HousePrecheckCheck an address

5 St Joseph StToronto · zoning, lot size and permit records

Also 1 St Joseph St

≈ 48.5 × 71.9 m1,445 m²on St Joseph Stbacks onto St Nicholas St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 15 217416 (Proposal for store front modification as per approved building pert 11-101197 NB, 2020, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 24 development applications open within 300 m, up to 76 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 48.5 m frontage≈ 71.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 15 217416 (Proposal for store front modification as per approved building pert 11-101197 NB, 2020, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 9 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Notice Issued Adequate Heat, Property Standards, Zoning): 26 187782 PRS 00 IR (Property Standards, 2026); 26 144587 ZON 00 IR (Zoning, 2026); 26 125703 PRS 00 IR (Property Standards, 2026); and 6 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0751/14TEY (To alter the redevelopment plan for a 48-storey condominium mixed-use building with 539..., 2014); A0602/02TEY (This proposal also includes No. 10 Phipps Street and 9, 15 St. Nicholas Street and is s..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 24 development applications open within 300 m

    Good to know

    24 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 76 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

43 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 187782 PRS 00 IRClosed

    Property Standards

    Jun 19, 2026 · 5 ST JOSEPH ST
  • By-law investigation26 144587 ZON 00 IRClosed

    Zoning

    Apr 15, 2026 · 5 ST JOSEPH ST
  • By-law investigation26 125703 PRS 00 IRClosed

    Property Standards

    Mar 6, 2026 · 5 ST JOSEPH ST
  • By-law investigation26 121175 ZON 00 IRClosed

    Zoning

    Feb 25, 2026 · 5 ST JOSEPH ST
  • By-law investigation25 122883 HEA 00 IVClosed

    Notice Issued Adequate Heat: The heat supplied to the dwelling unit is below twenty-one (21) degrees Celsius.

    Feb 27, 2025 · 5 ST JOSEPH ST
  • By-law investigation25 122464 HEA 00 IRClosed

    Adequate Heat

    Feb 27, 2025 · 5 ST JOSEPH ST
  • By-law investigation25 115868 ZON 00 IRClosed

    Zoning

    Feb 11, 2025 · 5 ST JOSEPH ST
  • By-law investigation24 252854 HEA 00 IRClosed

    Adequate Heat

    Dec 22, 2024 · 5 ST JOSEPH ST
Show 35 older records
  • By-law investigation24 252832 HEA 00 IRClosed

    Adequate Heat

    Dec 22, 2024 · 5 ST JOSEPH ST
  • Building permit15 217416Permit Issued

    Proposal for store front modification as per approved building pert 11-101197 NB

    May 22, 2020 · 5 ST JOSEPH ST
  • Building permit19 216612Cancelled

    To erect and display one illuminated projecting sign.****THE WICKSON SOCIAL****

    Sep 5, 2019 · 5 ST JOSEPH ST
  • Building permit19 152233Cancelled

    In conjunction with a three storey building on the premises, proposal to erect and display one static illuminated projecting sign. Erected at the first storey of the north elevation of the building. Measuring 0.91m by 0.91m at the height of 4.57m.**THE ALLEY**

    May 15, 2019 · 5 ST JOSEPH ST
  • Building permit17 213502Cancelled

    In conjunction with a multi-storey building on the premises, proposal to erect and display one non-illuminated wall sign, displaying static copy, located on the first storey of the north elevation. The proposed sign is 1.22 metres vertically by 0.76 metre horizontally at a height of 3.62 metres above grade.**THE ALLEY TIME FOR TEA**

    Dec 4, 2017 · 5 ST JOSEPH ST
  • Zoning review17 244611 LPRClosed
    Oct 6, 2017 · 5 ST JOSEPH ST
  • Building permit17 157979Closed

    Proposal for interior alterations for a new tea shop to vacant commercial space in new condo building. Designed for occupant load of 7 customers + 2 staff. Unit R6. "Bubble Tea"

    May 23, 2017 · 5 ST JOSEPH ST
  • Building permit16 165708Closed

    In conjunction with a coffee shop on the premises, proposal to erect and display one static illuminated wall sign on the first storey east elevation (facing Yonge Street). The proposed wall sign is 0.62 metres vertically by 5.0 metres horizontally at a height of 3.86 metres above grade. "AROMA"

    Jul 20, 2016 · 5 ST JOSEPH ST
  • Building permit15 268838Closed

    In conjunction with a coffee shop on the premises, proposal to erect and display three static illuminated wall signs on the first storey, two on the east elevation (facing Yonge Street) and one on the north elevation (facing St. Joseph Street). One of the proposed signs on the east elevation is 0.72 metres vertically by 4.52 metres horizontally at a height of 3.69 metres and the other proposed sign on this elevation is 0.94 meters vertically by 4.87 metres horizontally at a height of 3.83 metres above grade. The proposed sign on the north elevation is 0.94 metres vertically by 2.06 metres horizontally at a height of 3.51 metres above grade. "AROMA"

