 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Humbermede | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $77,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 16,955 | 16,813 |
| Homes built in 1960 or before | 22% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Humbermede | City median |
|---|---|---|
| Assault | 990.9 | 636.3 |
| Robbery | 71.5 | 69.5 |
| Shootings | 15.3 | 10.5 |
| Auto theft | 439.2 | 192.6 |
| Theft over $5,000 | 71.5 | 46.1 |
| Break and enter | 168.5 | 172.8 |
| Theft from vehicles | 112.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.