HousePrecheckCheck an address

4B Spadina AveToronto · zoning, lot size and permit records

10.5 × 92.1 m840 m²on Spadina Ave

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • 6 development applications open within 300 m, up to 72 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
10.5 m frontage92.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 72 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
840 m²
Frontage
10.5 m
Depth
92.1 m
Street
Spadina Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%3 of 3 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    18

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

      485 WELLINGTON ST W · Oct 7, 2026 · 378 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 493-2024) for the 21-storey mixed-use building (located at the northwest corner of the lot, municipally known as 396 Queens Quay West) by increasing the height of the mechanical penthouse, reducing the width of 32 parking spaces, and reducing the indoor amenity space (which will be used for storage space for outdoor furniture).

      350 QUEENS QUAY W · Jun 17, 2026 · 498 m away
    • Minor varianceApproved

      To alter the development standards, as approved under Site Specific Zoning By-law 135-2026 (OLT), for the 60-storey mixed-use building by converting the office spaces into residential units from floors 3 to 7, and to increase the number of storeys to 65-storeys; the building height from 202.5 m to 214 m (including the mechanical penthouse); and the maximum gross floor area. This is currently under the review of Site Plan Control (File No. 20 233433 STE 10 SA). There will be a total of 807 residential dwelling units on this lot.

      277 WELLINGTON ST W · Apr 15, 2026 · 422 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-laws 1061-2014 and 1062-2014) for a 36-storey mixed-use building, to increase the maximum permitted residential gross floor area, and to reduce the rate of ¿short term¿ bicycle parking spaces on-site.

      57 SPADINA AVE · Jul 23, 2025 · 406 m away
    • Minor varianceApproved

      To convert the existing commercial space (located on the first floor lobby, and second levels of the building, municipally known as 350 Queens Quay West) into a hotel use, and to expand the permitted hotel use areas (on the second level of the building, municipally known as 390 Queens Quay West). Also, to alter the existing building municipally known as 396 Queens Quay West, by constructing a seventh level shaft on the roof area.

      350 QUEENS QUAY W · Apr 9, 2025 · 498 m away

    Latest activity nearby

    • Zoning review

      Closed

      400 FRONT ST W · Nov 23, 2026 · 227 m away
    • Building permit

      Proposal for interior alterations to party room to install a glass screen.

      26 FORT YORK BLVD · Nov 20, 2026 · 120 m away
    • Building permit

      Proposal for installation of pre-fabricated wood frame geodesic dome structure and accompanying floor system. three domes to be installed, QTY 2 17' wide domes and QTY 1 22' wide dome. Domes to be used as a temporary event space during the winter months

      486 FRONT ST W · Nov 18, 2026 · 255 m away
    • Building permit

      PROPOSED GAMING ARCADE AND SECONDARY CAFE USE

      365 FRONT ST W · Nov 17, 2026 · 259 m away
    • Building permit

      Proposal for interior alterations to PH-7 unit

      21 ICEBOAT TER · Nov 17, 2026 · 279 m away
    • Building permit

      2 ground signs**1-9 CONCORD CITYPLACE WAY**

      23 SPADINA AVE · Nov 10, 2026 · 137 m away
    • Building permit

      Proposal to construct a temporary shipping container structure. Set up - Oct 30, 2026; Tear down - Jan. 31, 2027

      400 FRONT ST W · Nov 10, 2026 · 227 m away
    • Building permit

      REVISION - designate the patio as a private patio Proposal for interior alterations -Restaurant greater than 30 seats

      486 FRONT ST W · Nov 10, 2026 · 255 m away
    • Building permit

      Proposed modernaization and replacement of the existing Fire Alarm Control Panel (FACP) serving two existing residential condominium buildings,

      361 FRONT ST W · Oct 30, 2026 · 282 m away
    • Zoning review

      Closed

      480 FRONT ST W · Oct 29, 2026 · 234 m away

    Neighbourhood: Harbourfront-CityPlace

    About the area around the lot, not the lot itself.

    Nearest station
    St. Andrew Station15 min walk
    Nearest TTC stop
    Spadina Ave at Bremner Blvd North Side1 min walk
    Nearest cycling route
    Northern Linear Park TrlMulti-Use Trail - Boulevard, 1 min walk
    Nearest traffic count
    20,687 vehicles in 8 hSpadina Ave / Blue Jays Way, 60 m away, Apr 23, 2009
    Serious collisions within 500 m
    92021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 4 with cyclists
    Parks
    Northern Linear Park1 min walk
    Canoe Landing3 min walk
    Southern Linear Park4 min walk

    Schools within 1 km

    • JEAN LUMB PUBLIC SCHOOL English Public 4 min walk
    • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 4 min walk
    • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 10 min walk
    • CITY SCHOOL English Public 10 min walk
    • THE WATERFRONT SCHOOL English Public 11 min walk
    • OGDEN JR PUBLIC SCHOOL English Public 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHarbourfront-CityPlaceMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home40%54%
    Population (2021)28,13516,813
    Homes built in 1960 or before0%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHarbourfront-CityPlaceCity median
    Assault883.3636.3
    Robbery48.169.5
    Homicide2.85.3
    Shootings8.510.5
    Auto theft56.6192.6
    Theft over $5,00056.646.1
    Break and enter141.6172.8
    Theft from vehicles121.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.