Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterBuilding permit open since 2020
Needs a closer lookStill open in the City's records: 15 217416 (Proposal for store front modification as per approved building pert 11-101197 NB, 2020, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)9 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Notice Issued Adequate Heat, Property Standards, Zoning): 26 187782 PRS 00 IR (Property Standards, 2026); 26 144587 ZON 00 IR (Zoning, 2026); 26 125703 PRS 00 IR (Property Standards, 2026); and 6 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 Committee of Adjustment files on this lot
Good to know2 approved. A0751/14TEY (To alter the redevelopment plan for a 48-storey condominium mixed-use building with 539..., 2014); A0602/02TEY (This proposal also includes No. 10 Phipps Street and 9, 15 St. Nicholas Street and is s..., 2003).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)24 development applications open within 300 m
Good to know24 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 76 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
43 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 187782 PRS 00 IRClosed
Property Standards
Jun 19, 2026 · 5 ST JOSEPH ST - By-law investigation26 144587 ZON 00 IRClosed
Zoning
Apr 15, 2026 · 5 ST JOSEPH ST - By-law investigation26 125703 PRS 00 IRClosed
Property Standards
Mar 6, 2026 · 5 ST JOSEPH ST - By-law investigation26 121175 ZON 00 IRClosed
Zoning
Feb 25, 2026 · 5 ST JOSEPH ST - By-law investigation25 122883 HEA 00 IVClosed
Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.
Feb 27, 2025 · 5 ST JOSEPH ST - By-law investigation25 122464 HEA 00 IRClosed
Adequate Heat
Feb 27, 2025 · 5 ST JOSEPH ST - By-law investigation25 115868 ZON 00 IRClosed
Zoning
Feb 11, 2025 · 5 ST JOSEPH ST - By-law investigation24 252854 HEA 00 IRClosed
Adequate Heat
Dec 22, 2024 · 5 ST JOSEPH ST
Show 35 older records
- By-law investigation24 252832 HEA 00 IRClosed
Adequate Heat
Dec 22, 2024 · 5 ST JOSEPH ST - Building permit15 217416Permit Issued
Proposal for store front modification as per approved building pert 11-101197 NB
May 22, 2020 · 5 ST JOSEPH ST - Building permit19 216612Cancelled
To erect and display one illuminated projecting sign.****THE WICKSON SOCIAL****
Sep 5, 2019 · 5 ST JOSEPH ST - Building permit19 152233Cancelled
In conjunction with a three storey building on the premises, proposal to erect and display one static illuminated projecting sign. Erected at the first storey of the north elevation of the building. Measuring 0.91m by 0.91m at the height of 4.57m.**THE ALLEY**
May 15, 2019 · 5 ST JOSEPH ST - Building permit17 213502Cancelled
In conjunction with a multi-storey building on the premises, proposal to erect and display one non-illuminated wall sign, displaying static copy, located on the first storey of the north elevation. The proposed sign is 1.22 metres vertically by 0.76 metre horizontally at a height of 3.62 metres above grade.**THE ALLEY TIME FOR TEA**
Dec 4, 2017 · 5 ST JOSEPH ST - Zoning review17 244611 LPRClosedOct 6, 2017 · 5 ST JOSEPH ST
- Building permit17 157979Closed
Proposal for interior alterations for a new tea shop to vacant commercial space in new condo building. Designed for occupant load of 7 customers + 2 staff. Unit R6. "Bubble Tea"
May 23, 2017 · 5 ST JOSEPH ST - Building permit16 165708Closed
In conjunction with a coffee shop on the premises, proposal to erect and display one static illuminated wall sign on the first storey east elevation (facing Yonge Street). The proposed wall sign is 0.62 metres vertically by 5.0 metres horizontally at a height of 3.86 metres above grade. "AROMA"
Jul 20, 2016 · 5 ST JOSEPH ST - Building permit15 268838Closed
In conjunction with a coffee shop on the premises, proposal to erect and display three static illuminated wall signs on the first storey, two on the east elevation (facing Yonge Street) and one on the north elevation (facing St. Joseph Street). One of the proposed signs on the east elevation is 0.72 metres vertically by 4.52 metres horizontally at a height of 3.69 metres and the other proposed sign on this elevation is 0.94 meters vertically by 4.87 metres horizontally at a height of 3.83 metres above grade. The proposed sign on the north elevation is 0.94 metres vertically by 2.06 metres horizontally at a height of 3.51 metres above grade. "AROMA"
May 25, 2016 · 5 ST JOSEPH ST - Building permit15 130412Closed
To erect and display two illuminated wall signs with static copy, 1.016 metre in vertical length by 7.315 metres in horizontal width, at a height of 4.3 metres, on the easterly facing building wall, in conjunction with a financial institution located on the premises. **RBC**
Dec 21, 2015 · 5 ST JOSEPH ST - Building permit11 101197Cancelled
Revision to rooftop mechanical penthouse (west elevation fire rating deleted)
Jul 13, 2015 · 5 ST JOSEPH ST - Building permit14 267112Closed
Proposal for interior alterations for tenant fit up of a restaurant with more than 30 seats in unit R5-4 on the ground floor of the existing building.
