HousePrecheckCheck an address

5-36 Needle FirwayToronto · zoning, lot size and permit records

Also 10 Needle Firway, 12 Needle Firway, 14 Needle Firway, 22 Needle Firway, 24 Needle Firway and 11 more

Residential apartment commercial · RAC (x187)≈ 174.8 × 82.6 m11,775 m²on Needle Firway

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 12 storeys, 152 rental units, built 1980More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 144053 (Replacement of fire damaged balcony railing and EIFS at unit 1207, 2026); 24 233683 (Due to water leaks sections of the underground garage concrete roof slab and foundation..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 4 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 256614 PRS 00 IR (Property Standards, 2026, status Rescheduled).
  • City upkeep score: 92 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Jane and FinchThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 174.8 m frontage≈ 82.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 256614 PRS 00 IR (Property Standards, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2000

    Needs a closer look

    Still open in the City's records: 18 109888 (Proposed: Alteration to ground floor OUM office (reception and office areas). Including..., 2018, status Permit Issued); 00 144660 (REPLACEMENT OF ROOF WITH DECK REPAIRS ON BLOCK ( B ) ONLY, 2000, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 123656 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 144053 (Replacement of fire damaged balcony railing and EIFS at unit 1207, 2026); 24 233683 (Due to water leaks sections of the underground garage concrete roof slab and foundation..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A123/01U (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 4 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 92 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (12 storeys, 152 units, built 1980).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

22 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 256614 PRS 00 IRRescheduled

    Property Standards

    Oct 19, 2026 · 5-36 NEEDLE FIRWAY
  • Building permit26 144053Permit Issued

    Replacement of fire damaged balcony railing and EIFS at unit 1207.

    May 14, 2026 · 5 NEEDLE FIRWAY
  • By-law investigation26 123656 PRS 00 IRClosed

    Property Standards

    Mar 2, 2026 · 5-36 NEEDLE FIRWAY
  • Building permit24 233683Inspection

    Due to water leaks sections of the underground garage concrete roof slab and foundation wall are deteriorated. To rectify the issues, Isolated concrete repairs and waterproofing of the underground garage roof slab and foundation walls are to be carried out

    Feb 12, 2025 · 5-36 NEEDLE FIRWAY
  • Building permit21 190790Closed

    Replacement of garage sprinkler system

    Sep 7, 2021 · 5 NEEDLE FIRWAY
  • Building permit19 149037Closed

    Revision 01 - Changes as per bubbled areasHVAC - Overcladding of the entire building: roof repairs, windows, doors and guards replacements, interior alterations to ground floor and basement. Building systems upgrades, new mechanical equipment and upgrades.

    Sep 2, 2021 · 5-36 NEEDLE FIRWAY
  • Building permit20 169141Closed

    Proposal to replace the existing diesel emergency generator for a natural gas emergency generator in the generator room of an existing apartment building.

    Aug 4, 2020 · 5 NEEDLE FIRWAY
  • Development application20 122745 WET 07 OZClosed

    A revised Zoning By-law amendment and Draft Plan of Subdivision to re-develop the site with 8 new blocks, 6 new buildings, a community centre, a public park, public roads and private driveways. The buildings would range in height from 4 storeys to 25 storeys and contain a total of 941 new dwelling units consisting of townhouses and apartment units of which 341 are TCHC units and 600 are market units. The units would consist of townhouses and apartment units. The existing 152 TCHC apartment units at 5 Needle Firway would be retained. A total of 991 residential units in addition to the 152 retained are proposed. A total of 932 parking spaces would be provided site wide. Properties include: 3, 36 Marsh Grassway, 7, 11 Blue Grassway, 4, 17 Cane Grassway, 5, 10, 40 Turf Grassway and 1,2, & 8 Dune Grassway.

    Mar 5, 2020 · 5-36 NEEDLE FIRWAY · City file
Show 14 older records
  • Building permit19 265578Closed

    Proposed installation of a combined heat and power unit on the roof and modifications to the existing heating and domestic hot water networks to reject its heat in the building

    Feb 10, 2020 · 5-36 NEEDLE FIRWAY
  • Building permit19 149097Closed

    Overcladding of the entire building, new roof, windows, doors and guards replacements.

