HousePrecheckCheck an address

5 Replin RdToronto · zoning, lot size and permit records

Open space · OR44.2 × 127.6 m5,346 m²on Replin Rdbacks onto Tapestry Lane

Not a home

Lawrence Heights C.C.

The City of Toronto's real estate inventory lists Lawrence Heights C.C. here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 3 development applications open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • Major Transit Station Area: Lawrence WestThe City plans more homes around the station: good for transit, and more building over time.
N50 m
44.2 m frontage127.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards): 26 227218 PRS 00 IR (Property Standards, 2026); 25 260207 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • By-law investigation26 227218 PRS 00 IRClosed

    Property Standards

    Aug 27, 2026 · 5 REPLIN RD
  • By-law investigation25 260207 PRS 00 IRClosed

    Property Standards

    Nov 29, 2025 · 5 REPLIN RD
  • Building permit97 088618Closed

    RADIO ANTENNA

    May 13, 1997 · 5 REPLIN RD

Lot facts

Area
5,346 m²
Frontage
44.2 m
Depth
127.6 m
Street
Replin Rd
Corner lot
No
Public lane
Tapestry Lane, 127.8 m along it
House footprint
1,887 m²roof up to 12.3 m
Back yard
30.5 mhouse to rear lot line
Side yards
3.5 m and 8.9 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Lawrence West. The lot is inside the Lawrence West Major Transit Station Area approved by the Province (Site and Area Specific Policy 714). Source
  • Lawrence-Allen Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: kentucky coffeetree (8 cm), kentucky coffeetree (8 cm), hackberry (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitsecondary suite

    Proposal for a second floor addition and two storey rear addition, interior alterations and a new basement walkout. And proposed secondary suite in basement with partial underpinning.See also 26 130173 ZAP and 26 147466 MV.

    130 FAIRHOLME AVE · Nov 18, 2026 · 235 m away
  • Building permit

    Proposal to install main sanitary back water valve.

    21 REPLIN RD · Nov 12, 2026 · 47 m away
  • Zoning review

    Closed

    2 A FLEMINGTON RD · Aug 28, 2026 · 218 m away
  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing a second storey addition and two-storey rear addition.

    130 FAIRHOLME AVE · Jun 18, 2026 · 235 m away
  • Development application

    Site Plan Approval application for a portion of the lands known municipally as 2A Flemington Road bounded by Turtle Island Road to the north and future Varna Road extension to the west and south, and future Hooyo Terrace extension to the east. Site also referred to as "Block 22". The site currently vacant, has frontage along Turtle Island Road. "Block 22" proposal is a part of the ongoing Lawrence Heights Phase 2 Revitalization. Block 22 is proposed for a 6-storey mixed-use seniors independent living building with 171, 1-bedroom units, and one level of underground parking (20 residential & 20 visitor spaces).

    2 A FLEMINGTON RD · Jun 12, 2026 · 209 m away · City file
  • Zoning review

    Closed

    130 FAIRHOLME AVE · Mar 16, 2026 · 235 m away
  • Building permit

    Rev 01: to add an interior partition wall.Proposal to construct a new garage with workshop.

    151 FAIRHOLME AVE · Jan 21, 2026 · 292 m away
  • Building permit

    Revision 01 - as built condition see deficiency reportHVAC - Proposed Renovations to first and second floor of school. Project entails renovation of select classrooms and washrooms. Project includes modifications to HVAC, Plumbing, and electical. Structural modifications are related to support of new Mechanical work.

    640 LAWRENCE AVE W · Jan 13, 2026 · 194 m away
  • Building permit

    Proposal for underpinning and finishing basement

    121 FAIRHOLME AVE · Nov 27, 2025 · 298 m away
  • Development application

    Application to create new and reconfigured public streets, public parks and 8 new Toronto Community Housing lots, to permit new and replacement residential development in Phase 2 of TCHC Lawrence Heights revitalization. Phase 2A.

    1 REPLIN RD · Nov 10, 2025 · 145 m away · City file

Neighbourhood: Englemount-Lawrence

About the area around the lot, not the lot itself.

Nearest station
Lawrence West Station5 min walk
Nearest TTC stop
5 Replin Rd - Lawrence Heights Community Centre1 min walk
Nearest cycling route
Englemount AveSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
30,514 vehicles in 14 hLawrence Ave W / Shermount Ave, 170 m away, Sep 15, 2026
Serious collisions within 500 m
22021–2026, killed or seriously injured: 2 fatal, 1 with pedestrians, 0 with cyclists
Parks
Lawrence Heights Park1 min walk
Flemington Park3 min walk
Fraserwood Park6 min walk

Schools within 1 km

  • JOHN POLANYI COLLEGIATE INSTITUTE English Public 3 min walk
  • FLEMINGTON PUBLIC SCHOOL English Public 5 min walk
  • VEGA ACADEMY Private 7 min walk
  • YESHIVA GEDOLAH OF TORONTO Private 9 min walk
  • GLEN PARK PUBLIC SCHOOL English Public 12 min walk
  • LAWRENCE HEIGHTS MDL SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEnglemount-LawrenceMedian neighbourhood
Median household income (2020)$78,000$84,500
Households that own their home43%54%
Population (2021)21,28516,813
Homes built in 1960 or before26%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEnglemount-LawrenceCity median
Assault539.9636.3
Robbery45.769.5
Homicide4.25.3
Shootings24.910.5
Auto theft149.5192.6
Theft over $5,00029.146.1
Break and enter137172.8
Theft from vehicles207.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.