HousePrecheckCheck an address

5 Old Mill RdToronto · zoning, lot size and permit records

Open space · ON12.2 × 27.3 m331 m²on Old Mill Rd

Not a home

Old Mill Sewage Pumping Station

The City of Toronto's real estate inventory lists Old Mill Sewage Pumping Station here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Utility or City worksTrucks and work noise at times.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • Major Transit Station Area: Old MillThe City plans more homes around the station: good for transit, and more building over time.
N10 m
12.2 m frontage27.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit18 241609Closed

    HVAC - Proposal for upgrades and rehabilitation of the sewage pumping station.

    May 8, 2020 · 5 OLD MILL RD
  • Building permit04 178003Closed

    Installatiojn of one Certified Tent Structure at Kings Mill Park. Install and remove October 16, 2004. **Toronto Heritage Society.**

    Oct 7, 2004 · 5 OLD MILL RD

Lot facts

Area
331 m²
Frontage
12.2 m
Depth
27.3 m
Street
Old Mill Rd
Corner lot
No
Public lane
None
House footprint
57 m²roof up to 7.1 m
Back yard
19.2 mhouse to rear lot line
Side yards
1.7 m and 2.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Old Mill. The lot is inside the Old Mill Major Transit Station Area approved by the Province (Site and Area Specific Policy 635). Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to convert existing garage to bedroom, to remain as part of single-family dwelling and install new heat pump.

    95 OLD MILL DR · Sep 2, 2026 · 261 m away
  • Building permit

    REVISION - Remove proposed garage from grade, Revise layout on ground floor (laundry room / powder room) - A201, Add bedroom and 3 piece bathroom on second floor - A202Proposal to construct new below grade garage on south side of existing dwelling, interior alterations, and enclose entrance deck. Construct new deck walls and roof at third floor level. June 17, 2013: proposed below grade garage is excluded from this permit

    95 OLD MILL DR · Sep 1, 2026 · 261 m away
  • Building permit

    PROPOSED NEW REAR DECK

    513 RIVERSIDE DR · Aug 4, 2026 · 290 m away
  • Building permit

    Proposed detached shed and deck in rear yard of existing detached dwelling

    513 RIVERSIDE DR · Jul 3, 2026 · 290 m away
  • Building permit

    Proposed garage ramp restoration repairs.

    40 OLD MILL RD · May 25, 2026 · 184 m away
  • Building permit

    REVISION 03 - Shoring and Excavation Work To Add Two New Elevators To The Existing Station.REVISION 02 - Revision work involves shoring and micropile work as the excavation support systemREVISION 01 - Proposed changes the building permit documentation include the location and construction assembly of the south wall. The south wall has shifted north into the corridor and the assembly of the wall has been revised from cast-in-place concrete to 140mm concrete masonry with a sintered ceramic rainscreen cladding. The fire resistance rating of the exposed building face has been updated to 1hr on drawing AF03 to be consistent with the requirements of OBC Table 3.2.3.7 as noted on AA02. To add 2 new elevators to TTC's Old Mill Station to accommodate Accessibility_ 110 m2 above garde and 148 m2 below. Shoring for excavation 37 mSee 22-141983 ALT

    2672 BLOOR ST W · Dec 10, 2025 · 207 m away
  • Building permit

    Proposal for snow load damage to roof - Remove and replace damaged rafters, roof sheathing, insulation, and roofing materials; reinforce cracked rafters; and restore all associated roof components (flashing, fascia, soffit, eaves troughs, and shingles) to match existing conditions.

    65 OLD MILL DR · Sep 10, 2025 · 291 m away
  • Building permit

    Proposed interior alterations

    97 OLD MILL DR · Aug 28, 2025 · 286 m away
  • Minor variancePending

    Cancelled

    494 RIVERSIDE DR · Aug 14, 2025 · 277 m away
  • Minor variancePending

    Proposal for 1 storey rear addition. See related 23 155006 BLD 00 SR. New variances for changes to garage to change floor space index to 0.66, new reduction in parking space length to 4.9 m

    494 RIVERSIDE DR · Jul 24, 2025 · 277 m away

Neighbourhood: Kingsway South

About the area around the lot, not the lot itself.

Nearest station
Old Mill Station3 min walk
Nearest TTC stop
Old Mill Station - Eastbound Platform3 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail, 1 min walk
Nearest traffic count
1,783 vehicles in 8 hOld Mill Dr / Catherine St, 240 m away, Dec 21, 2011
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
King's Mill Park1 min walk
Home Smith Park1 min walk
Etienne Brule Park2 min walk

Schools within 1 km

  • BLYTH ACADEMY SCHOOL - ETOBICOKE Private 10 min walk
  • ST PIUS X CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • SUMMIT MICRO SCHOOL Private 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKingsway SouthMedian neighbourhood
Median household income (2020)$184,000$84,500
Households that own their home81%54%
Population (2021)8,85516,813
Homes built in 1960 or before59%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKingsway SouthCity median
Assault513.1636.3
Robbery2969.5
Auto theft125.9192.6
Theft over $5,00058.146.1
Break and enter271.1172.8
Theft from vehicles48.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.