    May 21, 2019 · 5-36 NEEDLE FIRWAY
  • Building permit19 149117Closed

    Overcladding of the entire building, new roof, windows, doors and guards replacements.

    May 17, 2019 · 5-36 NEEDLE FIRWAY
  • Building permit18 141163Closed

    Plumbing - Renovation of laundry room to make it compliant to AODA and TCHC accessibility standards. New electrical panel, lighting, plumbing and new floor and wall finishes

    Apr 23, 2018 · 5 NEEDLE FIRWAY
  • Building permit18 109888Permit Issued

    Proposed: Alteration to ground floor OUM office (reception and office areas). Including electrical and mechanical alterations to suit new configuration.

    Jan 31, 2018 · 5 NEEDLE FIRWAY
  • Zoning review17 112702 ZZCPending Cancellation
    Feb 3, 2017 · 5-36 NEEDLE FIRWAY
  • Building permit15 174959Closed

    Permit for garage slab repairs with assocated stairwell repairs & waterproofing.

    Jun 17, 2015 · 5-36 NEEDLE FIRWAY
  • Building permit09 196138Closed

    Proposed installation of (1) backflow prevention device in existing apartment building.

    Dec 23, 2009 · 5-36 NEEDLE FIRWAY
  • Building permit08 225451Closed - Dormant

    HVAC - Interior alterations to the existing rental management office area on the ground floor of a high-rise apartment building.

    Jan 9, 2009 · 5 NEEDLE FIRWAY
  • Building permit06 179957Closed

    Plumbing - Interior alterations to ground floor offices and elevator lobby in existing Apartment Building.

    Oct 31, 2006 · 5-36 NEEDLE FIRWAY
  • Minor varianceA123/01UApproved

    This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the enclosure of the existing accessory staircase at the front of the property, which is used to access underground parking.

    Nov 29, 2001 · 5-36 NEEDLE FIRWAY
  • Building permit01 178697Closed

    UNDERGROUND GARAGE ROOF SLAB REPAIR & STAIR ENCLOSURES.

    Oct 17, 2001 · 5-36 NEEDLE FIRWAY
  • Building permit00 144660Inspection

    REPLACEMENT OF ROOF WITH DECK REPAIRS ON BLOCK ( B ) ONLY

    May 9, 2000 · 22 NEEDLE FIRWAY
  • Building permit96 089987Cancelled

    RETROFIT

    Dec 5, 1996 · 5 NEEDLE FIRWAY

Check before you build

  • Site-specific exception 900.8.10(187)

    Needs a closer look

    16 site-specific rules apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.8.10(187)Applies

These parts of the exception apply to this lot's address.

  1. Rule A · diagram area

    On the lands shown on Diagram 1 of By-law 828-2022, if the requirements of this By-law are complied with, a building or structure may be constructed, used or enlarged in compliance with Regulations

  2. Rule B

    to (Q) below; (B) For the purposes of this exception: (i) "lot" is defined as the lands outlined by black lines collectively comprising Block 1, Block 2, Block 4, Block 5, Block 7A, Block 7B, Existing Block 1 and Existing Block 2 as identified on Diagram 1 of By-law 828-2022; (ii) "lot line" is defined to include the boundary of any of Block 1, Block 2, Block 4, Block 5, Block 7A, Block 7B, Existing Block 1 and Existing Block 2 as identified on Diagram 1 of By-law 828-2022; (iii) "existing buildings" are the buildings and structures lawfully existing on the lot , labelled as "Existing Building" as shown on Diagram 3 of By-law 828-2022; and (iv) "average grade" means the average elevation of the finished ground surface, around all sides of a building or structure , measured where the building or structure meets the ground surface

  3. Rule C

    In addition to the building types permitted in 15.20.20.40(1), a townhouse is a permitted residential building type

