HousePrecheckCheck an address

5 Hoskin AveToronto · zoning, lot size and permit records

Also 20 Queen's Park Cres W

62.9 × 136.9 m8,450 m²on Tower Rdcorner, also on Hoskin Ave

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 2 development applications open within 300 m, up to 9 storeysNew buildings may go up around here in the next years. More change nearby than at 88% of Toronto houses.
N50 m
62.9 m frontage136.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 9 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit21 201630Closed

    erect certified temporary tent 30 x 100 September 3-14, 2021

    Sep 2, 2021 · 5 HOSKIN AVE
  • Building permit14 206673Closed

    To install one mag lock on the second floor of the existing "Wycleff College"

    Aug 15, 2014 · 5 HOSKIN AVE
  • Building permit08 162644Closed

    permit to replace fire alarm panel to existing religious adult training school

    Jun 25, 2008 · 5 HOSKIN AVE
  • Building permit08 148585Closed

    Install 1 Certified Tent #06-126871 from May 12-16, 2008 on U of T grounds

    May 1, 2008 · 5 HOSKIN AVE
  • Building permit07 255174Closed

    Construct a side yard covered porch with roof balcony at Dean's Residence, Wycliffe College, University of Toronto.

    Oct 18, 2007 · 5 HOSKIN AVE
  • Building permit07 114490Closed

    Erect temporary tent. To be install on May 12th, 2007 and dismantled on May 18th, 2007. Certified tent # 06126871 30' x 80 '. Designated Historical

    Mar 28, 2007 · 5 HOSKIN AVE
  • Building permit06 130195Closed

    Install 1 30' x 80' frame tent on University of Toronto campus.

    May 12, 2006 · 5 HOSKIN AVE
  • Building permit04 101271Closed - Dormant

    Demolish porch on South side of Principals Residence to the rear of the property.Existing & Proposed Use: College Bldg. and University Residence (Wycliffe College)(conv. address 20 Queen's Park Cr. (WB)

    Feb 4, 2004 · 5 HOSKIN AVE
Show 6 older records
  • Building permit02 162110Closed - Dormant

    Install new elevator addition from basement to 1st floor, make interior altertions in the basement for washroom facilities, modify the existing porch steps, also install new stair lift on the ground floor

    Oct 8, 2002 · 5 HOSKIN AVE
  • Building permit01 115109Closed

    Install fixtures in basement; 1wc, 1wb, 1 shower, 1 2-compt ks. cost included in 01103717

    Mar 14, 2001 · 5 HOSKIN AVE
  • Building permit01 103717Closed

    Make interior alterations in the basement - by raising floor on portion of the east side of the building. Also construct exterior walls.

    Mar 13, 2001 · 5 HOSKIN AVE
  • Zoning review01 012039 LTOClosed
    Jan 8, 2001 · 5 HOSKIN AVE
  • Building permit99 014461Closed

    MAKE INTERIOR ALTERATIONS ON PORTION OF 3RD FLOOR FOR "TEA ROOM" - LOUNGE. DESIGNATED: HISTORICAL /ZL

    Apr 19, 1999 · 5 HOSKIN AVE
  • Building permit97 018249Closed

    INSTALL NEW SPRINKLER SYSTEM THROUGHOUT BUILDING. DESIGNATED: HISTORICAL EDC

    Jul 16, 1997 · 5 HOSKIN AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,450 m²
Frontage
62.9 m
Depth
136.9 m
Street
Tower Rd
Corner lot
Yes, also on Hoskin Ave136.9 m along it
Public lane
None
House footprint
2,441 m²roof up to 22.5 m
Back yard
40.4 mhouse to rear lot line
Side yards
0.4 m and 12.4 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    6

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To permit one 36-storey mixed-use building, which will span across two lots, for a private student residence use. There will be a total of 426 dwelling units, and 220.5 m² of non-residential retail uses (at-grade) within this building. The properties municipally known as 208 Bloor Street West and 210 Bloor Street West are currently under separate ownership and governed by separate Site-Specific Zoning By-laws (By-law 782-2022(OLT), and By-law 778-2024). In the near future, both properties will merge on title under one single entity to facilitate this new development. There is a current Site Plan Control application (No. 21 220574 STE 11 SA) which is currently under review and consideration.

      208 BLOOR ST W · Jul 8, 2026 · 474 m away
    • Minor varianceRefused

      To permit one 36-storey mixed-use building, which will span across two lots, for a private student residence use. There will be a total of 426 dwelling units, and 220.5 m² of non-residential retail uses (at-grade) within this building. The properties municipally known as 208 Bloor Street West and 210 Bloor Street West are currently under separate ownership and governed by separate Site-Specific Zoning By-laws (By-law 782-2022(OLT), and By-law 778-2024). In the near future, both properties will merge on title under one single entity to facilitate this new development. There is a current Site Plan Control application (No. 21 220574 STE 11 SA) which is currently under review and consideration.