Jun 4, 2015 · 5 ST JOSEPH ST - Building permit15 111261Closed
HVAC - Interior alterations to existing space for RBC.
Feb 19, 2015 · 5 ST JOSEPH ST - Development application14 266377 STE 27 CDClosed
Draft Plan of Standard Condominium Application for 5 St. Joseph Street, in respect of a 48-storey, 539 unit residential condominium currently under construction. The retail areas along Yonge Street, St. Joseph Street and St. Nicholas Street do not form part of the draft plan of condominium.
Dec 19, 2014 · 5 ST JOSEPH ST - Minor varianceA0751/14TEYApproved
To alter the redevelopment plan for a 48-storey condominium mixed-use building with 539 residential dwelling units, approved under Site Specific By-laws 1201-2009 by locating a portion of the visitor bicycle parking spaces on P1 Mezzanine level. 44 of 48 visitor bicycle parking spaces will be housed in a bicycle stacker.
Oct 9, 2014 · 5 ST JOSEPH ST - Building permit10 302381Closed
Proposal to demolish several mixed-use/non-residential buildings under addresses 5-9 St Joseph St (5-storeys), 606-618 Yonge St (3 storeys), and 15-25 St Nicholas St (6 storeys). Total area of demolition is 6984.23m2. Also see related Site Plan Approval file 10-110551 (under 606 Yonge St).
May 13, 2011 · 5 ST JOSEPH ST - Zoning review10 113982 PSPClosedJan 27, 2011 · 5 ST JOSEPH ST
- Zoning review10 303161 ZSVClosedNov 25, 2010 · 5 ST JOSEPH ST
- Zoning review10 268068 ZPRClosedSep 29, 2010 · 5 ST JOSEPH ST
- Building permit10 162534Closed
Plumbing - Interior alterations to portion of ground floor for new sales pavilion. May 2010 - May 2011.SEE HVAC FILE FOR PLANS
May 7, 2010 · 5 ST JOSEPH ST - Development application10 110551 STE 27 SAClosed
NOAC issued on August 10, 2011. Minor Variance Application A0850/11TEY approved on May 2, 2012 to primarily increase the height of building from 45 to 48 storeys, increase the GFA, and reduce the parking requirement. Revised Site Plan application was received on September 12, 2012. Key revisions related to height from 152 metres to 160.88 metres, 32 additional residential units (539 units total), 1860 square metres of additional GFA, 77 square metres of additional indoor amenity space. Commercial/office units on the upper levels fronting Yonge St have been replaced with residential units and retail mezzanines along St Nicholas have been deleted.
Jan 27, 2010 · 606 YONGE ST - Building permit09 163686Closed
Proposal to install 1 backflow prevention device to the existing water line for a fitness club.
Sep 9, 2009 · 5 ST JOSEPH ST - Development application08 213136 STE 27 OZClosed
rezoning application - for mixed use residential commercial development - 420 residential units - retail units
Oct 15, 2008 · 606 YONGE ST - Building permit07 288670Cancelled
Interior alterations to existing night club
Jan 16, 2008 · 5 ST JOSEPH ST - Minor varianceA0602/02TEYApproved
This proposal also includes No. 10 Phipps Street and 9, 15 St. Nicholas Street and is subject to Site Specific By-law No. 469-1998. The applicant is seeking permission to construct an 18 storey rental apartment building containing 218 dwelling units. The building will contain a residential gross floor area of 15, 660.5 square metres, with 162 parking space and 12 visitors parking spaces. Note: By-law No. 469-1998 permitted the development of a condominium building containing 206 units on the site.