  4. Rule D

    Despite Regulation 15.5.50.10(1)(B), no soft landscaping is required

  5. Rule E

    Despite Regulation 15.20.30.10(1), the minimum lot area is 600.0 square metres

  6. Rule F

    Despite Regulation 15.20.30.20(1), the minimum lot frontage is 15.0 metres

  7. Rule G

    Regulation 15.20.30.40(1), with respect to lot coverage does not apply

  8. Rule H

    Despite Regulation 15.5.40.10(1), the height of a building or structure is the distance between the "average grade" and elevation of the highest point of the building or structure

  9. Rule I

    Despite Regulations 15.20.40.10(1) and (2), the permitted maximum height and number of storeys of a building or structure is the numerical value in metres, following the letters "HT" and the number of storeys , following the letters "ST" on Diagram 3 of By-law 828-2022

  10. Rule J

    The buildings labelled as Existing Building on Diagram 3 of By-law 828-2022, and the structures and uses on Existing Block 1 and Existing Block 2 shown on Diagram 1 of By-law 828-2022 on the lot as of June 1, 2022, are permitted on the lot

  11. Rule K

    Despite Regulation 15.20.40.40(1), the maximum permitted gross floor area , excluding Existing Block 1 and Existing Block 2 as shown on Diagram 1 of By-law 828-2022 is 115,000.0 square metres, of which the maximum permitted gross floor area for Block 4, Block 5, Block 7A and Block 7B as shown on Diagram 1 of By-law 828-2022 is as follows: (i) 30,500.0 square metres for Block 4; (ii) 7,200.0 square metres for Block 5; (iii) 14,100.0 square metres for Block 7A; and (iv) 14,700.0 square metres for Block 7B

  12. Rule L

    Despite Clause 15.20.40.70, the required minimum building setbacks are as specified in Regulations (i) to (vi) below; (i) On Block 1, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between "average grade" and a height of 30.0 metres must be setback a minimum of 2.0 metres and a maximum 6.0 metres from the "lot line"; (b) the main wall of a building or structure located above a height of 18.0 metres, must be setback a minimum of 3.0 metres from the exterior of a main wall of any storey of the same building or structure located below a height of 18.0 metres, excluding the elements permitted by (O) below; and (c) the portions of a building or structure located above a height of 18.0 metres must not exceed a maximum floor area, measured from the exterior of the main wall of each floor level and inclusive of the entire floor, of 850.0 square metres; (ii) On Block 2, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between "average grade" and a height of 30.0 metres must be setback a minimum of 2.0 metres and a maximum 6.0 metres from the "lot line"; (b) the portions of a building or structure located between "average grade" and a height of 30 metres must be setback a minimum of 0.0 metres and a maximum of 6.0 metres from the "lot line" abutting Jane Street; (c) the main wall of a building or structure located above a height of 30.0 metres, must be setback a minimum of 3.0 metres from the exterior of a main wall of any storey of the same building or structure located below a height of 30 metres, excluding the elements permitted by (O) below; (d) no portion of a building or structure located above a height of 30.0 metres may be erected more than 35.0 metres from the "lot line" fronting onto Jane Street excluding the elements permitted by Regulation (O) of By-law 828-2022; and (e) the portions of a building or structure located above a height of 22.0 metres must not exceed a maximum floor area, measured from the exterior of the main wall of each floor level and inclusive of the entire floor, of 800.0 square metres; (iii) On Block 4, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between average grade and a height of 30.0 metres must be setback a minimum of 2.0 metres and a maximum 6.0 metres from the "lot line"; (b) the portions of a building or structure located between "average grade" and a height of 30.0 metres must be setback a minimum of 0.0 metres and a maximum of 6.0 metres from the "lot line" abutting Jane Street; (c) the main wall of a building or structure located above a height of 22.0 metres, must be setback a minimum of 3.0 metres from the exterior of a main wall of any storey of the same building or structure located below a height of 22.0 metres, excluding the elements permitted by (O) below; (d) no portion of a building or structure above a height of 30.0 metres may be erected more than 55.0 metres from the "lot line" fronting onto Jane Street, excluding the elements permitted by (O) below; and (e) the portions of a building or structure located above a height of 22.0 metres must not exceed a maximum floor area, measured from the exterior of the main wall of each floor level and inclusive of the entire floor, of 750.0 square metres; (iv) On Block 5, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between "average grade" and a height of 30 metres must be setback a minimum of 2.0 metres and a maximum 6.0 metres from the "lot line"; and (b) no portion of a building or structure above a height of 15.0 metres may be erected more than 35.0 metres from the "lot line" fronting onto Street C as shown on Diagram 1 of By-law 828-2022, excluding the elements permitted by (O) below; (v) On Block 7A, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between "average grade" and a height of 30 metres must be setback a minimum of 2.0 metres and a maximum 6.0 metres from the "lot line"; (b) the portions of a building or structure located between "average grade" and a height of 30 metres must be setback a minimum of 2.5 metres and a maximum 14.0 metres from the "lot line" abutting Firgrove Crescent; and (c) the main wall of a building or structure located above a height of 12.0 metres must be setback a minimum 1.5 metres from the exterior of a main wall of any storey of the same building or structure located below a height of 12.0 metres, excluding the elements permitted by (O) below; (vi) On Block 7B, as identified on Diagram 1 of By-law 828-2022: (a) the portions of a building or structure located between "average grade" and a height of 30.0 metres must be setback a minimum of 2.0 metres and a maximum of 6.0 metres from the "lot line"; (b) the portions of a building or structure located between "average grade" and a height of 30.0 metres must be setback a minimum of 2.5 metres and a maximum of 8.0 metres from the "lot line" abutting Firgrove Crescent; (c) the main wall of a building or structure located above a height of 18.0 metres, must be setback a minimum of 3.0 metres from the exterior of a main wall of any storey of the same building or structure located below a height of 18.0 metres, excluding the elements permitted by (O) below; and (d) the portions of a building or structure located above a height of 18.0 metres must not exceed a maximum floor area, measured from the exterior of the main wall of each floor level and inclusive of the entire floor, of 750.0 square metres