      210 BLOOR ST W · Jul 8, 2026 · 473 m away
    • Minor varianceApproved

      To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).

      356 HURON ST · Dec 10, 2025 · 480 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.

      70 ST MARY ST · Feb 26, 2025 · 494 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).

      95 ST JOSEPH ST · Oct 16, 2024 · 492 m away

    Latest activity nearby

    • Building permit

      Replace existing roof mounted exhaust fans (EF-2.1,29,30), Replace existing pumps, CP-5 and CP-6 found in mechanical room E045, Replace existing pump, CP-11 and CP-14 found in mechanical room 55, Replace existing pump, M-42 found in mechanical room 55, Replace the existing air handling units, AHU-311 and AHU-319 within 3rd floor mechanical rooms in 311 and 319.

      80 QUEEN'S PARK · Nov 4, 2026 · 221 m away
    • Building permit

      Proposed interior alterations on the third floor in the area of rooms 318, 320, 322, 323, 324, and 325 and related electrical work.

      80 QUEEN'S PARK · Oct 15, 2026 · 221 m away
    • Building permit

      Proposed wholesale removal and replacement of existing conventional BUR roof with a new two-ply cold-adhered conventional modified bitumen membrane assembly, wholesale replacement of parapet metal flashing, localized masonry repairs and mortar repointing as directed by the consultant, wholesale removal and replacement of the existing deteriorated roof deck and joists

      7 HART HOUSE CRCL · Oct 8, 2026 · 89 m away
    • Building permit

      Demountable stage for entertainers for performing on for event

      111 WELLESLEY ST W · Sep 10, 2026 · 283 m away
    • Zoning review

      Closed

      6 HOSKIN AVE · Aug 28, 2026 · 103 m away
    • Building permit

      Alternative Solution for 65 mm Diameter Standpipe Hose Connections Serving Basement

      7 HART HOUSE CRCL · May 22, 2026 · 89 m away
    • Building permit

      Interior alterations to the two washrooms on the first foor. - Gerstein Building - P999-24-045

      9 KING'S COLLEGE CRCL · Apr 9, 2026 · 266 m away
    • Building permit

      REV 02: Revision to fire and smoke dampers.Revision #1 - includes 2nd floor residential kitchen to have dedicated exhaust fan (EF-L02-03) and revised connections of ecology units ECU-01A / ECU-01B to have two separate inlet and two separate outlet connections. Refer to attached detailed description.HVAC - Construction of new 5 storey brick and aluminum clad, mass timber structure, includes 270 dorm rooms, shared common residence lounges, student cafeteria, 5 academic classrooms, 1 lecture room, event space, academic offices and roof top urban farm, extensive green roofs and roof top solar PV arrays nd integrating the existing Larkin Building and George Ignatieff Theatre

      6 HOSKIN AVE · Mar 16, 2026 · 103 m away
    • Building permit

      Proposed sprinkler modification and installation of standpipe system.

      73 QUEEN'S PARK CRES E · Jan 14, 2026 · 296 m away
    • Building permit

      Proposal for Revised connections of kitchen exhaust ecology units (ECU-01A / ECU-01B) to have two separate inlet connections and two separate outlet connections.

      6 HOSKIN AVE · Jan 12, 2026 · 103 m away

    Neighbourhood: University

    About the area around the lot, not the lot itself.

    Nearest station
    Museum Station5 min walk
    Nearest TTC stop
    Hoskin Ave at Tower Rd - Trinity College1 min walk
    Nearest cycling route
    Hoskin AveCycle Track, 1 min walk
    Nearest traffic count
    6,686 vehicles in 8 hTower Rd / Hoskin Ave, 80 m away, Oct 3, 2011
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 3 with cyclists
    Parks
    Queen's Park1 min walk
    Bloor - Bedford Parkette8 min walk
    Clover Hill Park9 min walk

    Schools within 1 km

    • MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 3 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 3 min walk
    • ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 5 min walk
    • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 5 min walk
    • SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 6 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT THE OBSERVATORY - U OF T, BLDG 89 University 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureUniversityMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home39%54%
    Population (2021)6,43516,813
    Homes built in 1960 or before59%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleUniversityCity median
    Assault1740.5636.3
    Robbery133.969.5
    Homicide12.25.3
    Auto theft182.6192.6
    Theft over $5,000121.746.1
    Break and enter730.3172.8
    Theft from vehicles353188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.