    May 25, 2016 · 5 ST JOSEPH ST
  • Building permit15 130412Closed

    To erect and display two illuminated wall signs with static copy, 1.016 metre in vertical length by 7.315 metres in horizontal width, at a height of 4.3 metres, on the easterly facing building wall, in conjunction with a financial institution located on the premises. **RBC**

    Dec 21, 2015 · 5 ST JOSEPH ST
  • Building permit11 101197Cancellednew building

    Revision to rooftop mechanical penthouse (west elevation fire rating deleted)

    Jul 13, 2015 · 5 ST JOSEPH ST
  • Building permit14 267112Closed

    Proposal for interior alterations for tenant fit up of a restaurant with more than 30 seats in unit R5-4 on the ground floor of the existing building.

    Jun 4, 2015 · 5 ST JOSEPH ST
  • Building permit15 111261Closed

    HVAC - Interior alterations to existing space for RBC.

    Feb 19, 2015 · 5 ST JOSEPH ST
  • Development application14 266377 STE 27 CDClosed

    Draft Plan of Standard Condominium Application for 5 St. Joseph Street, in respect of a 48-storey, 539 unit residential condominium currently under construction. The retail areas along Yonge Street, St. Joseph Street and St. Nicholas Street do not form part of the draft plan of condominium.

    Dec 19, 2014 · 5 ST JOSEPH ST
  • Minor varianceA0751/14TEYApproved

    To alter the redevelopment plan for a 48-storey condominium mixed-use building with 539 residential dwelling units, approved under Site Specific By-laws 1201-2009 by locating a portion of the visitor bicycle parking spaces on P1 Mezzanine level. 44 of 48 visitor bicycle parking spaces will be housed in a bicycle stacker.

    Oct 9, 2014 · 5 ST JOSEPH ST
  • Building permit10 302381Closeddemolition

    Proposal to demolish several mixed-use/non-residential buildings under addresses 5-9 St Joseph St (5-storeys), 606-618 Yonge St (3 storeys), and 15-25 St Nicholas St (6 storeys). Total area of demolition is 6984.23m2. Also see related Site Plan Approval file 10-110551 (under 606 Yonge St).

    May 13, 2011 · 5 ST JOSEPH ST
  • Zoning review10 113982 PSPClosed
    Jan 27, 2011 · 5 ST JOSEPH ST
  • Zoning review10 303161 ZSVClosed
    Nov 25, 2010 · 5 ST JOSEPH ST
  • Zoning review10 268068 ZPRClosed
    Sep 29, 2010 · 5 ST JOSEPH ST
  • Building permit10 162534Closed

    Plumbing - Interior alterations to portion of ground floor for new sales pavilion. May 2010 - May 2011.SEE HVAC FILE FOR PLANS

    May 7, 2010 · 5 ST JOSEPH ST
  • Development application10 110551 STE 27 SAClosed

    NOAC issued on August 10, 2011. Minor Variance Application A0850/11TEY approved on May 2, 2012 to primarily increase the height of building from 45 to 48 storeys, increase the GFA, and reduce the parking requirement. Revised Site Plan application was received on September 12, 2012. Key revisions related to height from 152 metres to 160.88 metres, 32 additional residential units (539 units total), 1860 square metres of additional GFA, 77 square metres of additional indoor amenity space. Commercial/office units on the upper levels fronting Yonge St have been replaced with residential units and retail mezzanines along St Nicholas have been deleted.

    Jan 27, 2010 · 606 YONGE ST
  • Building permit09 163686Closed

    Proposal to install 1 backflow prevention device to the existing water line for a fitness club.

    Sep 9, 2009 · 5 ST JOSEPH ST
  • Development application08 213136 STE 27 OZClosed

    rezoning application - for mixed use residential commercial development - 420 residential units - retail units

    Oct 15, 2008 · 606 YONGE ST
  • Building permit07 288670Cancelled

    Interior alterations to existing night club

    Jan 16, 2008 · 5 ST JOSEPH ST
  • Minor varianceA0602/02TEYApproved

    This proposal also includes No. 10 Phipps Street and 9, 15 St. Nicholas Street and is subject to Site Specific By-law No. 469-1998. The applicant is seeking permission to construct an 18 storey rental apartment building containing 218 dwelling units. The building will contain a residential gross floor area of 15, 660.5 square metres, with 162 parking space and 12 visitors parking spaces. Note: By-law No. 469-1998 permitted the development of a condominium building containing 206 units on the site.