  13. Rule M

    In addition to the requirements of Regulation 15.20.40.80(2)(B) and Regulation (L) above, every building with a height greater than 30.0 metres must be separated by at least 25.0 metres from each other building with a height greater than 30.0 metres, measured only for the portions of the buildings that collectively enclose the entirety of a storey with a height greater than 30.0 metres, excluding the elements permitted by (O) below

  14. Rule N

    In addition to the requirements of Regulation 15.20.40.80(1) and Regulation (L) above, if a line projected at a right angle from a main wall of a building with a height greater than 30.0 metres intercepts another main wall of the same building , those main walls must be separated by a minimum 25.0 metres, measured only for the portions of the building that collectively enclose the entirety of a storey with a height greater than 30.0 metres, excluding the elements permitted by

  15. Rule O

    below; (O) Despite Clause 15.5.40.60 and Regulation (L) above, the following elements may encroach into the required minimum building setbacks as follows: (i) Balconies, cornices, lighting fixtures, awnings, ornamental elements, commercial or wayfinding signage, parapets, trellises, eaves, window sills and projections, guardrails, balustrades, railings, wheel chair ramps or other accessibility features, stairs, star enclosures, vents, underground garage ramps and their associated structures or equipment, fences, screens, planter boxes, intake and exhaust vents, to a maximum of 2.0 metres; (ii) Wind mitigation features including canopies, awnings and glazed entry vestibules to a maximum of 3.0 metres

  16. Rule P

    Despite Regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided and maintained in accordance with the following: (i) For 'assisted housing' dwelling units , parking spaces must be provided for each dwelling unit in accordance with the following minimum rates: (a) A minimum of 0.36 parking spaces for each two bedroom dwelling unit ; (b) A minimum 0.71 parking spaces for each three bedroom dwelling unit ; and (c) A minimum of 0.1 visitor parking spaces for each dwelling unit ; (ii) For dwelling units in an apartment building , parking spaces must be provided for each dwelling unit in accordance with the following minimum rates: (a) A minimum 0.74 parking spaces for each one bedroom dwelling unit ; (b) A minimum of 0.81 parking spaces for each two bedroom dwelling unit ; (c) A minimum 1.0 parking spaces for each three bedroom dwelling unit ; and (d) A minimum of 0.1 visitor parking spaces for each dwelling unit ; (iii) For non-residential uses, parking spaces must be provided in accordance with the following minimum rates: (a) Parking spaces must be provided at a ratio of 1.5 parking spaces per 100 square metres of gross floor area

  17. Rule Q

    Required parking spaces for non-residential uses may be provided on Block 1, Block 2, Block 3, Block 4, Block 5, Block 6, Block 7A and/or Block 7B, as shown on Diagram 1 of By-law 828-2022 and may be shared on a non-exclusive basis.