Jan 29, 2003 · 5 ST JOSEPH ST - Building permit02 167178Closed
repair 6 shower drains on 2nd floor-----club
Aug 26, 2002 · 5 ST JOSEPH ST - Building permit99 116399Closed
Alter existing H.V.A.C. System on 1st Floor See BP: 430790
Sep 12, 2000 · 5 ST JOSEPH ST - Building permit99 021574Closed
MAKE INTERIOR ALTERATIONS TO 1ST AND BASEMENT LEVEL FOR RESTAURANT PURPOSES. (OCCUPANT LOAD = 450) TENANT: 5IVE FEE$ 1000.00
Nov 22, 1999 · 5 ST JOSEPH ST - Zoning review97 026906 LTOClosedOct 8, 1997 · 5 ST JOSEPH ST
- Zoning review87 030344 LTOClosedAug 11, 1987 · 5 ST JOSEPH ST
- Zoning review86 028196 LTOClosedJun 19, 1986 · 5 ST JOSEPH ST
- Zoning review82 026120 LTOClosedJun 4, 1982 · 5 ST JOSEPH ST
- Zoning review82 025868 LTOClosedApr 2, 1982 · 5 ST JOSEPH ST
- Zoning review81 030673 LTOClosedSep 15, 1981 · 5 ST JOSEPH ST
- Building permit73 012023ClosedJan 16, 1973 · 5 ST JOSEPH ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 1,445 m²
- Frontage
- 48.5 mestimated, irregular lot
- Depth
- 71.9 mestimated, irregular lot
- Street
- St Joseph St
- Corner lot
- No
- Public lane
- St Nicholas St, 7.3 m along it
- Max height
- —
- Max lot coverage
- —
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%31 of 31 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 54
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.
508 CHURCH ST · Sep 9, 2026 · 425 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.
20 MAITLAND ST · Apr 1, 2026 · 242 m away - Minor varianceApproved
To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.
27 GROSVENOR ST · Jul 30, 2025 · 348 m away - Minor varianceApproved
To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).
26 MAITLAND ST · Apr 23, 2025 · 253 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.
510 YONGE ST · Mar 19, 2025 · 263 m away
Latest activity nearby
- Zoning review
Application Acceptable
95 ST JOSEPH ST · Nov 24, 2026 · 262 m away - Zoning review
Application On Hold
649 YONGE ST · Nov 23, 2026 · 267 m away - Building permit
Proposed Hydro Vault Repairs
1001 BAY ST · Nov 13, 2026 · 129 m away - Building permit
Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.
900 BAY ST · Nov 12, 2026 · 296 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 8-11.
900 BAY ST · Nov 10, 2026 · 296 m away - Building permit
Proposal for sprinklers for Hepburn Tower Level 3-7.
900 BAY ST · Nov 10, 2026 · 296 m away - Building permit
Proposed interior alterations for dental office
16 WELLESLEY ST W · Nov 10, 2026 · 79 m away - Building permit
Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor
9 ST NICHOLAS ST · Nov 9, 2026 · 40 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 8-10.
900 BAY ST · Nov 9, 2026 · 296 m away - Building permit
Proposal for sprinklers for Hearst Tower Level 3-7.
900 BAY ST · Nov 9, 2026 · 296 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station2 min walk
- Nearest TTC stop
- Yonge St at Wellesley St West - Wellesley Station1 min walk
- Nearest cycling route
- Wellesley St WCycle Track, 1 min walk
- Nearest traffic count
- 8,168 vehicles in 8 hYonge St / St Joseph St, 60 m away, Mar 9, 2017
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
- Parks
- James Canning Gardens2 min walk
- Dr. Lillian McGregor Park2 min walk
- Norman Jewison Park2 min walk
Schools within 1 km
- THE YMCA ACADEMY SECONDARY SCHOOL Private 4 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 5 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 6 min walk
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 7 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 8 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.