    Jan 29, 2003 · 5 ST JOSEPH ST
  • Building permit02 167178Closed

    repair 6 shower drains on 2nd floor-----club

    Aug 26, 2002 · 5 ST JOSEPH ST
  • Building permit99 116399Closed

    Alter existing H.V.A.C. System on 1st Floor See BP: 430790

    Sep 12, 2000 · 5 ST JOSEPH ST
  • Building permit99 021574Closed

    MAKE INTERIOR ALTERATIONS TO 1ST AND BASEMENT LEVEL FOR RESTAURANT PURPOSES. (OCCUPANT LOAD = 450) TENANT: 5IVE FEE$ 1000.00

    Nov 22, 1999 · 5 ST JOSEPH ST
  • Zoning review97 026906 LTOClosed
    Oct 8, 1997 · 5 ST JOSEPH ST
  • Zoning review87 030344 LTOClosed
    Aug 11, 1987 · 5 ST JOSEPH ST
  • Zoning review86 028196 LTOClosed
    Jun 19, 1986 · 5 ST JOSEPH ST
  • Zoning review82 026120 LTOClosed
    Jun 4, 1982 · 5 ST JOSEPH ST
  • Zoning review82 025868 LTOClosed
    Apr 2, 1982 · 5 ST JOSEPH ST
  • Zoning review81 030673 LTOClosed
    Sep 15, 1981 · 5 ST JOSEPH ST
  • Building permit73 012023Closed
    Jan 16, 1973 · 5 ST JOSEPH ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,445 m²
Frontage
48.5 mestimated, irregular lot
Depth
71.9 mestimated, irregular lot
Street
St Joseph St
Corner lot
No
Public lane
St Nicholas St, 7.3 m along it
Max height
—
Max lot coverage
—
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm (10 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%31 of 31 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
54

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 31 variance decisions: more than at 64% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the existing entertainment place of assembly (nightclub) use within the two-storey commercial building.

    508 CHURCH ST · Sep 9, 2026 · 425 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

    20 MAITLAND ST · Apr 1, 2026 · 242 m away
  • Minor varianceApproved

    To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

    27 GROSVENOR ST · Jul 30, 2025 · 348 m away
  • Minor varianceApproved

    To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

    26 MAITLAND ST · Apr 23, 2025 · 253 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

    510 YONGE ST · Mar 19, 2025 · 263 m away

Latest activity nearby

  • Zoning review

    Application Acceptable

    95 ST JOSEPH ST · Nov 24, 2026 · 262 m away
  • Zoning review

    Application On Hold

    649 YONGE ST · Nov 23, 2026 · 267 m away
  • Building permit

    Proposed Hydro Vault Repairs

    1001 BAY ST · Nov 13, 2026 · 129 m away
  • Building permit

    Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.

    900 BAY ST · Nov 12, 2026 · 296 m away
  • Building permit

    Proposal for sprinklers for Hearst Tower Level 8-11.

    900 BAY ST · Nov 10, 2026 · 296 m away
  • Building permit

    Proposal for sprinklers for Hepburn Tower Level 3-7.

    900 BAY ST · Nov 10, 2026 · 296 m away
  • Building permit

    Proposed interior alterations for dental office

    16 WELLESLEY ST W · Nov 10, 2026 · 79 m away
  • Building permit

    Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

    9 ST NICHOLAS ST · Nov 9, 2026 · 40 m away
  • Building permit

    Proposal for sprinklers for Hearst Tower Level 8-10.

    900 BAY ST · Nov 9, 2026 · 296 m away
  • Building permit

    Proposal for sprinklers for Hearst Tower Level 3-7.

    900 BAY ST · Nov 9, 2026 · 296 m away

Neighbourhood: Bay-Cloverhill

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station2 min walk
Nearest TTC stop
Yonge St at Wellesley St West - Wellesley Station1 min walk
Nearest cycling route
Wellesley St WCycle Track, 1 min walk
Nearest traffic count
8,168 vehicles in 8 hYonge St / St Joseph St, 60 m away, Mar 9, 2017
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
Parks
James Canning Gardens2 min walk
Dr. Lillian McGregor Park2 min walk
Norman Jewison Park2 min walk

Schools within 1 km

  • THE YMCA ACADEMY SECONDARY SCHOOL Private 4 min walk
  • ST JOSEPH'S COLLEGE SCHOOL English Separate 5 min walk
  • THE ABELARD CENTRE FOR EDUCATION Private 6 min walk
  • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 7 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 8 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 8 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBay-CloverhillMedian neighbourhood
Median household income (2020)$58,400$84,500
Households that own their home30%54%
Population (2021)16,67016,813
Homes built in 1960 or before4%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBay-CloverhillCity median
Assault601.9636.3
Robbery74.769.5
Auto theft16.6192.6
Theft over $5,00087.246.1
Break and enter286.4172.8
Theft from vehicles145.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.