By-law 569-2013, Chapter 900

Lot facts

Area
11,775 m²
Frontage
174.8 mestimated, irregular lot
Depth
82.6 mestimated, irregular lot
Street
Needle Firway
Corner lot
No
Public lane
None
House footprint
1,121 m²roof up to 39.2 m
Back yard
17 mhouse to rear lot line
Side yards
51 m and 52 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Jane and Finch. The lot is inside the Jane and Finch Major Transit Station Area approved by the Province (Site and Area Specific Policy 698). Source
  • Jane Finch Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone RAC (x187) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
4

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing office space to residential dwelling units.

    10 YORKWOODS GT · Jun 3, 2021 · 439 m away

Latest activity nearby

  • Building permit

    Interior fit-out of an existing commercial tenant space (suite 105)

    2839 JANE ST · Oct 27, 2026 · 278 m away
  • Zoning review

    Cancelled

    2845 JANE ST · Sep 16, 2026 · 288 m away
  • Zoning review

    Cancelled

    2845-2891 JANE ST · Sep 16, 2026 · 267 m away
  • Building permit

    Revision - to the entire floor .Proposed interior alteration to convert an vacant unit (previously retail store) to a day care.

    2950 JANE ST · Aug 14, 2026 · 277 m away
  • Building permit

    Proposed fire alarm for proposed daycare - See 26 178222 BLD 00 BA

    2950 JANE ST · Jul 23, 2026 · 277 m away
  • Building permit

    Replacement of fire damaged balcony railing and EIFS at unit 1207.

    5 NEEDLE FIRWAY · May 14, 2026 · 45 m away
  • Minor varianceApproved

    To convert the existing building into a day nursery.

    2950 JANE ST · Mar 26, 2026 · 277 m away
  • Building permit

    1 Wall Sign

    2839 JANE ST · Mar 3, 2026 · 278 m away
  • Zoning review

    Cancelled

    2853 JANE ST · Feb 12, 2026 · 282 m away
  • Zoning review

    Closed

    2845-2891 JANE ST · Feb 12, 2026 · 267 m away

Neighbourhood: Glenfield-Jane Heights

About the area around the lot, not the lot itself.

Nearest station
Jane and Finch Station9 min walk
Nearest TTC stop
Jane St at Firgrove Cres (South) South Side5 min walk
Nearest cycling route
Yorkwoods GtSharrows - Wayfinding, 4 min walk
Nearest traffic count
2,672 vehicles in 14 hPicaro Dr / Firgrove Cres, 120 m away, Mar 19, 2024
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 0 with cyclists
Parks
Firgrove Park3 min walk
Yorkwoods Park5 min walk
Langdale Court Greenbelt8 min walk

Schools within 1 km

  • FIRGROVE PUBLIC SCHOOL English Public 1 min walk
  • ST FRANCIS DE SALES CATHOLIC ELEMENTARY SCHOOL English Separate 4 min walk
  • YORKWOODS PUBLIC SCHOOL English Public 7 min walk
  • WESTVIEW CENTENNIAL HIGH SCHOOL English Public 8 min walk
  • SENECA COLLEGE (YORKGATE CAMPUS) College 11 min walk
  • OAKDALE PARK MDL SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGlenfield-Jane HeightsMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home52%54%
Population (2021)30,02016,813
Homes built in 1960 or before23%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGlenfield-Jane HeightsCity median
Assault1083.8636.3
Robbery144.569.5
Shootings25.110.5
Auto theft226.2192.6
Theft over $5,00062.846.1
Break and enter113.1172.8
Theft from vehicles97.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.